Secure entrances from lobbies + cageHIGH100%Locks etc
Back door is sticking. Building work for dirty metal shop cage. Cage needs doorbot / maglock
5
Install CCTV cameras and cable runsHIGH95%Tools, cameras, trunking, cableWould be nice to get one in biolab and covering car park
6
Build more current ACNodes,DoorbotsHIGH93%Tools, Parts
Doorbots installed and active on back door, front door, ground floor, 1st floor entrance, back cage cage, radio room, biolab, tooling cupboard
7
First aid kitsHIGHDone
8
Woodshop tool boardsHIGH
9
Fix lighting in cageHIGH100%There is only 50% lighting in the cage, other than from the Biolab or car park
10
Plan ventilation / air filtration for dusty wood shopMedAir handling unit due to be collected 21 November 2018
11
Woodshop flooring evaluation - Is laminate flooring sensible or slippy?HIGH
12
Reposition any emergency exit signageHIGH100%Ladder, Tools
Front door from workbench area is not an exit. Emergency exit sign removed. Emergency exit from 1st floor sign needs power
13
Ventilation / cooling for 1st floor comms roomMedportable air conditioner?
Previous tenants had a portable air conditioner venting via brown downpipe into kitchen. Can't install servers in room until sorted
14
Map cables going to server roomHighTesting kit, radios (AKA tone testers)There is a strong chance we have sockets from other floors in our cabinet
15
Punch down cables and label jacksHigh
patch panels, Punch Down tool, label maker
16
Map connection from server room to 3rd floor server roomHighTesting kit, radios
17
Map connection from server room to Ground floorHighTesting kit, radiosran two purple CAT6 to future ground-floor/woodworking-room
18
Install a small network cab in nursery & cable itHighTools, small cabinet
2xCAT6 cables run to a ceiling mounted wallport in CNC room needs small comms cabinet
19
Cable to the woodworking room comms cabinetHigh
2x CAT6 Cables ran from 1st floor Comms Room to existing comms cabinet on ground floor workshop. Needs patch panels to terminate. CNC room needs small comms cabinet
20
Map Wireless AP positions and determine cable runsHigh-
Rough AP Map made. 3 APs installed on first floor, gives coverage on ground floor
21
Map available wall sockets and determine usabilityMedTesting kit, radios
122 wallports on 1st floor patched, two have faulty cables. East side of ground floor tested
22
Install and configure switches and firewallHighPatch cables, switches, label gun
23
Move stuff from the CNC room to give electricians spaceHighgrunt
Electricians won't set a date until it's clear. Lasercutter can't move, stuff will need to be removed from pallets because pallets can't go through doorways. Workbenches will need partially dismantling to fit through doorways
24
Fix biolab heating leak / electrical tripHigh
plumbing tools, replacement socket box, dehumidifier
Leaky radiator isolated, bled, and disconnected. Affected socket box replaced. Mopped. Still damp in room, dehumidifier placed and turned on. Carpet ripped out and dumped
25
Membership Kiosk enclosure / installMed
Enclosure made, needs finishing and power run to near 1st floor entrance. Power currently via a 11m long extension cable.
26
Partly dismantle workbenches, move into correct roomMed
They won't fit through doorways with the vices intact. Woodworking-dedicated bench moved, but not reassembled
27
Build benches for prototyping areaMedBench stable. Power dado installed. One network point installed.
28
Build benches for 3d printing roomMedWalls are curved. Bench made and painted. needs screwing down.
29
Move valuable kit from the cage to allow builders to workHigh
Everything valuable has been moved from the cage, workbenches need dismantling to fit through doors
30
Update main website with new address and more infoMedStill pointing to 447 Hackney Road in parts
31
Repair back gateMed
32
Network ports for laser cutter/acnodeMedsave having silly long patch cables from the cabinet
33
Recommission laser cutterHighde-ionised water for the chiller
ventilation path via board in ajar window, lasercutter PC has gone through Windows Updates, soft-assembled.
34
Clear all areas for elecrical work (as per elec tab)HIGHCannot fix start date until this is done
35
Better power to the 1st floor comms roomHighElectrician2x C16 connectors wired and live with new PDUs
36
Plan ventilation route for laser cutterMed
37
Map CCTV locations and determine cable runsHIGH-
10 CCTV Cams Installed so far (17 Aug 2018) - CCTV map alongside equipment being brought in for maximum coverage
38
Configure Wireless APs with new keys, RADIUS login, etcMedLDAP & IPv6 ServicesAwaiting LDAP configuration and proper IPv6 services from ISP
39
Install Wireless APs and Update System SoftwareMedTools, APs, trunking, cable
APs are mounted, software updated except ceiling-mounted APs on 1st floor. ground floor has OK coverage from 1st floor APs actually
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...