1 | Title | Section | Status | Construction Type | Project Announced | Last Official Update | Est. Construction Start | Est. Completion | City/Bos. Neighborhood | Owner | Designer | Constructor | Point(s) Of Contact | Website | Join Mailing List Link | Tracker Owner | ||
2 | Albany Street Bike Lanes | Pre-25% design | Quick-build | September 6th, 2022 | September 2024 | Unannounced | Unannounced | Roxbury | "Boston, City of" | Unannounced | Unannounced | Madeline Webster <Madeline.Webster@boston.gov> | https://Boston.gov/Albany-Street | |||||
3 | Allston Multimodal Project | Pre-25% design | Full construction | 2014 | July 18th, 2025 | Unannounced | Unannounced | Allston | "Boston, City of", MassDOT, MBTA, "Brookline, Town of" | Unannounced | Unannounced | Carrie E. Lavallee; Dan Fielding (857-368-8959); <I-90Allston@dot.state.ma.us> | https://Mass.gov/Allston-Multimodal-Project | https://public.govdelivery.com/accounts/MADOT/subscriber/new?topic_id=MADOT_40 | Rani Schloss | |||
4 | Andrew Square Safety Project | Pre-25% design | Unannounced | Spring 2026 | April 29th, 2026 | ? | 2029 | South Boston | "Boston, City of" | Nitsch Engineering; Kittelson & Associates; JM Goldson | Unannounced | Unannounced | https://Boston.gov/Andrew-Sq-Safety | |||||
5 | Beacon Street (Brighton) Safety Updates | Under construction | Full construction | May 6, 2026 | June 9, 2026 | May 2026 | July 2026 | Brighton | "Boston, City of" | City of Boston | Unannounced | Madeline Webster <Madeline.Webster@boston.gov>, Annisha Borah, Matthew Petersen <Matthew.Petersen@Boston.gov> (617-635-1453) | https://Boston.gov/Beacon-Street-Brighton https://www.boston.gov/departments/streets-cabinet/project/beacon-street-brighton-safety-updates | none | Anne Griepenburg (entered) | |||
6 | Beacon Street Historic Bridle Path Reconstruction | Pre-25% design | Full construction | ? | ? | Unannounced | Unannounced | Brookline | MBTA, MassDOT, "Brookline, Town of" | Toole Design | Unannounced | <BridlePath@BrooklineMA.gov> | https://www.BrooklineMA.gov/3542/Beacon-Street-Historic-Bridle-Path-Recon | |||||
7 | Beech St at Elm St Pedestrian Safety Project | 75% design | Full construction | September 2024 | 2026 | Summer 2026 | Cambridge | "Cambridge, City of" | ? | ? | Andreas Wolfe <AWolfe@CambridgeMA.gov> (617-349-9162) | https://camb.ma/beechst https://www.cambridgema.gov/streetsandtransportation/projectsandprograms/beechandelmintersectionproject | ||||||
8 | Belmont Community Path | Phase 1 | 75% design | Full construction | ? | ? | Unannounced | Unannounced | Belmont | "Belmont, Town of", MBTA | Nitsch Engineering | Unannounced | John Michalak <JMichalak@nitscheng.com>; Sean Sanger <SSanger@copley-wolff.com> | https://BelmontCommunityPath.com/belmont-community-path-phase-1 | ||||
9 | Phase 2 | Announced | Full construction | ? | ? | Unannounced | Unannounced | Belmont | "Belmont, Town of", MBTA | Pare Corporation; Toole Design | Unannounced | Belmont Community Development <CommDev@Belmont-MA.gov> | https://BelmontCommunityPathPhase2.com/ | |||||
10 | Bennington / Saratoga Safety Project | Pre-25% design | ? | May 2026 | May 12, 2026 | ? | 2029 | East Boston | "Boston, City of" | ? | ? | Streets Cabinet (617-635-4680) | https://www.boston.gov/departments/streets-cabinet/project/bennington-saratoga-safety-project | Join via form on project website | ||||
11 | Binney/Galileo/Broadway Streetscape Redesign | Under construction | Full construction | October 2016 | ? | 2018 | ? | Cambridge | "Cambridge, City of" | VHB; Sasaki Associates; Alta Planning + Design | ? | Joel Smith <JSmith@CambridgeRedevelopment.org> | https://bit.ly/BinneyGalileoBroadway https://CambridgeRedevelopment.org/projects/binney-galileo-broadway-ksurp-streetscape-redesign | |||||
12 | Blossom Street | Pre-25% design | Full construction | ? | ? | ? | 2027 | West End | "Boston, City of" | Unannounced | Unannounced | ? | https://Boston.gov/BlossomStreet | |||||
13 | Blue Hill Avenue Transportation Action Plan | Pre-25% design | Full construction | September 2019 | August, 19, 2025 | Unannounced | Unannounced | Dorchester, Mattapan | MBTA, "Boston, City of" | ? | ? | <BlueHillAve@Boston.gov> (617-635-3944) | https://Boston.gov/BlueHillAve | |||||
14 | Boston - Bridge Preservation, Cambridge Street over MBTA | 25% design | Full construction | August 2021 | May 13, 2026 | Fall 2027 | 2023 | Charlestown | MassDOT | Gill Engineering Associates Toole Design | Carrie E. Lavallee, P.E., Chief Engineer <MassDOTMajorProjects@dot.state.ma.us> | https://hwy.massdot.state.ma.us/ProjectInfo/Main.asp?ACTION=ViewProject&PROJECT_NO=612989 | ||||||
15 | Boylston Street (Fenway) | Phase 2 | Announced | Unannounced | ? | ? | 2027 | Unannounced | Fenway-Kenmore | "Boston, City of" | Unannounced | Unannounced | <BoylstonStreet@Boston.gov> | https://Boston.gov/Boylston-Street https://www.boston.gov/departments/transportation/boylston-street | ||||
16 | Bow Street Pedestrianization | Announced | Quick-build | September 2025 | ? | Spring 2026 | 2026 | Cambridge | "Cambridge, City of" | Unannounced | Unannounced | Unannounced | https://www.thecrimson.com/article/2025/9/26/bow-street-pedestrianization/ | |||||
17 | Bridge replacement, Memorial Drive over Brookline Street | Pre-25% design | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | MassDOT | Unannounced | Unannounced | <CambridgeReidOverpass@dot.state.ma.us> | https://www.mass.gov/event/cambridge-bridge-replacement-memorial-drive-over-brookline-street-01-06-2026 | |||||
18 | Bridge Replacement, Br# S-17-016, Webster Avenue over MBTA & BMRR | Pre-25% design | Full construction | ? | January 2026 | Fall 2026 | Unannounced | Somerville | MassDOT | ? | ? | Alwin Ramirez; Carrie E. Lavallee <MassDOTMajorProjects@dot.state.ma.us> | https://www.mass.gov/event/somerville-bridge-replacement-br-s-17-016-webster-avenue-over-mbta-bmrr-03-20-2025 https://hwy.massdot.state.ma.us/projectinfo/projectinfo.asp?num=611940 | |||||
19 | Broadway at Wallace Street and Simpson Avenue Pedestrian Safety Improvements | 100% design | Quick-build | Fall 2025 | April 7th, 2026 | Spring 2026 | ? | Somerville | "Somerville, City of" | Unannounced | Unannounced | Greg Hanafin <GHanafin@SomervilleMA.gov>; Rishika Dhawan <RDhawan@SomervilleMA.gov> | https://voice.SomervilleMA.gov/BroadwayWallaceSimpson | https://www.somervillema.gov/departments/ospcd/mobility#newsletter-sign | Dikshant P | |||
20 | Broadway Magoun Reconstruction Project | Pre-25% design | Quick-build | September 2025 | April 7th, 2026 | 2027 | 2029 | Somerville | "Somerville, City of" | Unannounced | Unannounced | Lillian Worth <LWorth@SomervilleMA.gov>; Adam Polinski <APolinski@SomervilleMA.gov>; Kate White <KWhite@SomervilleMA.gov> | https://SomervilleMA.gov/BroadwayMagoun | Dikshant P | ||||
21 | Broadway Safety Improvement Project | Section B | Announced | Quick-build | ? | ? | Late 2026 | Late 2026 | Cambridge | "Cambridge, City of" | ? | ? | Jackie McLaughlin <JMcLaughlin@CambridgeMA.gov> (617-349-4689) | https://CambridgeMA.gov/BroadwaySafety | ||||
22 | Section C | Announced | Partial construction | ? | ? | Late 2026 | Late 2026 | ? | ? | |||||||||
23 | Cambridge Street Safety Improvement Project | Section A | 75% design | Quick-build | ? | April 29th, 2026 | Fall 2026/Spring 2027 | Fall 2027 | Cambridge | "Cambridge, City of" | Toole Design; Kleinfelder | ? | Andreas Wolfe <AWolfe@CambridgeMA.gov> (617-349-9162) | https://CambridgeMA.gov/CambridgeStSafety | https://lp.constantcontactpages.com/sl/SQ6KmIW | |||
24 | Section B | Announced | Quick-build | ? | April 29th, 2026 | Spring/Summer 2028 | Unannounced | ? | ? | |||||||||
25 | Section C | 25% design | Quick-build | ? | April 29th, 2026 | Fall 2026/Spring 2027 | Fall 2027 | Toole Design; Kleinfelder | ? | |||||||||
26 | Centre Street and Walter Street Intersection Improvements | Under construction | ? | ? | June 2025 | October 2026 | Jamaica Plain, Roslindale, West Roxbury | DCR | Howard Stein Hudson | Tasco Construction | ? | https://Mass.gov/event/centre-street-and-walter-street-intersection-pre-construction-meeting-5292025-05-29-2025 | ||||||
27 | Chestnut Hill Avenue Improvements | ? | Quick-build | ? | ? | ? | ? | Brookline | "Brookline, Town of" | Apex | Unannounced | https://BrooklineMA.gov/3906/Chestnut-Hill-Avenue-Improvements | ||||||
28 | Cleveland Circle Intersection and Safety Improvements | Phase 1 | Proposed | Quick-build | April 2026 | April 2026 | May 2026 | May 2026 | Brighton, Brookline | "Boston, City of" | ? | ? | Matthew Petersen, BTD | https://www.boston.gov/departments/transportation/project/cleveland-circle-intersection-and-safety-improvements | ||||
29 | Phase 2 | Full construction | April 2026 | April 2026 | 2028 | ? | Brighton, Brookline | "Boston, City of", MBTA | ? | ? | https://www.boston.gov/departments/transportation/project/cleveland-circle-intersection-and-safety-improvements | |||||||
30 | Columbia Road And Kosciuszko Circle At I-93 Roadway Reconstruction | Pre-25% design | Full construction | ? | ? | Unannounced | Unannounced | Dorchester | MassDOT | Unannounced | Unannounced | Dan Fielding (857-368-8959); BostonColumbiaRoadandK-Circle@dot.state.ma.us | https://Mass.gov/columbia-road-and-kosciuszko-circle-at-i-93-roadway-reconstruction-project | |||||
31 | Columbia Road Transportation Action Plan | Announced | ? | ? | ? | ? | ? | Dorchester | "Boston, City of" | Unannounced | <ColumbiaRoad@boston.gov> (617-635-1705) | https://www.boston.gov/departments/transportation/project/columbia-road-transportation-action-plan | ||||||
32 | Commonwealth Avenue (BU East) Bike Lanes | Announced | ? | ? | Unannounced | Unannounced | Fenway-Kenmore | "Boston, City of" | Unannounced | Unannounced | Unannounced | https://Boston.gov/Comm-Ave | ||||||
33 | Community Path Safety Improvements | Announced | Full construction | 2023 | 2025-12-17 | Spring/Summer 2026 | Unannounced | Somerville | MBTA, "Somerville, City of" | Unannounced | Unannounced | Viola Augustin <VAugustin@SomervilleMA.gov>; Lillian Worth <LWorth@SomervilleMA.gov>; Rishika Dhawan <RDhawan@SomervilleMA.gov> | https://SomervilleMA.gov/CommunityPathSafety | Rani Schloss | ||||
34 | Concord Avenue Bike Lanes | ? | Quick-build | ? | ? | ? | ? | Belmont | "Belmont, Town of" | Nelson Nygaard | ? | ? | https://www.belmont-ma.gov/1634/Concord-Avenue-Bike-Lanes | |||||
35 | Congress Street In Fort Point | Under construction | Quick-build | ? | ? | Summer 2025 | 2027 | Seaport | "Boston, City of" | ? | ? | Stefanie Seskin <Stefanie.Seskin@Boston.gov> (617-635-4574) | https://Boston.gov/departments/public-works/project/congress-street-fort-point | |||||
36 | Cummins Highway | Under construction | Full construction | April 2024 | April 21st, 2026 | 2025 | July 2026 | Mattapan | "Boston, City of" | Unannounced | Unannounced | <cummins@boston.gov> (617-635-4968); Jeffrey Alexis <Jeffrey.Alexis@Boston.gov> | https://Boston.gov/Cummins-Highway | Rani Schloss | ||||
37 | Danehy Park Connector | Pre-25% design | Full construction | November 2021 | May 2026 | 2027 | Unannounced | Cambridge | "Cambridge, City of" | HDR; Halvorson; Westin & Sampson | Unannounced | Charlie Creagh <CCreagh@CambridgeMA.gov> (617-349-9167); Bill Deignan <WDeignan@CambridgeMA.gov> (617-349-4632) | https://camb.ma/danehyconnector | Rani Schloss | ||||
38 | Dartmouth Street Safety And Mobility Project | Partially undone | Quick-build | ? | ? | ? | 2025 | Back Bay | "Boston, City of" | ? | ? | ? | https://Boston.gov/Dartmouth-Street | |||||
39 | Draw Seven Park Renovations Project | Under construction | Full construction | 2023 | April 23rd, 2025 | April 2025 | 2026 | Somerville | DCR | Weston & Sampson | Wes Construction | Ilyse Wolberg <Ilyse.Wolberg@mass.gov> (617-360-1715) | https://www.mass.gov/info-details/draw-seven-park-renovations-project | Dikshant Pradhan | https://www.mass.gov/doc/update-dcr-recreational-advisory-draw-seven-park/download | |||
40 | East Washington Street Quick Build Safety Improvements | Announced | Quick-build | May 6th, 2026 | June 17th, 2026 | Fall 2027 | Fall 2027 | Somerville | "Somerville, City of" | Unannounced | Unannounced | Justin Schreiber <JSchreiber@SomervilleMA.gov>; Rishika Dhawan <RDhawan@SomervilleMA.gov> | https://voice.SomervilleMA.gov/EastWashington | |||||
41 | Egleston Square Redesign | 75% design | Full construction | October 2020 | April 22, 2026 | ? | Unannounced | Jamaica Plain, Roxbury | "Boston, City of" | Unannounced | Unannounced | Boston Transportation (617-635-4680) Streets Cabinet (617-635-4680) | https://www.boston.gov/departments/transportation/project/egleston-square-redesign | https://docs.google.com/forms/d/e/1FAIpQLSfAZTWKmYqmtwh5m6meQwRfqu-1wab7gnqfhVtkykhzd0ntrQ/viewform | ||||
42 | Eliot Bridge Preservation | Under construction | Full construction | ? | ? | January 2025 | Fall 2026 | Allston, Cambridge | MassDOT | ? | Northern Construction | <EliotBridgePreservation@dot.state.ma.us> | https://Mass.gov/Eliot-Bridge-Preservation | |||||
43 | Elm-Beacon Connector | 100% design | Quick-build | September 2024 | April 7th, 2026 | Summer 2026 | Fall 2026 | Somerville | "Somerville, City of" | City of Somerville | Unannounced | Adam Polinski <APolinski@SomervilleMA.gov>; Kate White <KWhite@SomervilleMA.gov>; Lillian Worth <LWorth@SomervilleMA.gov> | https://SomervilleMA.gov/ElmBeacon | Rani Schloss | ||||
44 | Everett-Somerville Mystic River Bicycle And Pedestrian Crossing | 100% design | Full construction | ? | ? | Summer 2026 | Unannounced | Everett, Somerville | MassDOT | Unannounced | Unannounced | William Henry Conroy; Carrie Lavallee; <MysticRiverBikePedBridge@dot.state.ma.us> | https://www.mass.gov/everett-somerville-mystic-river-bicycle-pedestrian-bridge https://hwy.MassDOT.state.ma.us/ProjectInfo/Main.asp?ACTION=ViewProject&PROJECT_NO=612004 | https://public.govdelivery.com/accounts/MADOT/subscriber/new?topic_id=MADOT_258 | ||||
45 | Fenway Path | Phase III | Pre-25% design | Full construction | 2017 | July 30th, 2025 | Unannounced | Unannounced | Fenway-Kenmore | MBTA, "Boston, City of" | HDR, Inc. | MBTA | Patricia A. Leavenworth | https://Boston.gov/Fenway-Path | Rani Schloss | |||
46 | Fitchburg Line Rail Trail Danehy Park to Porter Square | Proposed | Full construction | November 2021 | July 2025 | 2026 | Unannounced | Cambridge | "Cambridge, City of", MBTA | Unannounced | Unannounced | Charlie Creagh <ccreagh@cambridgema.gov> (617-349-9167); Bill Deignan <wdeignan@cambridgema.gov> (617-349-4632) | https://www.cambridgema.gov/Departments/communitydevelopment/fitchburgcommuterraillinecrossingstudy https://www.cambridgema.gov/Departments/communitydevelopment/danehyparkconnector | https://lp.constantcontactpages.com/su/bjJ0vwC | Dikshant Pradhan | |||
47 | Franklin Park: Circuit Drive Traffic Calming And Drainage | ? | Partial construction | February 2025 | ? | Spring 2026 | Unannounced | Roxbury | "Boston, City of" | Nitsch Engineering; Reed Hilderbrand | Unannounced | Amy Linné <Amy.Linne@Boston.gov> | https://Boston.gov/Circuit-Drive | Trevyn Langsford | ||||
48 | Grand Junction Connector | Announced | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | "Cambridge, City of", MassDOT, MBTA | Unannounced | Unannounced | Cortney Kirk <CKirk@CambridgeMA.gov; Charlie Creagh <CCreagh@CambridgeMA.gov> | https://camb.ma/grandjunctionconnector | https://lp.constantcontactpages.com/sl/Zp8gTYR | ||||
49 | Grand Junction Multi-use Path | Pre-25% design | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | "Cambridge, City of", MBTA | ? | ? | Community Development Department <cddat344@CambridgeMA.gov>; Melissa Peters (617-349-4600) | https://CambridgeMA.gov/GrandJunction | |||||
50 | Grove Street Redesign Project | 75% design | Partial construction | ? | ? | ? | ? | Belmont | "Belmont, Town of" | Vanasse Hangen Brustlin, Inc. | ? | ? | https://www.belmont-ma.gov/1632/Grove-Street-Redesign-Project | |||||
51 | Harrison Avenue Reconstruction (Ink Block) | Under construction | ? | ? | 2025 | 2026 | South End | "Boston, City of" | ? | ? | <Harrison-Ave-Recon@Boston.gov> | https://Boston.gov/Harrison-Ink-Block | ||||||
52 | Harvard Street | 100% design | Partial construction | ? | April 29th, 2026 | ? | ? | Brookline | "Brookline, Town of" | Apex | ? | |||||||
53 | Harvard Square Pedestrianization | Proposed | ? | ? | ? | ? | Cambridge | "Cambridge, City of" | Unannounced | Unannounced | ||||||||
54 | Harvard Square Kiosk and Plaza | Under construction | Full construction | 2013 | ? | ? | Summer 2026 | Cambridge | "Cambridge, City of" | ? | ? | https://www.cambridgema.gov/Departments/publicworks/cityprojects/2021/harvardsquarekioskandplaza | ||||||
55 | Highland Avenue Redesign Project | Announced | Full construction | Summer 2021 | ? | July 2026 | ? | Somerville | "Somerville, City of" | Unannounced | Unannounced | Justin Schreiber <JSchreiber@SomervilleMA.gov>; Kate White <KWhite@SomervilleMA.gov>; Viola Augustin <VAugustin@SomervilleMA.gov> | https://SomervilleMA.gov/HighlandAve | Dikshant Pradhan | ||||
56 | Huntington Ave / South Huntington Ave E-Branch Accessibility Project | Announced | Full construction | Spring 2024 | August 8th, 2025 | Unannounced | Unannounced | Mission Hill | "Boston, City of", MBTA | Unannounced | Unannounced | Matthew Petersen, BTD; Matt Conover, MBTA; Ben Weinstein, MBTA | https://Boston.gov/Huntington-EBranch | Join via form on project website | Rani Schloss | |||
57 | Hyde Park Avenue Multimodal Corridor | Pre-25% design | Unannounced | 2019 | October 24th, 2025 | Unannounced | Unannounced | Hyde Park, Jamaica Plain | "Boston, City of" | HDR, Inc. | Unannounced | Tyler Lew <Tyler.Lew@Boston.gov> | https://www.boston.gov/departments/transportation/hyde-park-avenue-multimodal-corridor | Rani Schloss | ||||
58 | Inner Belt-Brickbottom Crossing | Pre-25% design | Full construction | 2025-11-17 | 2026-05-07 | Unannounced | Unannounced | Somerville | MBTA, "Somerville, City of" | Unannounced | Unannounced | Rebecca Wright <RWright@SomervilleMA.gov; Magdalena Gomez <MGomez@SomervilleMA.gov; Nick Alakel <NAlakel@SomervilleMA.gov> | https://SomervilleMA.gov/InnerBeltBrickbottom | |||||
59 | Intersection Improvements - Washington St. at Merriam St. | 100% design | Partial construction | ? | ? | March 2026 | Winter 2025-2026 | Somerville | "Somerville, City of" | Tetra Tech | ? | ? | https://SomervilleMA.gov/IntersectionImprovements#washington-merriam | https://www.somervillema.gov/construction#newsletter | Dikshant Pradhan | |||
60 | Jamaica Plain Centre/South Transportation Action Plan | Pre-25% design | Unannounced | Fall 2024 | February 2nd, 2026 | Unannounced | 2027 | Jamaica Plain | "Boston, City of" | Kittelson & Associates | Unannounced | <JPCentreSouth@Boston.gov> Mike Tormey <michael.tormey2@boston.gov> | https://www.boston.gov/departments/transportation/project/jamaica-plain-centresouth-transportation-action-plan | https://forms.gle/wr6xaFsPbGwZaExQ8 | Rani Schloss | |||
61 | Linear Park Reconstruction Project | Under construction | Full construction | 2022 | June 22nd, 2026 | October 27th, 2025 | October 2026 | Cambridge | "Cambridge, City of", MBTA | Halvorson; HDR, Inc. | Kristen Kelleher <KKelleher@CambridgeMA.gov> (617-349-4825); Kevin Beuttell <KBeuttell@CambridgeMA.gov> (617-349-4830); Charlie Creagh <CCreagh@CambridgeMA.gov>; Bill Deignan <WDeignan@CambridgeMA.gov> | https://camb.ma/linearpark https://www.cambridgema.gov/departments/publicworks/cityprojects/2025/linearparkreconstructionproject https://www.cambridgema.gov/departments/communitydevelopment/linearparkredesign | ||||||
62 | Lost Village Transportation Safety Improvements | Under construction | Full construction | ? | April 6th, 2026 | April 6th, 2026 | 2026 | Charlestown | "Boston, City of" | ? | ? | Streets Cabinet <pwdengineering@boston.gov> (617-635-4680) | https://www.boston.gov/departments/streets-cabinet/project/lost-village-transportation-safety-improvements | |||||
63 | Lower Broadway-Alford Street Transit Priority Corridor | Pre-25% design | Full construction | ? | March 19th, 2026 | 2027 | 2029 | Charlestown, Everett | "Everett, City of", "Boston, City of", MassDOT, MBTA | Unannounced | Unannounced | <BetterBusProject@MBTA.com> | https://www.mbta.com/projects/lower-broadway-alford-street-transit-priority-corridor | |||||
64 | Lower Roxbury Slow Streets | Under construction | Full construction | August 2019 | June 17, 2026 | Summer 2026 | Fall 2026 | Roxbury | "Boston, City of" | BTD | D'Allesandro Corporation | <slowstreets@boston.gov> | https://www.boston.gov/departments/transportation/project/lower-roxbury-slow-streets | |||||
65 | Maffa Way/Mystic Avenue Bridge Superstructure Replacements | Under construction | Full construction | ? | ? | Spring 2024 | Winter 2025-2026 | Charlestown, Somerville | MassDOT | ? | ? | <MassDOTMaffaMystic@dot.state.ma.us> (781-999-0261) | https://Mass.gov/MaffaMystic | |||||
66 | Main Street Safety Improvement Project | Under construction | Quick-build | ? | ? | 2025 | May 2026 | Cambridge | "Cambridge, City of" | Kittelson & Associates | ? | Jackie McLaughlin <JMcLaughlin@CambridgeMA.gov> (617-349-4689) | https://CambridgeMA.gov/MainStSafety | |||||
67 | 2026 Main Street Safety Improvement Project | Announced | Partial construction | November 24th, 2025 | June 9th, 2025 | Fall 2026 | Fall 2026 | Cambridge | "Cambridge, City of" | Unannounced | Unannounced | Jackie McLaughlin <JMcLaughlin@CambridgeMA.gov> (617-349-4689) | https://www.cambridgema.gov/streetsandtransportation/projectsandprograms/2026mainstreetsip | |||||
68 | Mass Ave Improvements - Central Square | Pre-25% design | Partial construction | Spring 2026 | May 20th, 2026 | Fall 2026 | Unannounced | Cambridge | "Cambridge, City of" | Unannounced | Unannounced | Unannounced | Unannounced | |||||
69 | Mass Ave Improvements - Harvard Square | Pre-25% design | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | "Cambridge, City of" | ? | Unannounced | <MassAve4@CambridgeMA.gov> | https://CambridgeMA.gov/MassAve4B | |||||
70 | Mass Ave Partial Construction | Under construction | Partial construction | ? | April 29th, 2026 | Spring 2025 | 2030 | Cambridge | "Cambridge, City of" | ? | Newport Construction | <MassAve4@CambridgeMA.gov> | https://CambridgeMA.gov/MassAvePartialConstruction | |||||
71 | Maverick Square Transportation Action Plan | Announced | Unannounced | Unannounced | Unannounced | Unannounced | 2026 | East Boston | "Boston, City of" | Openbox | Unannounced | <MaverickTAP@boston.gov> | https://www.boston.gov/departments/transportation/project/maverick-square-transportation-action-plan | https://forms.gle/PvVzvRnXTbGMEE2H7 | ||||
72 | McBride Street | 100% design | Full construction | September 6th, 2022 | May 2025 | Unannounced | Unannounced | Jamaica Plain | "Boston, City of" | Unannounced | Unannounced | Unannounced | https://Boston.gov/McBride-Street https://www.boston.gov/departments/transportation/project/mcbride-street | Trevyn Langsford | ||||
73 | McGrath Boulevard Project | 25% design | Full construction | ? | ? | 2028 | Unannounced | Somerville | MassDOT | ? | ? | <MassDOTMcGrathBlvd@dot.state.ma.us> | https://Mass.gov/McGrath-Boulevard-Project | |||||
74 | Medford Street & School Street Protected Bike Lanes | 75% design | Quick-build | ? | ? | October 2025 | Unannounced | Somerville | "Somerville, City of" | Unannounced | Unannounced | Viola Augustin <VAugustin@SomervilleMA.gov>; Kate White <KWhite@SomervilleMA.gov> | https://SomervilleMA.gov/MedfordSTBikes | |||||
75 | Memorial Drive Greenway Improvements | Phase III | Under construction | Full construction | ? | ? | September 2025 | Unannounced | Cambridge | DCR | ? | McCourt Construction | Dan Driscoll <Dan.Driscoll@Mass.gov> (617-447-3834) | https://www.mass.gov/info-details/memorial-drive-greenway-improvements-phase-iii | ||||
76 | Memorial Drive Greenway Improvements | Phase IV | Announced | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | DCR | Stantec Consulting | Unannounced | ? | |||||
77 | Mission Hill Transportation Planning: Terrace and Parker Street | Announced | Unannounced | 2023 | June 2023 | Unannounced | Unannounced | Mission Hill | "Boston, City of" | Unannounced | Unannounced | William Moose <William.Moose@Boston.gov> | https://www.boston.gov/departments/transportation/mission-hill | https://docs.google.com/forms/d/e/1FAIpQLSemJ0e3rCzE2fhzmlMS2yvMdpVCbGXpBoSTGblXzfIfp6JSBg/viewform | ||||
78 | Needham-Newton corridor project | Complete | Full construction | Summer 2020 | ? | Fall 2020 | 2026 | Needham, Newton | MassDOT | ? | ? | https://www.mass.gov/needham-newton-corridor-project | https://public.govdelivery.com/accounts/MADOT/subscriber/new?topic_id=MADOT_256 | |||||
79 | Newton Corner improvements project | Pre-25% design | Full construction | September 28, 2022 | December 2024 | Unannounced | Unannounced | Newton | MassDOT | VHB | ? | <NewtonCornerImprovements@dot.state.ma.us> | https://www.mass.gov/newton-corner-improvements-project | https://public.govdelivery.com/accounts/MADOT/subscriber/new?topic_id=MADOT_211 | ||||
80 | Newton Highlands Village Enhancement Project | 25% design | Full construction | June 7, 2022 | October 25, 2025 | Unannounced | Unannounced | Newton | "Newton, City of" | ? | ? | <highlands@newtonma.gov> (617-796-1006) | https://www.newtonma.gov/government/public-works/public-works-project-and-construction-information/newton-highlands-village-enhancement-project | https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.surveymonkey.com%2Fr%2FHDVSYGK&data=05%7C01%7Cssullivan%40newtonma.gov%7C1639176f9798418fdeaa08da43392a81%7C2a3929e0ccb54fb381402e2562c90e96%7C0%7C0%7C637896210051324505%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=DzQrc10Rgi8bh8wEc%2B73403SGVUgS%2FnQEXKL1sye6vg%3D&reserved=0 | ||||
81 | North Station Draw One Bridge Replacement | 75% design | Full construction | ? | ? | Unannounced | Unannounced | West End, Cambridge | MBTA | ? | ? | <DrawOne@MBTA.com> | https://MBTA.com/DrawOne | |||||
82 | North Washington Street Bridge Replacement | Under construction | Full construction | ? | ? | 2018 | 2024 | Charlestown, North End, West End | MassDOT | ? | ? | Dan Fielding (857-368-8959); <NorthWashingtonStreet@dot.state.ma.us> | https://Mass.gov/North-Washington-Street-Bridge-Replacement | |||||
83 | Outer Huron Safety Improvement Project | 25% design | Quick-build | ? | ? | Summer 2026 | Fall 2026 | Cambridge | "Cambridge, City of" | Kittelson & Associates | Unannounced | Leah Grodstein <LGrodstein@CambridgeMA.gov> (617-349-4609) | https://bit.ly/OuterHuronSafety https://www.cambridgema.gov/streetsandtransportation/projectsandprograms/huronavesafetyimprovementproject | |||||
84 | Pedestrian & Bicycle Crossing of the Fitchburg MBTA Commuter Rail Line in North Cambridge | Announced | Full construction | ? | ? | Unannounced | Unannounced | Cambridge | MBTA, "Cambridge, City of" | ? | ? | Charlie Creagh <CCreagh@CambridgeMA.gov> (617-349-9167); Bill Deignan <WDeignan@CambridgeMA.gov> (617-349-4632) | https://CambridgeMA.gov/FitchburgCrossing | |||||
85 | Poplar Street (Roslindale) | ? | Quick-build | September 6th, 2022 | January 2025 | ? | 2026 | Roslindale | "Boston, City of" | ? | ? | https://Boston.gov/Poplar-Street https://www.boston.gov/departments/transportation/project/poplar-street-roslindale | ||||||
86 | Quincy-Western Kirkland Safety Improvement Project | 100% design | Quick-build | November 2025 | March 6th, 2026 | Spring 2026 | Spring 2026 | Cambridge | "Cambridge, City of" | Kittelson & Associates | ? | Andreas Wolfe <AWolfe@CambridgeMA.gov> (617-349-9162) | https://camb.ma/quincykirkland | |||||
87 | Rindge Avenue Community Connectivity | Phase I | Announced | Full construction | 2022 | June 30th, 2026 | Summer-Fall 2027 | Unannounced | Cambridge | "Cambridge, City of" | ? | Unannounced | Joel Smith <JSmith@CambridgeRedevelopment.org> (617-492-6800, ext 14) | https://bit.ly/rindgewalkingpath https://CambridgeRedevelopment.org/rindgeconnectivity https://www.cambridgeredevelopment.org/projects/rindge-avenue-community-connectivity | ||||
88 | River Street Reconstruction Project | Under construction | Full construction | ? | April 10th, 2026 | November 2022 | Winter 2026 | Cambridge | "Cambridge, City of" | HDR, Inc.; McMahon (Bowman); Halvorson; GEI Consultants; BSI Engineering; Feldman Geospatial | P. Gioioso & Sons | Kristen Kelleher <KKelleher@CambridgeMA.gov> (617-349-4825) | https://CambridgeMA.gov/RiverStreet | |||||
89 | Roslindale Square Transportation Action Plan | Announced | Unannounced | ? | ? | ? | 2026 | Roslindale | "Boston, City of" | Bowman Consulting Group Ltd.; Openbox | Unannounced | Mike Tormey <michael.tormey2@boston.gov> | https://www.boston.gov/departments/transportation/project/roslindale-square-transportation-action-plan | https://docs.google.com/forms/d/e/1FAIpQLSd0uAdxYQGo7Qlxz5aBQIJzKTk4QPoLu7qpB9R9MRJ0fBvz0A/viewform | ||||
90 | Route 57 Transit Priority Corridor Project | Pre-25% design | ? | ? | ? | Unannounced | Unannounced | Allston, Brighton | "Boston, City of" | Unannounced | Unannounced | Matthew Petersen <Matthew.Petersen@Boston.gov> (617-635-1453) | https://www.boston.gov/departments/transportation/project/route-57-transit-priority-corridor | |||||
91 | Roxbury-Fenway Connector | Announced | Full construction | ? | ? | Unannounced | Unannounced | Roxbury | "Boston, City of" | Unannounced | Unannounced | Charlotte Fleetwood | https://www.boston.gov/sites/default/files/file/2023/04/171206_Rox-Fen%20Poster_web%20%283%29.pdf | Anne Griepenburg | ||||
92 | Roxbury Resilient Corridors | Malcolm X Boulevard | Announced | ? | ? | ? | Unannounced | Unannounced | Roxbury | "Boston, City of" | Unannounced | Unannounced | <RoxburyCorridors@Boston.gov> (617-635-4680) | https://www.boston.gov/departments/transportation/project/roxbury-resilient-corridors | See "Stay Connected" section on project page or email roxburycorridors@boston.gov | Anne Griepenburg | ||
93 | Melnea Cass Boulevard | Announced | ? | ? | ? | Unannounced | Unannounced | Roxbury | "Boston, City of" | Unannounced | Unannounced | Anne Griepenburg | ||||||
94 | Warren Street | Announced | ? | ? | ? | Unannounced | Unannounced | Roxbury | "Boston, City of" | Unannounced | Unannounced | Anne Griepenburg | ||||||
95 | Rutherford Avenue/Sullivan Square Design Project | Pre-25% design | Full construction | 2008 | April 6th, 2026 | 2031 | 2035 | Charlestown | "Boston, City of" | Tetra Tech | Unannounced | <Rutherford.Ave@Boston.gov> (617-635-0058) | https://Boston.gov/Rutherford | Join via form on project website | Rani Schloss | |||
96 | Safety Improvements for the BU Bridge Corridor of Memorial Drive | Under construction | Full construction | ? | ? | November 2024 | ? | Cambridge | DCR | MDP | ? | Unannounced | https://www.mass.gov/info-details/safety-improvements-for-the-bu-bridge-corridor-of-memorial-drive | |||||
97 | Shore Drive Greenway | 100% design | Full construction | 2024 | 2026-05-07 | June 2026 | Summer 2027 | Somerville | "Somerville, City of" | ? | ? | Meg Koglin <MKoglin@SomervilleMA.gov> | https://voice.somervillema.gov/shore-drive-greenway | |||||
98 | Signal and Intersection Improvements at McGrath Highway (Route 28) / Mystic Avenue (Route 38) | Under construction | Full construction | 2016 | ? | Spring 2025 | Spring 2027 | Somerville | MassDOT | ? | ? | <SomervilleMysticMcGrathIntersections@dot.state.ma.us>; David Shedd; Eric Richard; Carrie E. Lavallee <MassDOTProjectManagement@dot.state.ma.us> | https://hwy.massdot.state.ma.us/projectinfo/projectinfo.asp?num=608562 https://www.mass.gov/event/somerville-signal-and-intersection-improvements-at-mcgrath-highway-route-28-mystic-avenue-route-38-2023-03-01t183000-0500-2023-03-01t193000-0500 https://bit.ly/2838Intersection (unofficial) | https://public.govdelivery.com/accounts/MADOT/subscriber/new?topic_id=MADOT_205 | ||||
99 | Slow, Safe Charles Street | Announced | Unannounced | ? | ? | Unannounced | Unannounced | Beacon Hill | "Boston, City of" | Unannounced | Unannounced | ? | https://Boston.gov/Charles-Street | |||||
100 | Somerville Avenue Quick-Build Safety Improvements | Announced | Quick-build | May 20th, 2025 | May 7th, 2026 | Spring 2027 | Summer 2027 | Somerville | "Somerville, City of" | Unannounced | Unannounced | Viola Augustin <VAugustin@SomervilleMA.gov>; Greg Hanafin <GHanafin@SomervilleMA.gov> Rishika Dhawan <RDhawan@SomervilleMA.gov> | https://SomervilleMA.gov/SomervilleAvenue | |||||