1 | Operation | Substep | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | Pre-Survey Preparation | - | ||||||||||||||||||||||||
3 | Obtain relevant property documents and information (deeds, plats, etc.) | |||||||||||||||||||||||||
4 | Review and understand local regulations and requirements for boundary surveys | |||||||||||||||||||||||||
5 | Schedule a meeting with the client to discuss project details and expectations | |||||||||||||||||||||||||
6 | Coordinate with other stakeholders, such as neighboring property owners or government agencies | |||||||||||||||||||||||||
7 | Field Survey Preparation | - | ||||||||||||||||||||||||
8 | Research the history of the property and any related legal documents | |||||||||||||||||||||||||
9 | Gather necessary surveying equipment (theodolite, GPS, total station, etc.) | |||||||||||||||||||||||||
10 | Test the survey equipment and ensure it is in proper working order | |||||||||||||||||||||||||
11 | Develop a survey plan and timeline | |||||||||||||||||||||||||
12 | Prepare survey markers and flags for boundary identification | |||||||||||||||||||||||||
13 | Request additional data or documents as needed | |||||||||||||||||||||||||
14 | Ensure all surveying equipment is calibrated and in working condition | |||||||||||||||||||||||||
15 | Review safety protocols and provide necessary personal protective equipment (PPE) | |||||||||||||||||||||||||
16 | Confirm access to the property and any necessary permissions | |||||||||||||||||||||||||
17 | Install temporary marks for boundary identification | |||||||||||||||||||||||||
18 | On-Site Boundary Survey | - | ||||||||||||||||||||||||
19 | Begin by establishing a control point network for accurate measurements | |||||||||||||||||||||||||
20 | Research the property and survey area for existing boundary markers and/or survey records | |||||||||||||||||||||||||
21 | Confirm boundary description with client | |||||||||||||||||||||||||
22 | Locate and identify existing boundary markers, monuments, or reference points | |||||||||||||||||||||||||
23 | Prepare survey report and/or as-built drawings | |||||||||||||||||||||||||
24 | Use surveying techniques to measure and document the boundaries accurately | |||||||||||||||||||||||||
25 | Document any encroachments or discrepancies found during the survey | |||||||||||||||||||||||||
26 | Complete a record of the property lines and boundaries | |||||||||||||||||||||||||
27 | Take photographs or videos to support survey findings | |||||||||||||||||||||||||
28 | Review/update survey control points as needed | |||||||||||||||||||||||||
29 | Determine the location of any water sources or other features that may affect the survey | |||||||||||||||||||||||||
30 | Establish control points within the survey area | |||||||||||||||||||||||||
31 | Analysis and Documentation | - | ||||||||||||||||||||||||
32 | Record GPS coordinates of boundary markers and any other points of interest | |||||||||||||||||||||||||
33 | Collect and organize all field data, measurements, and observations | |||||||||||||||||||||||||
34 | Confirm with client the boundary lines and coordinates | |||||||||||||||||||||||||
35 | Perform mathematical calculations to determine boundary lines and dimensions | |||||||||||||||||||||||||
36 | Confirm legal access to the survey area | |||||||||||||||||||||||||
37 | Record any topographic features or other details related to the survey | |||||||||||||||||||||||||
38 | Prepare a detailed boundary survey report, including maps, diagrams, and legal descriptions | |||||||||||||||||||||||||
39 | Record the date, time, location, and other relevant information for each boundary marker | |||||||||||||||||||||||||
40 | Verify that the survey meets all local regulations and professional standards | |||||||||||||||||||||||||
41 | Collect and document evidence of boundary disputes, and other relevant information | |||||||||||||||||||||||||
42 | Review the report for accuracy and completeness before finalizing | |||||||||||||||||||||||||
43 | Research the historical records associated with the survey area | |||||||||||||||||||||||||
44 | Compare the survey results to previous surveys and records | |||||||||||||||||||||||||
45 | Evaluate the accuracy of existing boundary markers and monuments | |||||||||||||||||||||||||
46 | Client Communication and Approval | - | ||||||||||||||||||||||||
47 | Present the completed boundary survey report to the client | |||||||||||||||||||||||||
48 | Document any evidence of boundary disputes or encroachments | |||||||||||||||||||||||||
49 | Research and analyze relevant legal documents, such as deed records and court decisions | |||||||||||||||||||||||||
50 | Review applicable court cases to ensure survey is legally defensible | |||||||||||||||||||||||||
51 | Take measurements and document details such as tree heights, slopes, distances, and other features | |||||||||||||||||||||||||
52 | Explain the findings, including any encroachments or boundary issues identified | |||||||||||||||||||||||||
53 | Document the land surveyor’s observations, measurements, and conclusions in a written report | |||||||||||||||||||||||||
54 | Notify concerned parties of survey results | |||||||||||||||||||||||||
55 | Address any questions or concerns the client may have | |||||||||||||||||||||||||
56 | Obtain client approval and signatures on the final survey report | |||||||||||||||||||||||||
57 | Provide the client with copies of all relevant documents and survey records | |||||||||||||||||||||||||
58 | Schedule a meeting with the client to discuss the scope of the survey and any specific questions or requests | |||||||||||||||||||||||||
59 | Regulatory Compliance | - | ||||||||||||||||||||||||
60 | Provide the client with an estimate of the cost and timeline for completing the survey | |||||||||||||||||||||||||
61 | Submit the boundary survey report to the appropriate local government agencies, if required | |||||||||||||||||||||||||
62 | Explain the survey process and any related regulations or restrictions | |||||||||||||||||||||||||
63 | Follow up with regulatory agencies to ensure compliance and address any additional requirements | |||||||||||||||||||||||||
64 | Maintain copies of all communication and documentation related to regulatory compliance | |||||||||||||||||||||||||
65 | Provide the client with any applicable survey results or reports prior to the start of the survey | |||||||||||||||||||||||||
66 | Post-Survey Activities | - | ||||||||||||||||||||||||
67 | Update property records with the newly established boundaries and any encroachments | |||||||||||||||||||||||||
68 | Provide ongoing support and assistance to the client regarding the survey findings | |||||||||||||||||||||||||
69 | Archive all survey data, including field notes, measurements, reports, and photographs | |||||||||||||||||||||||||
70 | Conduct regular maintenance and periodic re-surveys as needed to ensure boundary integrity | |||||||||||||||||||||||||
71 | Continuously improve surveying processes and procedures based on lessons learned. |
1 | Operation | susbstep_title | details | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | Preparations | - | ||||||||||||||||||||||||
3 | Review architectural drawings and specifications related to elevation levels. | |||||||||||||||||||||||||
4 | Coordinate with project team members to ensure understanding of requirements. | |||||||||||||||||||||||||
5 | Gather necessary equipment and tools for performing elevation level loop. | |||||||||||||||||||||||||
6 | Check and calibrate all survey instruments | |||||||||||||||||||||||||
7 | Site Inspection | - | ||||||||||||||||||||||||
8 | Conduct a visual inspection of the construction site to identify any existing elevation issues. | |||||||||||||||||||||||||
9 | Install reference points for the loop | |||||||||||||||||||||||||
10 | Confirm all elevation points to be surveyed | |||||||||||||||||||||||||
11 | Check for any obstructions or uneven surfaces that may affect the accuracy of the elevation level loop. | |||||||||||||||||||||||||
12 | Set out and orient the necessary equipment for the loop | |||||||||||||||||||||||||
13 | Ensure the site is clear of debris and obstacles to allow easy movement during the process. | |||||||||||||||||||||||||
14 | Measure the distance between elevation points using a surveyor’s tape or measuring wheel | |||||||||||||||||||||||||
15 | Setting Up Equipment | - | ||||||||||||||||||||||||
16 | Establish control points for the loop | |||||||||||||||||||||||||
17 | Establish the datum plane for the survey | |||||||||||||||||||||||||
18 | Ensure the elevation level instrument is calibrated and in proper working condition. | |||||||||||||||||||||||||
19 | Check the accuracy of previous loop measurements to ensure the loop remains within the established limits | |||||||||||||||||||||||||
20 | Set up a tripod or stable support for the elevation level instrument. | |||||||||||||||||||||||||
21 | Install reference stakes at each elevation point to indicate the location of the loop | |||||||||||||||||||||||||
22 | Set up a communications plan and safety protocols for the survey | |||||||||||||||||||||||||
23 | Adjust the instrument to the desired reference point or benchmark elevation. | |||||||||||||||||||||||||
24 | Test the accuracy of the reference stakes using a laser level, if available | |||||||||||||||||||||||||
25 | Verify the accuracy of the instrument by comparing readings to known elevations if available. | |||||||||||||||||||||||||
26 | Ensure the loop is free of any obstructions or interferences | |||||||||||||||||||||||||
27 | Establishing Benchmark | - | ||||||||||||||||||||||||
28 | Check for levelness of the tripod or stable support | |||||||||||||||||||||||||
29 | Locate a stable and permanent benchmark on the construction site. | |||||||||||||||||||||||||
30 | Check the area for any obstructions that might interfere with the elevations readings | |||||||||||||||||||||||||
31 | Take enough reference readings to ensure accuracy of measurements | |||||||||||||||||||||||||
32 | Record the elevation of the benchmark using the elevation level instrument. | |||||||||||||||||||||||||
33 | Conduct a trial run of the measurements to ensure accuracy | |||||||||||||||||||||||||
34 | Mark the benchmark clearly for future reference. | |||||||||||||||||||||||||
35 | Take a photograph of the benchmark and the surrounding area | |||||||||||||||||||||||||
36 | Determining Elevation Points | - | ||||||||||||||||||||||||
37 | Record and document all measurements taken | |||||||||||||||||||||||||
38 | Identify the desired elevation points based on project requirements. | |||||||||||||||||||||||||
39 | Double check the accuracy of the benchmark elevation | |||||||||||||||||||||||||
40 | Place a leveling rod or staff at each elevation point. | |||||||||||||||||||||||||
41 | Document the elevation of the benchmark in the logbook | |||||||||||||||||||||||||
42 | Take measurements using the elevation level instrument to determine the elevation of each point. | |||||||||||||||||||||||||
43 | Install a permanent marker for the benchmark in the ground | |||||||||||||||||||||||||
44 | Notify the project manager of the benchmark establishment | |||||||||||||||||||||||||
45 | Record the readings accurately for further analysis and documentation. | |||||||||||||||||||||||||
46 | Compare the readings to the project requirements to ensure accuracy | |||||||||||||||||||||||||
47 | Calculations and Analysis | - | ||||||||||||||||||||||||
48 | Make any necessary adjustments and corrections to the elevation points as needed | |||||||||||||||||||||||||
49 | Calculate the difference in elevations between benchmark and each elevation point. | |||||||||||||||||||||||||
50 | Repeat the process for all elevation points | |||||||||||||||||||||||||
51 | Analyze the elevation discrepancies and identify any areas requiring adjustments. | |||||||||||||||||||||||||
52 | Determine if any corrections or modifications are needed to achieve desired elevation levels. | |||||||||||||||||||||||||
53 | Adjustments and Corrections | - | ||||||||||||||||||||||||
54 | Plot elevation points on a map to visualize elevations | |||||||||||||||||||||||||
55 | Make necessary adjustments to the construction elements to achieve desired elevations. | |||||||||||||||||||||||||
56 | Calculate any required slopes or grades | |||||||||||||||||||||||||
57 | Compare the results to the desired design elevations | |||||||||||||||||||||||||
58 | Coordinate with other trades or contractors involved in the project to align elevation levels. | |||||||||||||||||||||||||
59 | Document any changes made to ensure proper communication and future reference. | |||||||||||||||||||||||||
60 | Calculate the total elevation difference between points | |||||||||||||||||||||||||
61 | Final Verification | - | ||||||||||||||||||||||||
62 | Calculate the average elevation of all points | |||||||||||||||||||||||||
63 | Use a datum to ensure the accuracy of the adjustments | |||||||||||||||||||||||||
64 | Revisit each elevation point and recheck the readings to confirm accuracy. | |||||||||||||||||||||||||
65 | Calculate the total elevation change between points | |||||||||||||||||||||||||
66 | Record the new elevation levels after adjustments have been made | |||||||||||||||||||||||||
67 | Compare the adjusted elevations to the initial benchmark for validation. | |||||||||||||||||||||||||
68 | Determine the total amount of fill or cut needed to achieve desired elevations | |||||||||||||||||||||||||
69 | Update the digital maps, drawings, and elevation points in the surveying software | |||||||||||||||||||||||||
70 | Inspect the adjusted elevations and verify the accuracy of the work | |||||||||||||||||||||||||
71 | Evaluate the accuracy of the measurements and adjust accordingly | |||||||||||||||||||||||||
72 | Document the final elevation levels for the construction site. | |||||||||||||||||||||||||
73 | Reporting and Documentation | - | ||||||||||||||||||||||||
74 | Verify the accuracy and validity of the calculations | |||||||||||||||||||||||||
75 | Re-measure and update the elevations points if necessary | |||||||||||||||||||||||||
76 | Cross-check all calculations to ensure accuracy of the adjustments | |||||||||||||||||||||||||
77 | Prepare a comprehensive report summarizing the elevation level loop process. | |||||||||||||||||||||||||
78 | Submit the corrected elevation levels to the client or project manager for review and approval | |||||||||||||||||||||||||
79 | Include all recorded measurements, calculations, adjustments, and any other relevant information. | |||||||||||||||||||||||||
80 | Store the report and all supporting documentation in a secure and accessible location for future reference. | |||||||||||||||||||||||||
81 | Note: The above checklist is a general guide and may vary depending on the specific requirements of each construction organization and project. | |||||||||||||||||||||||||
82 | Generate digital copies of the report and store them in a secure cloud storage | |||||||||||||||||||||||||
83 | Issue a copy of the report to the project manager and other stakeholders | |||||||||||||||||||||||||
84 | Prepare an executive summary of the report for quick reference | |||||||||||||||||||||||||
85 | Present the report to the team and discuss results and any necessary adjustments or corrections | |||||||||||||||||||||||||
86 | Archive the report for future reference |
1 | header_title | susbstep_title | details | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | GPS RTK Survey Checklist for Real Estate Organizations | - | ||||||||||||||||||||||||
3 | 1. *Preparation Phase | |||||||||||||||||||||||||
4 | Identify the purpose and objectives of the survey. | |||||||||||||||||||||||||
5 | Determine the survey area boundaries and coordinates. | |||||||||||||||||||||||||
6 | Obtain necessary permissions or permits for conducting the survey. | |||||||||||||||||||||||||
7 | Define the level of accuracy required for the survey. | |||||||||||||||||||||||||
8 | Select appropriate GPS RTK equipment and software. | |||||||||||||||||||||||||
9 | Ensure all equipment is in working condition and properly calibrated. | |||||||||||||||||||||||||
10 | Prepare necessary field supplies such as batteries, chargers, markers, etc. | |||||||||||||||||||||||||
11 | 2. *Fieldwork Phase | |||||||||||||||||||||||||
12 | Conduct a site visit to familiarize with the survey area and identify any potential obstacles or challenges. | |||||||||||||||||||||||||
13 | Set up a base station at a known reference point with good satellite visibility. | |||||||||||||||||||||||||
14 | Establish communication between the base station and the rover. | |||||||||||||||||||||||||
15 | Perform a base station initialization and check for a stable and accurate signal. | |||||||||||||||||||||||||
16 | Set up the rover unit and verify its correct operation. | |||||||||||||||||||||||||
17 | Start the RTK survey process by collecting data points at predetermined locations. | |||||||||||||||||||||||||
18 | Follow appropriate survey techniques and procedures to ensure accuracy. | |||||||||||||||||||||||||
19 | Record additional relevant information such as physical features, landmarks, or any changes in the environment. | |||||||||||||||||||||||||
20 | 3. *Data Management Phase | |||||||||||||||||||||||||
21 | Regularly check the quality and accuracy of the collected data during the survey. | |||||||||||||||||||||||||
22 | Perform necessary post-processing of the collected data using appropriate software. | |||||||||||||||||||||||||
23 | Validate and adjust the collected data to achieve the desired accuracy level. | |||||||||||||||||||||||||
24 | Create a comprehensive survey report with detailed information about the survey, methodology, and results. | |||||||||||||||||||||||||
25 | Generate accurate maps, plots, or drawings using the collected data. | |||||||||||||||||||||||||
26 | Store and organize the survey data in a secure and accessible manner. | |||||||||||||||||||||||||
27 | Ensure proper backup and archiving of the survey data for future reference. | |||||||||||||||||||||||||
28 | 4. *Quality Control Phase | |||||||||||||||||||||||||
29 | Conduct a thorough review of the survey data and reports to identify any errors or inconsistencies. | |||||||||||||||||||||||||
30 | Perform necessary checks and verifications to ensure the accuracy and reliability of the survey results. | |||||||||||||||||||||||||
31 | Cross-check the collected data with other available sources or survey methods. | |||||||||||||||||||||||||
32 | Seek feedback or input from other professionals or stakeholders for a comprehensive quality control review. | |||||||||||||||||||||||||
33 | Address any identified issues or discrepancies and make necessary corrections or adjustments. | |||||||||||||||||||||||||
34 | Review and finalize the survey report and data before sharing or distributing it to relevant parties. | |||||||||||||||||||||||||
35 | Note: This checklist provides a general framework for a GPS RTK survey in the real estate industry. Depending on the specific requirements or regulations, additional steps or considerations may be necessary. | |||||||||||||||||||||||||
36 | Determine the survey area boundary markers and coordinates | |||||||||||||||||||||||||
37 | Identify any potential safety hazards in the survey area | |||||||||||||||||||||||||
38 | Adjust the survey equipment settings to the specific requirements of the survey | |||||||||||||||||||||||||
39 | Use appropriate survey techniques to ensure the accuracy of the collected data | |||||||||||||||||||||||||
40 | Use additional methods or tools to verify the accuracy of the survey results | |||||||||||||||||||||||||
41 | Seek professional advice or guidance if necessary to ensure the accuracy of the survey | |||||||||||||||||||||||||
42 | Document and store the survey data in accordance with applicable regulations or standards | |||||||||||||||||||||||||
43 | Ensure that the survey results meet the accuracy requirements of the real estate organization | |||||||||||||||||||||||||
44 | Check for any discrepancies between the survey results and other sources of data | |||||||||||||||||||||||||
45 | Have a qualified professional review and approve the survey results before sharing or distributing it |
1 | header_title | susbstep_title | details | |||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | Preparation | - | ||||||||||||||||||||||||
3 | Review project plans, specifications, and survey data | |||||||||||||||||||||||||
4 | Determine required stakes and survey points | |||||||||||||||||||||||||
5 | Coordinate with project team and subcontractors for stakeout requirements | |||||||||||||||||||||||||
6 | Field Work | - | ||||||||||||||||||||||||
7 | Ensure all equipment is calibrated and in working order | |||||||||||||||||||||||||
8 | Conduct a site visit to identify existing features and conditions | |||||||||||||||||||||||||
9 | Double check that all survey data is up to date | |||||||||||||||||||||||||
10 | Bring additional help to the job site as required | |||||||||||||||||||||||||
11 | Verify and confirm property boundaries and benchmarks | |||||||||||||||||||||||||
12 | Secure necessary safety equipment and clothing | |||||||||||||||||||||||||
13 | Establish control points and reference marks for surveying | |||||||||||||||||||||||||
14 | Set up survey equipment and calibrate as necessary | |||||||||||||||||||||||||
15 | Establish a staging area for equipment and materials | |||||||||||||||||||||||||
16 | Plan the best route for stakeout and field work | |||||||||||||||||||||||||
17 | Collect and plot points for layout of structures | |||||||||||||||||||||||||
18 | Stakeout | - | ||||||||||||||||||||||||
19 | Locate and mark horizontal and vertical positions for structures, utilities, and site features | |||||||||||||||||||||||||
20 | Confirm availability of all necessary supplies and materials | |||||||||||||||||||||||||
21 | Locate and stake out points for utilities | |||||||||||||||||||||||||
22 | Layout and stake out points for roads, sidewalks, and driveways | |||||||||||||||||||||||||
23 | Mark building corners, foundation lines, and grid points | |||||||||||||||||||||||||
24 | Prepare survey data and drawings for field crew | |||||||||||||||||||||||||
25 | Schedule access to the job site | |||||||||||||||||||||||||
26 | Stake out points for foundations, footers, and other structural elements | |||||||||||||||||||||||||
27 | Stake out excavation and grading limits | |||||||||||||||||||||||||
28 | Create a field book to document stakeout and field work | |||||||||||||||||||||||||
29 | Set stakes for roads, curbs, sidewalks, and parking areas | |||||||||||||||||||||||||
30 | Confirm accuracy of stakeout points with on-site measurements and notes | |||||||||||||||||||||||||
31 | Secure necessary permits for work on the job site | |||||||||||||||||||||||||
32 | Stake locations for utilities, including pipes, conduits, and manholes | |||||||||||||||||||||||||
33 | Record all survey data using appropriate methods and tools | |||||||||||||||||||||||||
34 | Place control points for mapping, machine control, and aerial photogrammetry | |||||||||||||||||||||||||
35 | Take photographs of all survey work and stakeout points | |||||||||||||||||||||||||
36 | Establish a communication plan with the project team | |||||||||||||||||||||||||
37 | Quality Control | - | ||||||||||||||||||||||||
38 | Verify accuracy of stakeout measurements and alignments | |||||||||||||||||||||||||
39 | Document any discrepancies or changes from the original plans or field conditions | |||||||||||||||||||||||||
40 | Verify legal access to the job site | |||||||||||||||||||||||||
41 | Establish elevation and reference points for survey control networks | |||||||||||||||||||||||||
42 | Regularly update the survey plan to reflect any changes | |||||||||||||||||||||||||
43 | Check stake locations against project plans and specifications | |||||||||||||||||||||||||
44 | Prepare survey plans for stakeout | |||||||||||||||||||||||||
45 | Place elevation and offset stakes for drainage systems | |||||||||||||||||||||||||
46 | Stake out construction layout for all project features and components | |||||||||||||||||||||||||
47 | Conduct on-site inspections to ensure proper staking and marking | |||||||||||||||||||||||||
48 | Familiarize field crew with survey data and plans | |||||||||||||||||||||||||
49 | Place survey monuments at key points | |||||||||||||||||||||||||
50 | Document any deviations or discrepancies for resolution | |||||||||||||||||||||||||
51 | As-Built Surveys | - | ||||||||||||||||||||||||
52 | Confirm that all survey points are marked correctly and in the proper locations | |||||||||||||||||||||||||
53 | Mark outlines of structures for foundations or other components | |||||||||||||||||||||||||
54 | Establish points for laser scanning data collection | |||||||||||||||||||||||||
55 | Verify that all construction stakes are in place and undisturbed | |||||||||||||||||||||||||
56 | Perform as-built surveys to verify constructed positions and dimensions | |||||||||||||||||||||||||
57 | Check for any discrepancies between the design plans and as-built measurements | |||||||||||||||||||||||||
58 | Record any changes or modifications made during construction | |||||||||||||||||||||||||
59 | Compare as-built measurements with original plans and specifications | |||||||||||||||||||||||||
60 | Document any corrections or adjustments to stakeout measurements | |||||||||||||||||||||||||
61 | Prepare accurate as-built drawings and reports for documentation | |||||||||||||||||||||||||
62 | Reconfirm alignment and location of proposed structures | |||||||||||||||||||||||||
63 | Communication and Collaboration | - | ||||||||||||||||||||||||
64 | Quality check all as-built measurements and record any discrepancies | |||||||||||||||||||||||||
65 | Verify that all stakeouts are in compliance with local codes and regulations | |||||||||||||||||||||||||
66 | Maintain regular communication with project team and stakeholders | |||||||||||||||||||||||||
67 | Document any changes to the original design that may impact the overall project | |||||||||||||||||||||||||
68 | Coordinate with contractors to address any issues or changes in staking requirements | |||||||||||||||||||||||||
69 | Update existing maps and records to incorporate new construction | |||||||||||||||||||||||||
70 | Provide stakeholders with as-built survey drawings and reports | |||||||||||||||||||||||||
71 | Provide clear and accurate information to subcontractors and field personnel | |||||||||||||||||||||||||
72 | Archive the as-built drawings and reports in a secure location | |||||||||||||||||||||||||
73 | Collaborate with surveyors, architects, and engineers to ensure alignment with design intent | |||||||||||||||||||||||||
74 | Keep a record of all communication and collaboration activities | |||||||||||||||||||||||||
75 | Project Completion | - | ||||||||||||||||||||||||
76 | Perform post-construction surveys to ensure accuracy of the as-built | |||||||||||||||||||||||||
77 | Establish protocols for resolving conflicts in data or measurements | |||||||||||||||||||||||||
78 | Verify accuracy of measurements between adjacent structures | |||||||||||||||||||||||||
79 | Remove temporary stakes and markers once construction is complete | |||||||||||||||||||||||||
80 | Finalize and submit as-built drawings and reports | |||||||||||||||||||||||||
81 | Document any changes to the project scope or staking requirements | |||||||||||||||||||||||||
82 | Compare the as-built drawings to the original plans to identify any discrepancies | |||||||||||||||||||||||||
83 | Inspect and document the condition of all construction materials used | |||||||||||||||||||||||||
84 | Archive project documentation and survey records for future reference | |||||||||||||||||||||||||
85 | Develop and document procedures for coordinating with stakeholders | |||||||||||||||||||||||||
86 | Conduct a post-project review to identify lessons learned and areas for improvement | |||||||||||||||||||||||||
87 | Set expectations for all parties involved in the communication and collaboration process | |||||||||||||||||||||||||
88 | Prepare final billing invoice for the client | |||||||||||||||||||||||||
89 | Conduct regular meetings with stakeholders to discuss progress and potential issues | |||||||||||||||||||||||||
90 | Take photos of the completed project | |||||||||||||||||||||||||
91 | Proactively address any potential conflicts or discrepancies in measurements or data | |||||||||||||||||||||||||
92 | Obtain a signed release of lien from the client | |||||||||||||||||||||||||
93 | Request final payment from the client | |||||||||||||||||||||||||
94 | Follow up on any outstanding issues or requests from the client | |||||||||||||||||||||||||
95 | Verify that the construction meets all project requirements |