1 | Respondent ID | Start Date | End Date | Order the following elements based on your priorities for the community with your highest priority being at the top. | If you have other priorities, what are they and what ranking would you give them? | If you had $2 million to improve Greater Eastwood how would you spend it? | ||||||||||||||||||||
2 | Avoid BUS ONLY overpass on Lockwood. | Avoid ALL TRAFFIC overpass on Lockwood. | Avoid property implications, specifically house takes. | Avoid loss of trees on Lockwood. (Including via tree relocation) | Avoid increasing risk to property flooding. | Avoid increasing risk to road (but not property) flooding. | Avoid designs that eliminate the center esplanade on Lockwood. | Avoid Lockwood for the project. (Knowing it means the loss of millions of dollars of roadway and drainage improvements) | Avoid the loss of general traffic lanes. | Other. (Please specify inext question) | Open-Ended Response | Open-Ended Response | ||||||||||||||
3 | Overall Ranking | #1 | #2 | #3 | #4 | #6 | #8 | #5 | #7 | #9 | #10* | |||||||||||||||
4 | 118280645559 | 3/28/23 15:22 | 3/28/23 15:25 | 5 | 10 | 1 | 2 | 3 | 4 | 6 | 8 | 9 | 7 | Quiero que lo hagan hace falta m‡s transporte pœblico. | Har’a m‡s carriles de Metro. | |||||||||||
5 | 118279022073 | 3/27/23 3:33 | 3/27/23 3:45 | 2 | 3 | 1 | 4 | 5 | 9 | 6 | 7 | 8 | 10 | Se deber’an usar para eliminar el sonido de los trenes en los cruces cerca de viviendas y por lo menos un puente peatonal para las personas sin veh’culos y ni–os que caminan de casa a la escuela. | ||||||||||||
6 | 118278812627 | 3/26/23 19:54 | 3/26/23 20:00 | 1 | 7 | 5 | 3 | 4 | 6 | 2 | 8 | 9 | 10 | convert the train intersections in no horn/no noise intersections like the one on lawndale close to the Kipp school | ||||||||||||
7 | 118286514137 | 2023-04-04 08:12:25 | 2023-04-04 08:13:14 | 2 | 1 | 3 | 4 | 5 | 6 | 7 | 9 | 8 | 10 | |||||||||||||
8 | 118286095801 | 2023-04-03 17:33:47 | 2023-04-03 17:40:11 | 3 | 4 | 7 | 2 | 8 | 10 | 1 | 6 | 5 | 9 | Ranking 3 of 10 - minimize impact of Union Pacific stoppage and other train stoppage on the surrounding community | Create high speed lanes AND car lanes AND pedestrian walkways using existing roadways and underpasses along Scott/York or Cullen Blvd, with a priority to avoid or mitigate excessive railway stoppages | |||||||||||
9 | 118284568384 | 2023-04-01 09:36:12 | 2023-04-01 09:42:05 | 6 | 2 | 1 | 5 | 4 | 7 | 3 | 8 | 9 | 10 | pedestrian infrastructure, stop trains from stopping at crossings, traffic calming on neighborhood streets | ||||||||||||
10 | 118284492192 | 2023-04-01 06:36:17 | 2023-04-01 07:02:59 | 3 | 2 | 4 | 10 | 5 | 6 | 8 | 1 | 7 | 9 | Avoid the risk of increase of homeless and panhandlers taking over like they have on the Harrisburg metro rail strip. | Improve on what is present. If this has to be a partnership with METRO focus on the damages/aftermath that the metro rail has done on Harrisburg. Focus on the parks and lack of attention they have. Look at the aftermath of the bike lanes fix that too before it gets messier. City signs (stop signs, one way signs..etc), The roads in particular that first responders, school busses, metro busses, and the public take to avoid the long train wait. Those roads have many potholes and even though many have been filled the actual roads need to be fixed. The band aid of filling potholes can only do so much. Im sure drainage improvements can be done without having to build an overpass. | |||||||||||
11 | 118283713076 | 2023-03-31 09:00:05 | 2023-03-31 09:02:20 | 5 | 4 | 2 | 6 | 7 | 8 | 9 | 1 | 3 | 10 | |||||||||||||
12 | 118282964984 | 2023-03-30 16:30:03 | 2023-03-30 16:34:38 | 3 | 2 | 8 | 4 | 5 | 6 | 1 | 7 | 9 | 10 | build more rail. there has to be rail to the galleria. we have rail in the east end, build it out to Hobby Airport and up to IAH and to the Galleria. bus lanes are pretty close to useless | street improvements, lighting, signage | |||||||||||
13 | 118282455641 | 2023-03-30 08:17:20 | 2023-03-30 08:19:17 | 5 | 4 | 6 | 1 | 3 | 7 | 2 | 9 | 8 | 10 | green space, bikes lanes, fix the crumbling sidewalks | ||||||||||||
14 | 118282064342 | 2023-03-29 21:03:41 | 2023-03-29 21:08:23 | 8 | 9 | 1 | 4 | 2 | 3 | 5 | 7 | 6 | 10 | I think an overpass would be okay if necessary and if the route has highest potential for ridership | Improvements and renovations to Eastwood Park | |||||||||||
15 | 118282063924 | 2023-03-29 21:00:59 | 2023-03-29 21:07:31 | 2 | 1 | 5 | 4 | 6 | 7 | 3 | 8 | 9 | 10 | Improve streets and drainage to reduce flooding. Add more earth and plants to facilitate with absorbing water. | ||||||||||||
16 | 118282063744 | 2023-03-29 21:02:50 | 2023-03-29 21:07:13 | 3 | 2 | 6 | 4 | 7 | 9 | 5 | 1 | 8 | 10 | $2 million is not nearly enough for selling the soul of our neighborhood | ||||||||||||
17 | 118282036527 | 2023-03-29 20:16:02 | 2023-03-29 20:20:48 | 2 | 1 | 5 | 4 | 3 | 8 | 6 | 7 | 9 | 10 | Sidewalks, many are difficult to walk due to age and tree root growth | ||||||||||||
18 | 118281784001 | 2023-03-29 14:54:03 | 2023-03-29 14:57:57 | 3 | 2 | 1 | 7 | 6 | 8 | 4 | 9 | 5 | 10 | Include a pedestrian overpass/underpass. | Replace as many sidewalks as possible. | |||||||||||
19 | 118281733070 | 2023-03-29 14:04:37 | 2023-03-29 14:08:01 | 1 | 8 | 2 | 4 | 3 | 7 | 5 | 6 | 9 | 10 | Train overpass for all traffic and improved sidewalk for pedestrians | ||||||||||||
20 | 118281713886 | 2023-03-29 13:34:31 | 2023-03-29 13:49:40 | 1 | 2 | 9 | 5 | 4 | 6 | 7 | 8 | 3 | 10 | On the sidewalk, Road, and the park in our neighborhood. | ||||||||||||
21 | 118281641765 | 2023-03-29 12:25:38 | 2023-03-29 12:45:46 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | I agree with the association's priorities - eliminate the overpass all together. Chose an alternate route. However, long term - I suggest that a multi agency collaboration should be explored to fund construction of a train trestle - City, County, FRA, TXDOT, Metro and include the railroad companies. | $2 M doesn't go far but I suggest sidewalk improvements and additional street lighting making the neighborhood more walkable. | |||||||||||
22 | 118281455512 | 2023-03-29 09:53:26 | 2023-03-29 09:59:11 | 1 | 8 | 3 | 5 | 2 | 7 | 4 | 9 | 6 | 10 | METRO work with the community to address the root cause of trains blocking the intersection near Harrisburg and Lockwood. Overpass / underpass would not be needed if trains moved normally and did not park on the tracks for extended periods of time. Buses would run on set schedule and not be trapped behind the trains along with pedestrians, cyclists and motorists. | Lobby to address parked train issues which would improve quality of life for everyone. | |||||||||||
23 | 118281430688 | 2023-03-29 09:31:48 | 2023-03-29 09:37:08 | 4 | 5 | 3 | 1 | 8 | 9 | 2 | 6 | 7 | 10 | Clean up and renovate Eastwood Park. Plant more trees. Improve sidewalks. Address stray dog problem better. Address petty crime more concertedly. More actively protect old trees from being cut down or from being aggressively trimmed. More frequent trash cleanup and pickup (not regular trash pickup, but beautification). | ||||||||||||
24 | 118281338949 | 2023-03-29 08:12:27 | 2023-03-29 08:15:54 | 2 | 1 | 4 | 3 | 5 | 6 | 7 | 8 | 9 | 10 | The BRT is important. It needs an UNDERPASS. | On sidewalks | |||||||||||
25 | 118281314729 | 2023-03-29 07:50:16 | 2023-03-29 07:54:19 | 2 | 1 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Help prevent mass gentrification, try to keep properties for families (and regular income people), prevent Eastwood from becoming the "new Heights". | ||||||||||||
26 | 118280923825 | 2023-03-28 22:46:03 | 2023-03-28 22:50:02 | 3 | 5 | 4 | 1 | 7 | 8 | 2 | 9 | 6 | 10 | Improve sidewalks, roads, clean up vagrant areas - plant more trees | ||||||||||||
27 | 118280902582 | 2023-03-28 21:59:57 | 2023-03-28 22:10:12 | 2 | 1 | 3 | 4 | 6 | 7 | 5 | 9 | 8 | 10 | N/A | Roadway surface improvements on Lockwood and Canal. | |||||||||||
28 | 118280896602 | 2023-03-28 21:51:16 | 2023-03-28 21:58:26 | 1 | 2 | 5 | 6 | 3 | 7 | 4 | 8 | 9 | 10 | Quiet train intersections. | ||||||||||||
29 | 118280888919 | 2023-03-28 21:39:06 | 2023-03-28 21:43:22 | 1 | 4 | 5 | 2 | 6 | 7 | 3 | 10 | 9 | 8 | |||||||||||||
30 | 118280878991 | 2023-03-28 21:20:03 | 2023-03-28 21:24:23 | 3 | 2 | 4 | 5 | 9 | 8 | 6 | 1 | 7 | 10 | Avoid splitting the neighborhood into two parts. The overpass will split Eastwood and limit access for some to the park and other walkable neighborhoods features. | Potholes! More speed bumps to stop people speeding through the neighborhood. Improve sidewalks. Create a dog park! | |||||||||||
31 | 118280783053 | 2023-03-28 18:26:54 | 2023-03-28 18:38:10 | 1 | 2 | 3 | 4 | 8 | 9 | 5 | 7 | 6 | 10 | I do not believe the talk about flooding in Eastwood. A few streets need to be repaired so that the water flows to the drains instead of standing for days or weeks due to sinking streets. | drainage, sidewalks, lighting, street repairs, street leveling for drainage, quiet zone crossings, additional lanes for safe school children pick-up, light-rail policing. | |||||||||||
32 | 118280755535 | 2023-03-28 17:48:49 | 2023-03-28 17:54:31 | 1 | 6 | 3 | 7 | 4 | 5 | 8 | 9 | 2 | 10 | Sidewalk improvement, completing the need improvements to make East End a quiet zone for the train. | ||||||||||||
33 | 118280743729 | 2023-03-28 17:34:51 | 2023-03-28 17:36:30 | 2 | 1 | 4 | 5 | 6 | 7 | 3 | 8 | 9 | 10 | Smaller underpass option for busses and pedestrians | More like 20 million. New streets, all new sidewalks. Redevelopment of park esplanade into a real park with amenities. Further investments made to support Eastwood park plans. | |||||||||||
34 | 118280709210 | 2023-03-28 16:40:13 | 2023-03-28 16:45:33 | 2 | 3 | 4 | 5 | 7 | 8 | 6 | 1 | 9 | 10 | Its just a way for more homeless to invade the area. Metro isn't safe anyway because of the homeless always riding and endangering riders. | Work on the parks for the children. On the sidewalks so they can walk home and not have to divert to the street. So much can be done in the community for the community that doesn't involve metro of all things. | |||||||||||
35 | 118280578574 | 2023-03-28 14:00:25 | 2023-03-28 14:15:27 | 9 | 8 | 3 | 4 | 6 | 7 | 2 | 1 | 5 | 10 | Fix sidewalks and streets. Plant more trees. | ||||||||||||
36 | 118280526292 | 2023-03-28 13:19:02 | 2023-03-28 13:22:27 | 5 | 2 | 1 | 3 | 4 | 9 | 6 | 7 | 8 | 10 | Fix the streets, add new landscape to esplanades. | ||||||||||||
37 | 118280490475 | 2023-03-28 12:41:31 | 2023-03-28 12:46:07 | 3 | 9 | 5 | 2 | 1 | 6 | 7 | 4 | 8 | 10 | Have the trains stop blocking the intersections. More flood prevention parks/green space. Soil cleanup from an the chemical leaks. More pedestrian and bike friendly with completely separate lanes like in the heights. Mixed use buildings. | ||||||||||||
38 | 118280464272 | 2023-03-28 12:13:33 | 2023-03-28 12:19:40 | 5 | 6 | 8 | 7 | 9 | 10 | 4 | 3 | 2 | 1 | Safe crossing zones for Cage ES/Project Chrysalis MS on Ernestine St. and Austin High School on Lockwood Dr. I see the crossings indicated for the schools mentioned but I would like for METRO to guarantee that the crossings will be safe enough. The mark of crossing is on the maps but I don't know what they will look like and I think a simple crossing is not safe enough. | Fix Lockwood and keep the same METRO routes with a middle lane indicating "only METRO" buses. No need for the overpass, that is just an excuse to spend the money. | |||||||||||
39 | 118280430893 | 2023-03-28 11:43:24 | 2023-03-28 11:45:31 | 1 | 2 | 4 | 3 | 5 | 6 | 7 | 9 | 10 | 8 | Truthfully all the priorities are equal to me. By doing 1 it impacts everything | Fix the roads. Lobby the railroad | |||||||||||
40 | 118280429739 | 2023-03-28 11:38:16 | 2023-03-28 11:44:21 | 6 | 7 | 5 | 3 | 8 | 9 | 4 | 2 | 10 | 1 | My number one ranking is relocate this project to an existing underpass and stop insulting me with a bribe of drainage improvements that the city should be doing for its neighborhoods anyway. | Walkability to multi-use areas: care homes, doctor's offices, healthy food stores, low-income housing, a highly apportioned dog park. | |||||||||||
41 | 118280308242 | 2023-03-28 09:40:42 | 2023-03-28 09:51:04 | 5 | 7 | 2 | 1 | 3 | 8 | 4 | 9 | 6 | 10 | Current light rail and bus are often late and/or dirty at times with pee , I would also like that addressed | Improve flow traffic in relation to trains for all drivers, as well as put in more walkable / bike paths in and around bus and light rail stop’s | |||||||||||
42 | 118280162475 | 2023-03-28 07:14:29 | 2023-03-28 07:18:43 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | More trees/shade where there are long, sunny stretches of road/sidewalk; benches in common areas; sidewalk repairs; speed bumps. | ||||||||||||
43 | 118279866098 | 2023-03-27 21:58:48 | 2023-03-27 22:05:56 | 1 | 2 | 6 | 4 | 3 | 8 | 5 | 7 | 9 | 10 | Protected bike lanes, better sidewalks, better streets to avoid water puddling. | ||||||||||||
44 | 118279859721 | 2023-03-27 21:45:38 | 2023-03-27 21:52:51 | 1 | 2 | 3 | 4 | 6 | 9 | 5 | 8 | 7 | 10 | Improve sidewalks and reduce traffic speeds on McKinney | ||||||||||||
45 | 118279855560 | 2023-03-27 21:41:05 | 2023-03-27 21:43:30 | 2 | 1 | 5 | 4 | 6 | 7 | 3 | 8 | 9 | 10 | Improving sidewalks and adding sidewalks. | ||||||||||||
46 | 118279833175 | 2023-03-27 20:51:53 | 2023-03-27 20:55:43 | 9 | 1 | 5 | 4 | 6 | 7 | 3 | 2 | 8 | 10 | We need to do something about the trains. | ||||||||||||
47 | 118279832919 | 2023-03-27 20:41:18 | 2023-03-27 20:55:12 | 4 | 5 | 6 | 2 | 8 | 9 | 3 | 1 | 7 | 10 | Alternate route is paramount!! RANK #1!!! Lockwood for this project should be a NO GO!! Any disruption to the neighborhood should be heavily weighed against and any needs for a transit system route down Lockwood that has not shown to be a need for this neighborhood or it’s ridership should be halted! | Improve the current roads! Any infrastructure improvements for the roads will and should also aid in the perceived flood control that Metro appears to be heavily concerned with! | |||||||||||
48 | 118279806022 | 2023-03-27 19:59:04 | 2023-03-27 20:02:55 | 4 | 5 | 3 | 6 | 2 | 8 | 7 | 1 | 9 | 10 | Improving the sidewalks throughout the neighborhood, not just the ones previously fixed. | ||||||||||||
49 | 118279688654 | 2023-03-27 16:32:42 | 2023-03-27 16:35:59 | 2 | 1 | 4 | 5 | 7 | 8 | 6 | 3 | 9 | 10 | Repaving sidewalks and roads enhancing green spaces | ||||||||||||
50 | 118279681572 | 2023-03-27 16:09:27 | 2023-03-27 16:26:06 | 3 | 2 | 6 | 4 | 7 | 8 | 5 | 1 | 10 | 9 | Keep as many trees and grass as possible on Lockwood. Losing a lane of traffic for cars between Harrisburg and Leeland might be good for the neighborhood's walkability in the longterm. | I would do something to kill train blockages. Over/under passes or raise/lower the trains tracks. Train Quiet Zones. Add more speed cushions on residential streets. Minimum lot size protection for every block. Plant 500 trees and native plants in public and private spaces. Pedestrian overpass on train tracks. Make our school parks [Lantrip basketball courts] open to the public (spark parks). Better more protected bike lanes. Better draining in recurring problem areas, next to Kroger, etc. Public art all over. | |||||||||||
51 | 118279678929 | 2023-03-27 16:20:08 | 2023-03-27 16:22:33 | 1 | 10 | 5 | 4 | 2 | 6 | 3 | 9 | 7 | 8 | New roads. Current potholes are the size of cars | ||||||||||||
52 | 118279665723 | 2023-03-27 16:00:25 | 2023-03-27 16:05:44 | 2 | 5 | 1 | 3 | 6 | 7 | 4 | 8 | 9 | 10 | Environmental safety and limiting damage to natural environment of the neighborhood. Maintain or decrease current noise pollution in the area. Public safety by monitoring air quality affects the project might have | Improve roads (horrible potholes everywhere), put more speed bumps on residential roads, invest in local public schools, community engagement events, and clean streets including eliminating litter and trash. Also, protecting stray animals. | |||||||||||
53 | 118279628014 | 2023-03-27 15:15:59 | 2023-03-27 15:21:52 | 4 | 5 | 1 | 3 | 2 | 7 | 6 | 8 | 9 | 10 | 1) Plant more trees. 2) Replace some of the traffic signals that have been taken out. 3) Clean up some of the dumpy merchant sites on Telephone Road. | ||||||||||||
54 | 118279560782 | 2023-03-27 13:59:09 | 2023-03-27 14:01:36 | 1 | 2 | 4 | 5 | 7 | 8 | 3 | 9 | 6 | 10 | The city/state works with Union Pacific to avoid the need for an overpass and better improve traffic flow and safety in Greater Eastwood. | ||||||||||||
55 | 118279556485 | 2023-03-27 13:50:50 | 2023-03-27 13:56:51 | 1 | 2 | 7 | 5 | 3 | 6 | 4 | 8 | 9 | 10 | Roads and sidewalks- make Eastwood walkable and for exercise | ||||||||||||
56 | 118279480135 | 2023-03-27 10:47:50 | 2023-03-27 12:37:51 | 1 | 2 | 6 | 4 | 7 | 5 | 3 | 9 | 8 | 10 | Eastwood Park improvements, turn Lantrip playground into a spark park, and more walking/bike paths in the neighborhood. | ||||||||||||
57 | 118279474428 | 2023-03-27 12:29:26 | 2023-03-27 12:32:02 | 1 | 2 | 3 | 5 | 9 | 8 | 6 | 4 | 7 | 10 | Adding railroad "no horn" crossing signals throughout Eastwood. Fixing the numerous potholes throughout the area. | ||||||||||||
58 | 118279439529 | 2023-03-27 11:58:03 | 2023-03-27 11:59:02 | 5 | 4 | 6 | 2 | 7 | 8 | 3 | 1 | 9 | 10 | |||||||||||||
59 | 118279395030 | 2023-03-27 11:12:52 | 2023-03-27 11:14:38 | 3 | 1 | 2 | 4 | 5 | 7 | 6 | 8 | 9 | 10 | |||||||||||||
60 | 118279360336 | 2023-03-27 10:41:27 | 2023-03-27 10:44:40 | 2 | 1 | 3 | 5 | 4 | 6 | 9 | 8 | 7 | 10 | - sidewalks - park drive park - dumble street - improved greenspace connector to Eastwood park - if underpass, a green cap for the underpass - if underpass, signaling that would allow general traffic use during a stop train event, while still giving the BRT priority. | ||||||||||||
61 | 118279333261 | 2023-03-27 10:13:29 | 2023-03-27 10:18:31 | 3 | 1 | 2 | 4 | 6 | 7 | 8 | 5 | 9 | 10 | Working with our Rep. Sylvia Garcia to deal with the trains blocking our streets, Ranking #2 | Moving the BRT to Scott street so people can have the choice to ride the Metro Rail or the Rapid Bus | |||||||||||
62 | 118279328669 | 2023-03-27 10:11:33 | 2023-03-27 10:14:03 | 1 | 2 | 3 | 5 | 7 | 9 | 6 | 4 | 8 | 10 | Finding a long-term solution to the train problems (blockages, noise, etc) that are so persistent to the neighborhood. The fact that Metro is spending so much to get around the central problem and leave our neighborhood holding the bag is unacceptable. | ||||||||||||
63 | 118279327838 | 2023-03-27 10:10:35 | 2023-03-27 10:13:16 | 7 | 5 | 2 | 3 | 4 | 8 | 1 | 6 | 9 | 10 | |||||||||||||
64 | 118279308851 | 2023-03-27 09:53:02 | 2023-03-27 09:55:05 | 2 | 1 | 5 | 6 | 7 | 8 | 4 | 3 | 9 | 10 | No overpass!!! | I would build a park in the Park esplanade! I would also like a community compost and small grants to repaint homes or improve/clear out overgrown yards. | |||||||||||
65 | 118279308281 | 2023-03-27 09:51:08 | 2023-03-27 09:54:28 | 2 | 1 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Police presence, Cleaning up junk, and planting more trees | ||||||||||||
66 | 118279294245 | 2023-03-27 09:34:41 | 2023-03-27 09:40:52 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 9 | 8 | 10 | More prominent crosswalks, improved sidewalks, and more greenspace. | ||||||||||||
67 | 118279290268 | 2023-03-27 09:33:57 | 2023-03-27 09:36:57 | 2 | 3 | 6 | 5 | 8 | 9 | 4 | 1 | 7 | 10 | Fixing curbs and sidewalks | ||||||||||||
68 | 118279286940 | 2023-03-27 09:21:28 | 2023-03-27 09:33:49 | 5 | 2 | 6 | 3 | 7 | 8 | 4 | 1 | 9 | 10 | Consider alignments that make full use of the transformational power of BRT/Light Rail. Hirsch and Jensen are alternatives where BRT/LR can enhance changing development patterns in a much more sustainable way. Both Jensen and Hirsch line up with the emerging East River Project. Hirsch could feed into the York-Sampson Corridor, which is another walkable district being developed. Jensen BRT would feed into the east downtown LR district. BRT/LR is not just about transportation. If it were, leaving existing bus lines in place, perhaps with some minor improvements, would make more sense. But BRT/LR is about changing the pattern of development, establishing routes where walkability is already taking place. Transit dollars will have a greater impact on the alternative alignments on Jensen or Hirsch. These alignments should be looked at in detail. Is it critical that the alignments pass through the Eastwood transit center. Could the alignments not continue south and intersect with Segment 3 directly? | ||||||||||||
69 | 118279254385 | 2023-03-27 08:54:50 | 2023-03-27 09:02:46 | 3 | 2 | 4 | 5 | 6 | 7 | 8 | 1 | 10 | 9 | it sounds like the real problem is Union Pacific blocking streets and traffic. why not fix that problem? building an overpass does nothing to resolve UP's disregard for the safety and schedules of East End residents | sidewalks to make neighborhood more walkable cleaning up trash fixing the streets damaged by all the heavy vehicles (like Lockwood) | |||||||||||
70 | 118279237199 | 2023-03-27 08:39:32 | 2023-03-27 08:44:21 | 1 | 2 | 3 | 7 | 5 | 4 | 9 | 8 | 6 | 10 | Street repairs | ||||||||||||
71 | 118279235285 | 2023-03-27 08:37:49 | 2023-03-27 08:42:23 | 3 | 4 | 5 | 7 | 8 | 9 | 2 | 1 | 6 | 10 | Beautify Lockwood, make sure the sidewalks are fixed and walkable, turn Park Dr into a park space, improve roads and preserve wildlife/trees. | ||||||||||||
72 | 118279226078 | 2023-03-27 08:32:32 | 2023-03-27 08:33:08 | 2 | 1 | 4 | 5 | 3 | 6 | 7 | 9 | 8 | 10 | |||||||||||||
73 | 118279224816 | 2023-03-27 08:29:59 | 2023-03-27 08:31:57 | 1 | 2 | 3 | 4 | 5 | 7 | 6 | 10 | 9 | 8 | Improving green spaces and sidewalks. | ||||||||||||
74 | 118279216551 | 2023-03-27 08:22:32 | 2023-03-27 08:24:28 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 1 | 9 | 10 | Street repairs, wider sidewalks, safer passages to walk | ||||||||||||
75 | 118279215599 | 2023-03-27 08:19:53 | 2023-03-27 08:23:41 | 6 | 5 | 7 | 3 | 8 | 9 | 2 | 1 | 4 | 10 | Repave Polk and Leeland and Eastwood and Lockwood. | ||||||||||||
76 | 118279213177 | 2023-03-27 08:20:31 | 2023-03-27 08:21:42 | 1 | 2 | 3 | 5 | 6 | 7 | 8 | 4 | 9 | 10 | |||||||||||||
77 | 118279195140 | 2023-03-27 07:50:57 | 2023-03-27 08:04:44 | 2 | 3 | 1 | 4 | 6 | 7 | 5 | 8 | 9 | 10 | Avoid splitting up the neighborhood, that would be #1. I think this issue is tied with taking houses and over pass. | Encourage more involvement with festivities by creating parks with the existing esplanade. | |||||||||||
78 | 118279187218 | 2023-03-27 07:51:04 | 2023-03-27 07:56:22 | 3 | 2 | 4 | 8 | 5 | 9 | 7 | 1 | 6 | 10 | Would love to hear about Metro choosing Sampson/York - access to purple line and because of probable train underpass | 1. Elimination of train issues 2. Beautification projects such as expansion of Lockwood or park esplanades into actual parks so similar to Heights blvd | |||||||||||
79 | 118279157228 | 2023-03-27 07:18:42 | 2023-03-27 07:20:34 | 4 | 5 | 6 | 3 | 7 | 8 | 2 | 1 | 9 | 10 | Create more protected bike lanes. | ||||||||||||
80 | 118279136257 | 2023-03-27 06:51:44 | 2023-03-27 06:53:05 | 1 | 2 | 3 | 4 | 6 | 7 | 5 | 9 | 8 | 10 | |||||||||||||
81 | 118279135984 | 2023-03-27 06:51:04 | 2023-03-27 06:52:38 | 1 | 7 | 3 | 5 | 2 | 8 | 6 | 9 | 4 | 10 | |||||||||||||
82 | 118279120366 | 2023-03-27 06:25:08 | 2023-03-27 06:27:08 | 2 | 3 | 1 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | |||||||||||||
83 | 118278947170 | 2023-03-27 00:08:51 | 2023-03-27 01:30:12 | 3 | 2 | 5 | 6 | 9 | 7 | 4 | 1 | 8 | 10 | There are way better routes to the west. Waco/Hirsch for example skirts the eastern side of the massive East River project. BRT would increase walkability in a major way. In addition Hirsch feeds into York, another where a new walkabiliy district is emerging. Jensen skirts the western edge of the East River project and could tie into existing east downtown stations. BRT/Light Rail is about much more than transportation. It is about enabling high density resource-efficient walkable development in areas best suited to this kind of development. BRT on Jensen or Hirsch would enable walkable districts way faster than anything on Lockwood. Walkable development will not occur for a long time even with BRT. Hirsch would speed up walkabily and would connect major new high density developments just to the east of downtown. Spend the money where it makes a difference. Higher density development will occur along Harrisburg, but not on Lockwood. Reroute this line to where it makes sense. | ||||||||||||
84 | 118278915431 | 2023-03-27 00:02:53 | 2023-03-27 00:10:39 | 1 | 2 | 7 | 9 | 5 | 6 | 4 | 3 | 8 | 10 | Use the money to fund the quiet zones for the train. Fix pot holes on the road and sidewalks. | ||||||||||||
85 | 118278884355 | 2023-03-26 22:48:01 | 2023-03-26 22:51:19 | 3 | 1 | 4 | 5 | 8 | 9 | 6 | 2 | 7 | 10 | Improving green spaces for children and community. | ||||||||||||
86 | 118278871012 | 2023-03-26 22:16:57 | 2023-03-26 22:24:59 | 2 | 1 | 3 | 5 | 4 | 7 | 6 | 9 | 8 | 10 | I think Lockwood easily makes the most sense for the project and I bought property in Eastwood with heavy consideration coming from the future BRT connection with the green line. The associated sidewalk and road improvements that come along with it are vital. I think the best option for everyone is a bus-only underpass, but I would rather have a bus-only overpass before moving the project to a different corridor. | $2 million buys approximately 3-4 linear miles of new sidewalks. I'd put it all there. Also the Dumble shared path from the East End Mobility Plan to link Telephone to Eastwood Park/Harrisburg. That would be a walking path for many neighbors to get to the LRT. | |||||||||||
87 | 118278870009 | 2023-03-26 22:18:35 | 2023-03-26 22:22:57 | 2 | 1 | 4 | 5 | 3 | 7 | 6 | 9 | 10 | 8 | |||||||||||||
88 | 118278869517 | 2023-03-26 22:19:41 | 2023-03-26 22:22:00 | 2 | 1 | 3 | 6 | 4 | 5 | 7 | 8 | 9 | 10 | |||||||||||||
89 | 118278867430 | 2023-03-26 22:12:13 | 2023-03-26 22:17:55 | 1 | 2 | 3 | 5 | 4 | 7 | 6 | 9 | 8 | 10 | Wide sidewalks with space for healthy shade trees. | Improve the Park Drive Esplanade to make it more of a welcoming gathering space. | |||||||||||
90 | 118278861935 | 2023-03-26 21:50:23 | 2023-03-26 22:06:03 | 1 | 5 | 2 | 3 | 4 | 7 | 6 | 9 | 10 | 8 | Preserving large trees, even if that means moving them to in the ROW or even just inside private property that would provide canopy for the pedestrian areas. | Walkable sidewalks on at least one side of the street. More coordinated historic area signage including the major subdivisions (Eastwood, Lawndale, Broadmoor) and entry points. Some similar to sign on Lockwood and others with color/font style that would work in narrower ROW application. | |||||||||||
91 | 118278861296 | 2023-03-26 21:53:56 | 2023-03-26 22:04:27 | 8 | 9 | 5 | 1 | 3 | 4 | 7 | 10 | 6 | 2 | The plan eliminates the clay/Lockwood/telephone connection. That connection allows people traveling on Lockwood to do turns prior to reaching Polk when coming from I45. It's loss is going to be additional pressure on the light at Polk and on Leeland in at Cage elementary. There needs to be something to remedy that pressure. Preference would be to keep that turning area. They could also add additional lines on Leeland. | There needs to be pedestrian access on the rusk side of the buss overpass to the rapid bus transit station at Harrisburg. Stopped trains will make it near impossible for that station to be used by people on the Rusk side of Harrisburg | |||||||||||
92 | 118278858420 | 2023-03-26 21:54:02 | 2023-03-26 21:57:10 | 2 | 4 | 5 | 7 | 3 | 6 | 8 | 1 | 9 | 10 | Move the project to Samson and extend the Scott railine. | Improve sidewalks I. Broadmore. | |||||||||||
93 | 118278858199 | 2023-03-26 21:55:18 | 2023-03-26 21:56:41 | 1 | 2 | 6 | 3 | 7 | 8 | 4 | 5 | 9 | 10 | Accessible sidewalks | ||||||||||||
94 | 118278856857 | 2023-03-26 21:36:12 | 2023-03-26 21:53:25 | 5 | 8 | 1 | 9 | 2 | 3 | 4 | 6 | 7 | 10 | Put in new sidewalks and streets for all of the Eastwood, Broadmoor, East Lawn etc areas. | ||||||||||||
95 | 118278855956 | 2023-03-26 21:46:35 | 2023-03-26 21:51:10 | 1 | 7 | 4 | 5 | 8 | 9 | 2 | 6 | 3 | 10 | Fixing the potholes, sidewalks, roadways and drainage systems. | ||||||||||||
96 | 118278853697 | 2023-03-26 21:43:35 | 2023-03-26 21:45:47 | 2 | 4 | 6 | 5 | 7 | 8 | 3 | 1 | 9 | 10 | Neighborhood pocket park, improved side walks, sidewalks added by esplanade | ||||||||||||
97 | 118278852901 | 2023-03-26 21:41:34 | 2023-03-26 21:43:54 | 2 | 1 | 5 | 3 | 7 | 8 | 4 | 6 | 9 | 10 | Making it more walkable plus landscaping and beautification | ||||||||||||
98 | 118278851646 | 2023-03-26 21:38:37 | 2023-03-26 21:40:50 | 3 | 2 | 9 | 6 | 8 | 7 | 5 | 1 | 4 | 10 | Move the line off Lockwood. | $2 million is not enough. | |||||||||||
99 | 118278847767 | 2023-03-26 21:23:53 | 2023-03-26 21:31:38 | 7 | 6 | 5 | 2 | 8 | 9 | 3 | 1 | 4 | 10 | TAKE THIS PROJECT TO AN ALTERNATE ROUTE!!! There is NO good option for this ridiculous bus lane in our neighborhood. None. I'd rather things stay the same than have this project run down Lockwood, though I do support the bus and the idea of solutions. Go to Milby! Go to York/Sampson or Wayside/69th st. BOTH OF THOSE HAVE PLENTY OF LANES TO DONATE WITHOUT TAKING HOUSES OR TREE CANOPY. Plus, Milby would include another college campus, HCC! WE HAVE PAID OUR FAIR SHARE ON INFRASTRUCTURE!!!! This is a historic neighborhood and we deserve the right to maintain our integrity! | Improve sidewalks all over the neighborhood and bus shelters on all routes--maybe run an express 80 bus (streets as they are, maybe resurfaced) down Lockwood. | |||||||||||
100 | 118278845322 | 2023-03-26 21:21:37 | 2023-03-26 21:25:40 | 1 | 2 | 3 | 9 | 4 | 7 | 6 | 5 | 8 | 10 | Established quiet zones for rail, Eastwood park improvement, general road improvements (sidewalks included) | ||||||||||||