ITEM #REF. SHEETDETAILCSI SECTSub ContractorDESCRIPTIONQTY.WASTAGEQTY WITH
WASTAGE
UNITUNIT LABOR HOURSTOTAL LABOR HOURSPER HOUR LABOR RATETOTAL LABOR COSTUNIT MATERIAL COSTTOTAL MATERIAL COSTITEM COSTTRADE COST
2
Estimate of Materials and Cost of Construction
3
CLICK HERE TO GO BACK TO COST SUMMARY
4
Sub-Total
$ - Date:2/5/2022
5
Material Tax9.5% $ - (Adjust the percentage for Material tax as required)Project:
Lake County Fire Station #71.
6
Overhead & Profit
25% $ - (Adjust the percentage for Overhead & Profit as required)
Project Location:
Lake County, Florida , Section 13, Township 19 South, Range 25 East.
7
Bond Fee1.5% $ - (Adjust the percentage for Bond Fee as required)
Project Type:
Private/ Public/ Prevailing wages Project ?
8
Total Bid
$ - Public
9
Gross Internal Area of Structure (SF)
131,681
10
Material Wastage 1
0%
( for Quantities in Each & LS)
Covered Area of Structure (SF)
-
11
Material Wastage 2
5%
( for Quantities in LF, SF, SY, CY, LBS, TONS)
No. of Units
-
12
(Changing the wastage percentage here will update the wastage for whole tab)
No. of Floors
-
13
Hardscaping Area (SF)
30,280
14
Note: To change hourly rates for any trade please go to "Hourly Rates" Tab
Soft scaping Area (SF)
-
15
16
ITEM #REF. SHEETDETAILCSI SECTSub ContractorDESCRIPTIONQTY.WASTAGEQTY WITH
WASTAGE
UNITUNIT LABOR HOURSTOTAL LABOR HOURSPER HOUR LABOR RATETOTAL LABOR COSTUNIT MATERIAL COSTTOTAL MATERIAL COSTITEM COSTTRADE COST
17
DIV-01General $ -
18
19
Plan Design and Permitting
20
1DIV-01General RequirementsArchitecture (Assumed By Owner) 1 1 LS - $ 10.0 $ - $ -
21
2DIV-01General RequirementsEngineering (Assumed By Owner) 1 1 LS - $ 10.0 $ - $ -
22
3DIV-01General RequirementsSurveying 30,280 5% 31,794 SF - $ 10.0 $ - $ -
23
4DIV-01General RequirementsSoils Report (Assumed By Owner) - - LS - $ 10.0 $ - $ -
24
5DIV-01General RequirementsGeological Report (Assumed By Owner) - - LS - $ 10.0 $ - $ -
25
6DIV-01General RequirementsConcrete Testing 1 1 LS - $ 10.0 $ - $ -
26
7DIV-01General RequirementsPermit Running (Assumed By Owner) 1 1 LS - $ 10.0 $ - $ -
27
8DIV-01General RequirementsPermits (Based on interior finish area) 131,681 5% 138,265 SF - $ 10.0 $ - $ -
28
9DIV-01General RequirementsPlan Coordination 1 1 LS - $ 10.0 $ - $ -
29
10DIV-01General RequirementsRoof Inspection - 5% - SF - $ 10.0 $ - $ -
30
11DIV-01General RequirementsBlueprints - 5% - SF - $ 10.0 $ - $ -
31
32
Utilities
33
12DIV-01General RequirementsUtilities during construction (Based on interior finish area) 131,681 5% 138,265 SF - $ 10.0 $ - $ -
34
13DIV-01General RequirementsPort-o-Potty (Based on interior finish area) 131,681 5% 138,265 SF - $ 10.0 $ - $ -
35
14DIV-01General RequirementsTemporary Power (Based on interior finish area) 131,681 5% 138,265 SF - $ 10.0 $ - $ -
36
37
Equipment and Tools
38
15DIV-01General RequirementsTool Rentals 1 1 LS - $ 10.0 $ - $ -
39
16DIV-01General RequirementsTool Shed 1 1 LS - $ 10.0 $ - $ -
40
17DIV-01General RequirementsDust Control 30,280 5% 31,794 SF - $ 10.0 $ - $ -
41
18DIV-01General RequirementsIce, Water, Beverages 1 1 LS - $ 10.0 $ - $ -
42
19DIV-01General RequirementsGarbage Dumpster / Trash Containers 1 1 LS - $ 10.0 $ - $ -
43
20DIV-01General RequirementsMobilization 131,681 5% 138,265 SF - $ 10.0 $ - $ -
44
45
Signage and Promotion
46
21DIV-01General RequirementsJob Signs 1 1 LS - $ 10.0 $ - $ -
47
22DIV-01General RequirementsJob Photos 1 1 LS - $ 10.0 $ - $ -
48
23DIV-01General RequirementsSignage 1 1 LS - $ 10.0 $ - $ -
49
24DIV-01General RequirementsPromotion/entertainment 1 1 LS - $ 10.0 $ - $ -
50
25DIV-01General RequirementsMisc. 1 1 LS - $ 10.0 $ - $ -
51
52
Cleaning and Final
53
26DIV-01General RequirementsTrash 131,681 5% 138,265 SF - $ 10.0 $ - $ -
54
27DIV-01General RequirementsFinal Cleaning 131,681 5% 138,265 SF - $ 10.0 $ - $ -
55
28DIV-01General RequirementsWindow washing (rough # of windows ) 1 1 LS - $ 10.0 $ - $ -
56
29DIV-01General RequirementsPunch List Items 1 1 LS - $ 10.0 $ - $ -
57
58
Bonds, Insurance, Legal
59
30DIV-01General RequirementsCasualty Insurance 1 1 LS - $ 10.0 $ - $ -
60
31DIV-01General RequirementsMedical Insurance 1 1 LS - $ 10.0 $ - $ -
61
32DIV-01General RequirementsGeneral Liability Insurance 1 1 LS - $ 10.0 $ - $ -
62
63
Supervision, Temporary Control & Facilities
64
33DIV-01General RequirementsProject Management 131,681 5% 138,265 SF - $ 10.0 $ - $ -
65
34DIV-01General RequirementsSupervision 131,681 5% 138,265 SF - $ 10.0 $ - $ -
66
35DIV-01General RequirementsHardscape Supervision 30,280 5% 31,794 SF - $ 10.0 $ - $ -
67
36DIV-01General RequirementsSoftscape Supervision - 5% - SF - $ 10.0 $ - $ -
68
37DIV-01General RequirementsTemporary Control & Facilities 131,681 5% 138,265 SF - $ 10.0 $ - $ -
69
70
DIV-02Selective Removals And Demolition $ -
71
72
Demolition
73
74
Site Demolition
75
38Sheet # 1.2Sheet # 1.2DIV-02Demo - SiteFence To Be Removed 688 5% 722 LF - $ 10.0 $ - $ - $ -
76
39Sheet # 1.2Sheet # 1.2DIV-02Demo - SiteRemove Existing Headwall 12 5% 13 LF - $ 10.0 $ - $ - $ -
77
40Sheet # 1.3Sheet # 1.3DIV-02Demo - SiteSaw Cut Existing Pavement For Smooth Connection 316 5% 332 LF - $ 10.0 $ - $ - $ -
78
79
41Sheet # 1.2Sheet # 1.2DIV-02Demo - SiteExisting Tree To Be Removed 303 303 EA - $ 10.0 $ - $ - $ -
80
42Sheet # 1.3Sheet # 1.3DIV-02Demo - SiteRelocated Mailbox 2 2 EA - $ 10.0 $ - $ - $ -
81
82
DIV-31Earthwork $ -
83
84
Excavation
85
43DIV-31Earth workerExcavation for utility pipes 227 5% 238 CY - $ 10.0 $ - $ - $ -
86
87
Backfill
88
44DIV-31Earth workerBackfill for utility pipes 160 5% 168 CY - $ 10.0 $ - $ - $ -
89
90
Grading
91
45Sheet # 1.5Sheet # 1.5DIV-31Earth workerCut 2,038 5% 2,140 CY - $ 10.0 $ - $ - $ -
92
46Sheet # 1.5Sheet # 1.5DIV-31Earth workerFill 5,647 5% 5,930 CY - $ 10.0 $ - $ - $ -
93
47Sheet # 1.5Sheet # 1.5DIV-31Earth workerSoil Import 3,542 5% 3,720 CY - $ 10.0 $ - $ - $ -
94
95
Misc.
96
48DIV-31DewateringDewatering (131681.41 SF) 1 1 LS - $ 10.0 $ - $ - $ -
97
49DIV-31Earth workerSoil Compaction 131,681 5% 138,265 SF - $ 10.0 $ - $ - $ -
98
50DIV-31Earth workerRemove (8" Thk) Vegetation top soil 131,681 5% 138,265 SF - $ 10.0 $ - $ - $ -
99
100
51DIV-31Earth workerLand Clearing and Grubbing 131,681 5% 138,265 SF - $ 10.0 $ - $ - $ -