Diego Rivera Theater
FEE PROPOSAL WORKSHEET
SPECIAL INSPECTIONS AND MATERIALS TESTING SERVICES
2
In addition to this worksheet, Proposers are to include the firm’s detailed unit rate sheet with 2025, 2026, and 2027 hourly billing rates and cost of all tests provided by the firm.

Based on the construction documents and DSA 103 forms provided, the proposer is to determine which positions and tests are required, to estimate quantities and to note rates for these on this form. On this form, Proposers are to note its proposed pricing and estimated quantities of the services.

The prices listed in Sections I, II, III and IV must be coordinated with the Proposer’s Section V BUDGET.
3
I.         Hourly Rates
4
CategoryPosition Title/DescriptionUnitsEstimated QuantityUnit RateEstimated Budget
5
Professional and ManagementRegistered Geotechnical EngineerHour $ -
6
Registered Civil Engineer (Forms)Each $ -
7
Project EngineerHour $ -
8
Staff Engineer Hour $ -
9
Project Manager%
10
Special Inspection, Testing, and SamplingLead Special InspectorHour $ -
11
Earthwork/Asphalt Concrete Inspector and Materials TesterHour $ -
12
DSA Shotcrete InspectorHour $ -
13
DSA Masonry Inspector Hour $ -
14
CWI Welding InspectorHour $ -
15
Nondestructive Testing (NDT) InspectorHour $ -
16
ICC InspectorHour $ -
17
Firestop InspectorHour $ -
18
Inspector/TechnicianHour $ -
19
Offsite FabricationPrecast Concrete Inspection Hour $ -
20
CWI Welding InspectionHour $ -
21
Non-Destructive TestingHour $ -
22
Shift differential for prevailing wage positions onlyHourly Rate +:
23
Overtime factor for prevailing wage positions onlyHourly Rate x:
24
Doubletime factor for prevailing wage positions onlyHourly Rate x:
25
26
II.       Fixed-Price Rates
27
CategoryPosition Title/DescriptionUnitsEstimated QuantityUnit RateEstimated Budget
28
Laboratory
Testing
Lab Maximum Density 4-inch moldTest $ -
29
Lab Maximum Density 6-inch moldTest $ -
30
Plasticity IndexTest $ -
31
Sand EquivalentTest $ -
32
Theoretical Maximum DensityTest $ -
33
Asphalt Core DensityTest $ -
34
Page 1 of 2
35
II.       Fixed-Price Rates (continued)
36
CategoryPosition Title/DescriptionUnitsEstimated QuantityUnit RateEstimated Budget
37
Laboratory
Testing

(continued)
Mix Design ReviewEach $ -
38
Rebar Tensile/Bend Set $ -
39
Concrete Compressive Strength Test $ -
40
Mortar Cylinder Compressive Strength Test $ -
41
Grout Compressive StrengthTest $ -
42
CMU Compressive StrengthTest $ -
43
Composite Masonry Prisms TestsTest $ -
44
Absorption/Moisture Content/Oven Dry DensityTest $ -
45
Linear ShrinkageTest $ -
46
Masonry Core Compressive StrengthTest $ -
47
Masonry Core Shear TestTest $ -
48
High Strength Grout Cube Compressive StrengthTest $ -
49
Fireproofing Dry DensityTest $ -
50
High Strength Bolt Hardness, Wedge, Tensile StrengthSet $ -
51
Sample PickupTrip $ -
52
EquipmentNuclear GaugeDay $ -
53
Pull /Torque Test EquipmentDay $ -
54
Fireproofing Adhesion/Cohesion Test Day $ -
55
UT/NDT Testing Equipment Day $ -
56
Skidmore EquipmentDay $ -
57
Complete the following section with any additional hourly positions or fixed-price items not included in the above Sections I and II. Additionally, for hourly positions indicate if those positions are subject to and governed by the Prevailing Wage Laws (“PW”) by specifying Yes (“Y”) or No (“N”). Insert additional pages if necessary.
58
III.     Other
59
CategoryPosition Title/DescriptionPW?UnitsEstimated QuantityUnit RateEstimated Budget
60
Y/N
61
Special InspectionsSampling & Tagging Reinforcing SteelYHours $ -
62
Coring Machine OperatorYHours $ -
63
Coring Machine Operator Helper, if neededYHours $ -
64
Laboratory TestingWeld Procedure Specification ReviewNEach $ -
65
Anchor Bolts & Rods Not Readily IdentifiableNEach $ -
66
67
IV.         Reimbursable Expenses - LUMP SUM
68
69
Enter the Proposer’s Special Inspection and Materials Testing ESTIMATED BUDGET TOTAL. This is to be coordinated with the estimates given in sections above.
70
V.         ESTIMATED BUDGET TOTAL
71
$ -
72
73
Page 2 of 2
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100