Construction Statement Of Work4/9/2021
5
Color
WBS Number
Task name / Title
Assigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING7/10/20219/11/202103680000
7
1.1Land Use7/10/20219/10/2021036000OpenMedium00
8
1.2Easements, Set Backs7/13/20219/11/2021036000OpenMedium00
9
1.3
Access, Street Improvements
7/13/20219/11/2021036000OpenMedium00
10
1.4Utilities Available7/13/20219/11/2021036000OpenMedium00
11
2HOUSE PLANS9/14/202111/18/202103840000
12
2.1Purchase Standard Plans9/14/202111/13/2021036000OpenMedium00
13
2.2Architect Original Drawings9/15/202111/16/2021036000OpenMedium00
14
2.3Specifications9/16/202111/17/2021036000OpenMedium00
15
2.4Architect Manage Job9/17/202111/18/2021036000OpenMedium00
16
2.5Engineer-Loads & Spans9/17/202111/18/2021036000OpenMedium00
17
2.6Draftsman9/17/202111/18/2021036000OpenMedium00
18
3LOT SURVEY11/19/20211/25/202203840000
19
3.1House & Driveway11/19/20211/20/2022036000OpenMedium00
20
3.2Well Locaton11/20/20211/21/2022036000OpenMedium00
21
3.3Septic Location11/23/20211/22/2022036000OpenMedium00
22
3.4Fire Hydrant & Truck Access11/24/20211/25/2022036000OpenMedium00
23
3.5Plot Plan11/24/20211/25/2022036000OpenMedium00
24
4FINANCIAL - LOAN7/29/20213/29/2022013920000
25
4.1Land Cost1/26/20223/29/2022036000OpenMedium00
26
4.2Interest on Land7/29/20219/29/2021036000OpenMedium00
27
4.3Interest on Const. Loan7/30/20219/30/2021036000OpenMedium00
28
4.4Points, Etc.7/31/202110/1/2021036000OpenMedium00
29
5SEWER & WATER HOOKUP8/3/202110/2/2021036000OpenMedium00
30
6HEALTH PERMIT8/3/202110/6/202103760000
31
6.1Fees8/3/202110/2/2021036000OpenMedium00
32
6.2Percolation Test8/4/202110/5/2021036000OpenMedium00
33
6.3Soils Engineer8/5/202110/6/2021036000OpenMedium00
34
7INSURANCE8/6/202110/7/2021036000OpenMedium00
35
8LOT CLOSING COSTS8/7/202110/8/2021036000OpenMedium00
36
9BUILDING PERMITS8/10/202110/9/202103600000
37
9.1Fees8/10/202110/9/2021036000OpenMedium00
38
9.2Inspection Schedule8/10/202110/9/2021036000OpenMedium00
39
10PRELIMINARY LIST ONLY8/11/202110/12/2021036000OpenMedium00
40
11BUILD PHASE8/12/202110/13/2021036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS8/14/202110/16/202103680000
42
12.1Rough Hardware, Misc.8/14/202110/15/2021036000OpenMedium00
43
12.2Lolly Columns8/17/202110/16/2021036000OpenMedium00
44
12.3Steel Beams8/17/202110/16/2021036000OpenMedium00
45
12.4Rough Lumber, Trusses8/17/202110/16/2021036000OpenMedium00
46
13WINDOWS/OPENINGS8/19/202110/22/202103760000
47
13.1Windows, Grills, Screens8/19/202110/20/2021036000OpenMedium00
48
13.2Exterior Doors,Screens8/20/202110/21/2021036000OpenMedium00
49
13.3Skylights and Light Tubes8/21/202110/22/2021036000OpenMedium00
50
14DEMOLITION8/24/202110/23/2021036000OpenMedium00
51
15LOT CLEARING8/24/202110/27/202103760000
52
15.1Debris Removal & Clearing8/24/202110/23/2021036000OpenMedium00
53
15.2Dump Fee8/25/202110/26/2021036000OpenMedium00
54
15.3Bury Stumps, etc.8/26/202110/27/2021036000OpenMedium00
55
16DRIVEWAY, rough8/28/202110/30/202103680000
56
16.1Grade8/28/202110/29/2021036000OpenMedium00
57
16.2Base Rock, Culverts8/31/202110/30/2021036000OpenMedium00
58
17UTILITIES8/31/202111/2/202103680000
59
17.1Temporary at startup8/31/202110/30/2021036000OpenMedium00
60
17.2Transfer to permanent9/1/202111/2/2021036000OpenMedium00
61
18WELL or PUBLIC WATER9/2/202111/3/2021036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER9/3/202111/4/2021036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT9/7/202111/6/202103600000
64
20.1Establish Finish Floor Height9/7/202111/6/2021036000OpenMedium00
65
20.2Set Back Distances9/7/202111/6/2021036000OpenMedium00
66
21DIG FOUNDATION9/7/202111/6/2021036000OpenMedium00
67
22ROCK PROBLEM9/8/202111/9/2021036000OpenMedium00
68
23PREPARE FOR FOOTINGS9/10/202111/12/202103680000
69
23.1Lay out and excavate9/10/202111/11/2021036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs9/11/202111/12/2021036000OpenMedium00
71
24POUR FOOTINGS & PADS9/14/202111/13/202103600000
72
24.1Yds. of Concrete9/14/202111/13/2021036000OpenMedium00
73
25SET BRICK POINTS9/14/202111/13/2021036000OpenMedium00
74
26TERMITE TREATMENT9/15/202111/16/2021036000OpenMedium00
75
27RADON CONTROL9/16/202111/17/2021036000OpenMedium00
76
28FOUNDATION WALLS9/18/202111/24/202103840000
77
28.1Block/Course9/18/202111/19/2021036000OpenMedium00
78
28.2Piers9/21/202111/20/2021036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete9/21/202111/20/2021036000OpenMedium00
80
28.4Lintels, Rebar9/21/202111/20/2021036000OpenMedium00
81
28.5Parging9/22/202111/23/2021036000OpenMedium00
82
28.6Cement, Sand, etc.9/23/202111/24/2021036000OpenMedium00
83
29WATERPROOF FOUNDATION.9/24/202111/25/2021036000OpenMedium00
84
30COLUMNS/BEAMS SET9/25/202111/26/2021036000OpenMedium00
85
31UNDERGROUND PLUMBING9/28/202111/27/2021036000OpenMedium00
86
32BRICK/STONE, to finish grade9/28/202111/27/2021036000OpenMedium00
87
33GARAGE DOORS9/29/202112/1/202103680000
88
33.1Openers9/29/202111/30/2021036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip9/30/202112/1/2021036000OpenMedium00
90
34DRAIN TILE10/1/202112/2/2021036000OpenMedium00
91
35FIRE PLACE - INTERIOR10/5/202112/4/202103600000
92
35.1Pour Hearth10/5/202112/4/2021036000OpenMedium00
93
35.2Firebox, or Set Prefab10/5/202112/4/2021036000OpenMedium00
94
35.3Brick or Stone Facing10/5/202112/4/2021036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.10/7/202112/11/202103840000
96
36.1
Gravel, Wire, Poly, Grade Stakes
10/7/202112/8/2021036000OpenMedium00
97
36.2Labor to Prepare for Slab10/8/202112/9/2021036000OpenMedium00
98
36.3Rebar, Wire, form boards10/9/202112/10/2021036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
10/12/202112/11/2021036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
10/12/202112/11/2021036000OpenMedium00