Construction Statement Of Work9/9/2026
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING12/10/20262/11/202703680000
7
1.1Land Use12/10/20262/10/2027036000OpenMedium00
8
1.2Easements, Set Backs12/13/20262/11/2027036000OpenMedium00
9
1.3Access, Street Improvements12/13/20262/11/2027036000OpenMedium00
10
1.4Utilities Available12/13/20262/11/2027036000OpenMedium00
11
2HOUSE PLANS2/14/20274/20/202703840000
12
2.1Purchase Standard Plans2/14/20274/15/2027036000OpenMedium00
13
2.2Architect Original Drawings2/15/20274/18/2027036000OpenMedium00
14
2.3Specifications2/16/20274/19/2027036000OpenMedium00
15
2.4Architect Manage Job2/17/20274/20/2027036000OpenMedium00
16
2.5Engineer-Loads & Spans2/17/20274/20/2027036000OpenMedium00
17
2.6Draftsman2/17/20274/20/2027036000OpenMedium00
18
3LOT SURVEY4/21/20276/27/202703840000
19
3.1House & Driveway4/21/20276/22/2027036000OpenMedium00
20
3.2Well Locaton4/22/20276/23/2027036000OpenMedium00
21
3.3Septic Location4/25/20276/24/2027036000OpenMedium00
22
3.4Fire Hydrant & Truck Access4/26/20276/27/2027036000OpenMedium00
23
3.5Plot Plan4/26/20276/27/2027036000OpenMedium00
24
4FINANCIAL - LOAN12/29/20268/29/2027013920000
25
4.1Land Cost6/28/20278/29/2027036000OpenMedium00
26
4.2Interest on Land12/29/20263/1/2027036000OpenMedium00
27
4.3Interest on Const. Loan12/30/20263/2/2027036000OpenMedium00
28
4.4Points, Etc.12/31/20263/3/2027036000OpenMedium00
29
5SEWER & WATER HOOKUP1/3/20273/4/2027036000OpenMedium00
30
6HEALTH PERMIT1/3/20273/8/202703760000
31
6.1Fees1/3/20273/4/2027036000OpenMedium00
32
6.2Percolation Test1/4/20273/7/2027036000OpenMedium00
33
6.3Soils Engineer1/5/20273/8/2027036000OpenMedium00
34
7INSURANCE1/6/20273/9/2027036000OpenMedium00
35
8LOT CLOSING COSTS1/7/20273/10/2027036000OpenMedium00
36
9BUILDING PERMITS1/10/20273/11/202703600000
37
9.1Fees1/10/20273/11/2027036000OpenMedium00
38
9.2Inspection Schedule1/10/20273/11/2027036000OpenMedium00
39
10PRELIMINARY LIST ONLY1/11/20273/14/2027036000OpenMedium00
40
11BUILD PHASE1/12/20273/15/2027036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS1/14/20273/18/202703680000
42
12.1Rough Hardware, Misc.1/14/20273/17/2027036000OpenMedium00
43
12.2Lolly Columns1/17/20273/18/2027036000OpenMedium00
44
12.3Steel Beams1/17/20273/18/2027036000OpenMedium00
45
12.4Rough Lumber, Trusses1/17/20273/18/2027036000OpenMedium00
46
13WINDOWS/OPENINGS1/19/20273/24/202703760000
47
13.1Windows, Grills, Screens1/19/20273/22/2027036000OpenMedium00
48
13.2Exterior Doors,Screens1/20/20273/23/2027036000OpenMedium00
49
13.3Skylights and Light Tubes1/21/20273/24/2027036000OpenMedium00
50
14DEMOLITION1/24/20273/25/2027036000OpenMedium00
51
15LOT CLEARING1/24/20273/29/202703760000
52
15.1Debris Removal & Clearing1/24/20273/25/2027036000OpenMedium00
53
15.2Dump Fee1/25/20273/28/2027036000OpenMedium00
54
15.3Bury Stumps, etc.1/26/20273/29/2027036000OpenMedium00
55
16DRIVEWAY, rough1/28/20274/1/202703680000
56
16.1Grade1/28/20273/31/2027036000OpenMedium00
57
16.2Base Rock, Culverts1/31/20274/1/2027036000OpenMedium00
58
17UTILITIES1/31/20274/4/202703680000
59
17.1Temporary at startup1/31/20274/1/2027036000OpenMedium00
60
17.2Transfer to permanent2/1/20274/4/2027036000OpenMedium00
61
18WELL or PUBLIC WATER2/2/20274/5/2027036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER2/3/20274/6/2027036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT2/7/20274/8/202703600000
64
20.1Establish Finish Floor Height2/7/20274/8/2027036000OpenMedium00
65
20.2Set Back Distances2/7/20274/8/2027036000OpenMedium00
66
21DIG FOUNDATION2/7/20274/8/2027036000OpenMedium00
67
22ROCK PROBLEM2/8/20274/11/2027036000OpenMedium00
68
23PREPARE FOR FOOTINGS2/10/20274/14/202703680000
69
23.1Lay out and excavate2/10/20274/13/2027036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs2/11/20274/14/2027036000OpenMedium00
71
24POUR FOOTINGS & PADS2/14/20274/15/202703600000
72
24.1Yds. of Concrete2/14/20274/15/2027036000OpenMedium00
73
25SET BRICK POINTS2/14/20274/15/2027036000OpenMedium00
74
26TERMITE TREATMENT2/15/20274/18/2027036000OpenMedium00
75
27RADON CONTROL2/16/20274/19/2027036000OpenMedium00
76
28FOUNDATION WALLS2/18/20274/26/202703840000
77
28.1Block/Course2/18/20274/21/2027036000OpenMedium00
78
28.2Piers2/21/20274/22/2027036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete2/21/20274/22/2027036000OpenMedium00
80
28.4Lintels, Rebar2/21/20274/22/2027036000OpenMedium00
81
28.5Parging2/22/20274/25/2027036000OpenMedium00
82
28.6Cement, Sand, etc.2/23/20274/26/2027036000OpenMedium00
83
29WATERPROOF FOUNDATION.2/24/20274/27/2027036000OpenMedium00
84
30COLUMNS/BEAMS SET2/25/20274/28/2027036000OpenMedium00
85
31UNDERGROUND PLUMBING2/28/20274/29/2027036000OpenMedium00
86
32BRICK/STONE, to finish grade2/28/20274/29/2027036000OpenMedium00
87
33GARAGE DOORS3/1/20275/3/202703680000
88
33.1Openers3/1/20275/2/2027036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip3/2/20275/3/2027036000OpenMedium00
90
34DRAIN TILE3/3/20275/4/2027036000OpenMedium00
91
35FIRE PLACE - INTERIOR3/7/20275/6/202703600000
92
35.1Pour Hearth3/7/20275/6/2027036000OpenMedium00
93
35.2Firebox, or Set Prefab3/7/20275/6/2027036000OpenMedium00
94
35.3Brick or Stone Facing3/7/20275/6/2027036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.3/9/20275/13/202703840000
96
36.1Gravel, Wire, Poly, Grade Stakes3/9/20275/10/2027036000OpenMedium00
97
36.2Labor to Prepare for Slab3/10/20275/11/2027036000OpenMedium00
98
36.3Rebar, Wire, form boards3/11/20275/12/2027036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
3/14/20275/13/2027036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
3/14/20275/13/2027036000OpenMedium00