1 | Diego Rivera Theater FEE PROPOSAL WORKSHEET SPECIAL INSPECTIONS AND MATERIALS TESTING SERVICES | |||||||||||||||||||||||||
2 | In addition to this worksheet, Proposers are to include the firm’s detailed unit rate sheet with 2025, 2026, and 2027 hourly billing rates and cost of all tests provided by the firm. Based on the construction documents and DSA 103 forms provided, the proposer is to determine which positions and tests are required, to estimate quantities and to note rates for these on this form. On this form, Proposers are to note its proposed pricing and estimated quantities of the services. The prices listed in Sections I, II, III and IV must be coordinated with the Proposer’s Section V BUDGET. | |||||||||||||||||||||||||
3 | I. Hourly Rates | |||||||||||||||||||||||||
4 | Category | Position Title/Description | Units | Estimated Quantity | Unit Rate | Estimated Budget | ||||||||||||||||||||
5 | Professional and Management | Registered Geotechnical Engineer | Hour | $ - | ||||||||||||||||||||||
6 | Registered Civil Engineer (Forms) | Each | $ - | |||||||||||||||||||||||
7 | Project Engineer | Hour | $ - | |||||||||||||||||||||||
8 | Staff Engineer | Hour | $ - | |||||||||||||||||||||||
9 | Project Manager | % | ||||||||||||||||||||||||
10 | Special Inspection, Testing, and Sampling | Lead Special Inspector | Hour | $ - | ||||||||||||||||||||||
11 | Earthwork/Asphalt Concrete Inspector and Materials Tester | Hour | $ - | |||||||||||||||||||||||
12 | DSA Shotcrete Inspector | Hour | $ - | |||||||||||||||||||||||
13 | DSA Masonry Inspector | Hour | $ - | |||||||||||||||||||||||
14 | CWI Welding Inspector | Hour | $ - | |||||||||||||||||||||||
15 | Nondestructive Testing (NDT) Inspector | Hour | $ - | |||||||||||||||||||||||
16 | ICC Inspector | Hour | $ - | |||||||||||||||||||||||
17 | Firestop Inspector | Hour | $ - | |||||||||||||||||||||||
18 | Inspector/Technician | Hour | $ - | |||||||||||||||||||||||
19 | Offsite Fabrication | Precast Concrete Inspection | Hour | $ - | ||||||||||||||||||||||
20 | CWI Welding Inspection | Hour | $ - | |||||||||||||||||||||||
21 | Non-Destructive Testing | Hour | $ - | |||||||||||||||||||||||
22 | Shift differential for prevailing wage positions only | Hourly Rate +: | ||||||||||||||||||||||||
23 | Overtime factor for prevailing wage positions only | Hourly Rate x: | ||||||||||||||||||||||||
24 | Doubletime factor for prevailing wage positions only | Hourly Rate x: | ||||||||||||||||||||||||
25 | ||||||||||||||||||||||||||
26 | II. Fixed-Price Rates | |||||||||||||||||||||||||
27 | Category | Position Title/Description | Units | Estimated Quantity | Unit Rate | Estimated Budget | ||||||||||||||||||||
28 | Laboratory Testing | Lab Maximum Density 4-inch mold | Test | $ - | ||||||||||||||||||||||
29 | Lab Maximum Density 6-inch mold | Test | $ - | |||||||||||||||||||||||
30 | Plasticity Index | Test | $ - | |||||||||||||||||||||||
31 | Sand Equivalent | Test | $ - | |||||||||||||||||||||||
32 | Theoretical Maximum Density | Test | $ - | |||||||||||||||||||||||
33 | Asphalt Core Density | Test | $ - | |||||||||||||||||||||||
34 | Page 1 of 2 | |||||||||||||||||||||||||
35 | II. Fixed-Price Rates (continued) | |||||||||||||||||||||||||
36 | Category | Position Title/Description | Units | Estimated Quantity | Unit Rate | Estimated Budget | ||||||||||||||||||||
37 | Laboratory Testing (continued) | Mix Design Review | Each | $ - | ||||||||||||||||||||||
38 | Rebar Tensile/Bend | Set | $ - | |||||||||||||||||||||||
39 | Concrete Compressive Strength | Test | $ - | |||||||||||||||||||||||
40 | Mortar Cylinder Compressive Strength | Test | $ - | |||||||||||||||||||||||
41 | Grout Compressive Strength | Test | $ - | |||||||||||||||||||||||
42 | CMU Compressive Strength | Test | $ - | |||||||||||||||||||||||
43 | Composite Masonry Prisms Tests | Test | $ - | |||||||||||||||||||||||
44 | Absorption/Moisture Content/Oven Dry Density | Test | $ - | |||||||||||||||||||||||
45 | Linear Shrinkage | Test | $ - | |||||||||||||||||||||||
46 | Masonry Core Compressive Strength | Test | $ - | |||||||||||||||||||||||
47 | Masonry Core Shear Test | Test | $ - | |||||||||||||||||||||||
48 | High Strength Grout Cube Compressive Strength | Test | $ - | |||||||||||||||||||||||
49 | Fireproofing Dry Density | Test | $ - | |||||||||||||||||||||||
50 | High Strength Bolt Hardness, Wedge, Tensile Strength | Set | $ - | |||||||||||||||||||||||
51 | Sample Pickup | Trip | $ - | |||||||||||||||||||||||
52 | Equipment | Nuclear Gauge | Day | $ - | ||||||||||||||||||||||
53 | Pull /Torque Test Equipment | Day | $ - | |||||||||||||||||||||||
54 | Fireproofing Adhesion/Cohesion Test | Day | $ - | |||||||||||||||||||||||
55 | UT/NDT Testing Equipment | Day | $ - | |||||||||||||||||||||||
56 | Skidmore Equipment | Day | $ - | |||||||||||||||||||||||
57 | Complete the following section with any additional hourly positions or fixed-price items not included in the above Sections I and II. Additionally, for hourly positions indicate if those positions are subject to and governed by the Prevailing Wage Laws (“PW”) by specifying Yes (“Y”) or No (“N”). Insert additional pages if necessary. | |||||||||||||||||||||||||
58 | III. Other | |||||||||||||||||||||||||
59 | Category | Position Title/Description | PW? | Units | Estimated Quantity | Unit Rate | Estimated Budget | |||||||||||||||||||
60 | Y/N | |||||||||||||||||||||||||
61 | Special Inspections | Sampling & Tagging Reinforcing Steel | Y | Hours | $ - | |||||||||||||||||||||
62 | Coring Machine Operator | Y | Hours | $ - | ||||||||||||||||||||||
63 | Coring Machine Operator Helper, if needed | Y | Hours | $ - | ||||||||||||||||||||||
64 | Laboratory Testing | Weld Procedure Specification Review | N | Each | $ - | |||||||||||||||||||||
65 | Anchor Bolts & Rods Not Readily Identifiable | N | Each | $ - | ||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | IV. Reimbursable Expenses - LUMP SUM | |||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | Enter the Proposer’s Special Inspection and Materials Testing ESTIMATED BUDGET TOTAL. This is to be coordinated with the estimates given in sections above. | |||||||||||||||||||||||||
70 | V. ESTIMATED BUDGET TOTAL | |||||||||||||||||||||||||
71 | $ - | |||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | Page 2 of 2 | |||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||