Table 1 Flexi-HOT Hourly Revenues and Costs for Moderate Congestion Scenario
2
8-lane Freeway6-lane Freeway4-lane Freeway
3
Base CaseFlexi-HOT AlternativeBase CaseFlexi-HOT AlternativeBase CaseFlexi-HOT Alternative
4
Perfromance and Financial MeasuresFlexi-HOT laneFree lanesFlexi-HOT laneFree lanesFlexi-HOT laneFree lanes
5
HOURLY TRAVEL DEMAND
6
Traffic demand (vehicles/lane)2,0001,5002,0001,5002,0001,500
7
Number of lanes per direction414313212
8
Directional traffic demand (vehicles/hour)8,0001,5006,6086,0001,5004,6944,0001,5002,779
9
Induced demand (vehicles/hour) 108194279
10
Work commute traffic (% of vehicles)60.00%60.00%60.00%
11
Work vehicle trips per hour4,8003,6002,400
12
% work vehicle trips that are SOVs0.950.950.95
13
Work SOV person trips4,5603,4202,280
14
New transit person trips (%)15.00%15.00%15.00%
15
New transit person trips (number)684513342
16
Newtransit avg. vehicle occupancy (riders/vehicle)
30.0030.0030.00
17
New transit vehicle trips231711
18
Carpool vehicle trips480360240
19
Total carpool + transit vehicle trips526394263
20
Toll-paying vehicle trips97411061237
21
Toll-payers as a % of total vehicles12%18%29%
22
Total vehicle trips1,5001,5001,500
23
SPEED CALCULATIONS
24
Practical capacity (vph)7,2001,8006,3005,4001,8004,5003,6001,8002,700Capacity at level of service D
25
Traffic volume (vph)8,0001,5006,6086,0001,5004,6944,0001,5002,779Traffic volume in GP or priced lane
26
Free-flow speed (mph)656060656060656060Speed at level of service A
27
Alpha parameter in BPR formula0.250.250.250.250.250.250.250.250.25Alpha parameter in BPR formula
28
Beta parameter in BPR formula999999999Beta parameter in BPR formula
29
Calculated speed using BPR formula (mph)39.557.243.339.557.244.039.557.245.3
Using BPR formula with above inputs
30
Trip length on freeway (miles)101010101010101010
Assumed length of upstream congestion
31
Travel time per trip (minutes)15.210.513.815.210.513.715.210.513.2Calculated as miles/speed
32
Travel time saved compared to free lanes (min.)
3.43.22.8Time saving compared to GP lane
33
Average toll per trip ($)$6.00$3.00$1.50Average toll rate assumed
34
Value of time ($ per hour)$107.24$56.83$32.65Calculated as time saved/toll
35
HOURLY REVENUE CALCULATIONS
36
Total number of toll-payers per hour9741,1061,237
37
Average toll per trip ($)$6.00$3.00$1.50
38
Toll revenue per hour ($)$5,846$3,317$1,8567.5
39
HOURLY REWARD COST CALCULATIONS
40
Total number of transit riders per hour 684513342
41
Reward per transit passenger trip ($)$1.00$1.00$1.00
42
Total cost of rewards per hour ($)$684$513$342
43
% of revenues used for cash rewards12%15%18%
44
Net revenue after reward costs ($)$5,162$2,804$1,514
45
HOURLY TOLLING OPERATION COST
46
Number of tolled vehicles (vph)97411061237
47
Operation cost per tolled vehicle ($)$0.20$0.20$0.20
48
Total tolling operation cost per hour ($)$195$221$247
49
Net revenue after tolling and reward cost ($)
$4,968$2,583$1,266$2,939.04
50
HOURLY TRANSIT SERVICE COST
51
Number of transit vehicles (vph)231711
52
Operation cost per transit vehicle ($)$140.00$140.00$140.00
53
Total transit operation cost per hour ($)$3,192$2,394$1,596
54
Net revenue ($)$1,776$189-$330$545.04
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100