A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | AIGMENTED DESIGNS | ||||||||||||||||||||||
2 | |||||||||||||||||||||||
3 | Specification of the High Level Requirements for AD Platform Management and Development This includes HLRs for: - the Functional Safety, Cybersecurity and Quality objectives of AD Platform (refer to last point below), - the Management of, and Support to AD Platform developments, - the Software Development Process (from Requirements to Implementation, Qualification and Release) and Lifecycle (Agile) applicable to AD Platform, - AD Platform Product and support to Mechatronics, Electronics and Software developments compliant with the industry quality and safety standards (ASPICE, CMMI, ISO 26262...), - AD Platform connectivity to widely used System/SW/HW tools in the industry (in particular automotive, rail, aero/naval/space/defence, power, aviation...), - the Confidence in the use of AD Platform in high quality and safety critical developments (and related Quality/Safety/Cyber certifications, e.g. TCL3/ASILD). | ||||||||||||||||||||||
4 | The approval of this Specification shall occur at each major release (X.0). Interim versions (draft X.Y) are not subject to approval although they are continuously shared with the main STK (CEO Aigmented Designs). | ||||||||||||||||||||||
5 | Revision History (the detailed changes between GoogleDrive versions are available in the doc version history in the top right end corner above next to the Comment and Camera pictures, looking like a Clock). | ||||||||||||||||||||||
6 | Purpose | Version | Date | Author (Role) | Approver (role) | GoogleDrive Version | |||||||||||||||||
7 | Very early draft documented to anticipate the major risks | 0.1 | 19/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.1 to anticipate major risks - July 19, 9:31 PM | |||||||||||||||||
8 | Minor changes to Revision History table | 0.1 | 20/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.1 Minor changes - July 20, 1:25 AM | |||||||||||||||||
9 | Added Product HLRs, Added Connectivity HLRs (Exxotest), Formatting of Cover page + Added Companies Logo | 0.2 | 26/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.2 EOF QUOTE-001 - July, 26, 11:59 PM | |||||||||||||||||
10 | Added HLRs for Connectivity, Platform Upgrade and IT infrastructure, clarified other HLRs. Added new HLRs for internal SW development process, V&V and Management. Clarified the HLRs scope and types in cover page + fomatting | 0.3 | 27/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.3 QUOTE-002 in progress - July 27, 5:44 PM | |||||||||||||||||
11 | Added HLRs for internal SW development process (Requirements, Traceability/Consistency, V&V...) | 0.4 | 27/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.4 QUOTE-002 in progress - July 27, 7:52 PM | |||||||||||||||||
12 | Added Approval process and Approver column + indication to find document version history Renamed HLRs tab Minor changes/corrections in cover page Added HLRs for the evaluation of the internal SW developments against safety standard Added several HLRs related to the Product itself and HL design choices, the IT infrastructure, Business/Mgt, the Technical support to customers and Configuration of AD Platform Added a column for the priority of the HLRs and another one for the applicable industries/applications (automotive, aero, space, naval, rail, all, etc.) Improved/Modified quite a lot of HLRs Added Introduction text and clarifications to better understand the aim of this document Added quite a lot of comments to provide clarity/examples to ease further derivation in refined downstream requirements or highlight open topics | 0.5 | 30/07/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.5 EOF QUOTE-002 - July 30, 10:04 AM | |||||||||||||||||
13 | Added HLRs about the content of the "subset of safety standard" Added HLRs about the "Internal SW Development Process - Safety/Quality Culture" Added Annex A (Safety Culture) and Annex B (Example of ASPICE Process Map) Documented concrete examples of a good safety culture against ISO 26262 requirements in Annex A | 0.6 | 11/08/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.6 QUOTE-003 in progress - August 11, 2:14 AM | |||||||||||||||||
14 | Added relevant clauses from ISO 26262 Part 8 to include in the subset of safety standard, thus in the ADPSP after "translation" into tailored practices | 0.7 | 12/08/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.7 EOF QUOTE-003 - August 12, 10:04 PM | |||||||||||||||||
15 | Added Annexes for clarity of the "Confidence in the use of SW Tools" process | 0.8 | 18/08/2024 | A. Roy (Eng. Advisor) | NA | Draft 0.8 (In progress - No quote yet) | |||||||||||||||||
16 | |||||||||||||||||||||||
17 | |||||||||||||||||||||||
18 | |||||||||||||||||||||||
19 | |||||||||||||||||||||||
20 | |||||||||||||||||||||||
21 | |||||||||||||||||||||||
22 | |||||||||||||||||||||||
23 | |||||||||||||||||||||||
24 | |||||||||||||||||||||||
25 | |||||||||||||||||||||||
26 | |||||||||||||||||||||||
27 | |||||||||||||||||||||||
28 | |||||||||||||||||||||||
29 | |||||||||||||||||||||||
30 | |||||||||||||||||||||||
31 | |||||||||||||||||||||||
32 | |||||||||||||||||||||||
33 | |||||||||||||||||||||||
34 | |||||||||||||||||||||||
35 | |||||||||||||||||||||||
36 | |||||||||||||||||||||||
37 | |||||||||||||||||||||||
38 | |||||||||||||||||||||||
39 | |||||||||||||||||||||||
40 | |||||||||||||||||||||||
41 | |||||||||||||||||||||||
42 | |||||||||||||||||||||||
43 | |||||||||||||||||||||||
44 | |||||||||||||||||||||||
45 | |||||||||||||||||||||||
46 | |||||||||||||||||||||||
47 | |||||||||||||||||||||||
48 | |||||||||||||||||||||||
49 | |||||||||||||||||||||||
50 | |||||||||||||||||||||||
51 | |||||||||||||||||||||||
52 | |||||||||||||||||||||||
53 | |||||||||||||||||||||||
54 | |||||||||||||||||||||||
55 | |||||||||||||||||||||||
56 | |||||||||||||||||||||||
57 | |||||||||||||||||||||||
58 | |||||||||||||||||||||||
59 | |||||||||||||||||||||||
60 | |||||||||||||||||||||||
61 | |||||||||||||||||||||||
62 | |||||||||||||||||||||||
63 | |||||||||||||||||||||||
64 | |||||||||||||||||||||||
65 | |||||||||||||||||||||||
66 | |||||||||||||||||||||||
67 | |||||||||||||||||||||||
68 | |||||||||||||||||||||||
69 | |||||||||||||||||||||||
70 | |||||||||||||||||||||||
71 | |||||||||||||||||||||||
72 | |||||||||||||||||||||||
73 | |||||||||||||||||||||||
74 | |||||||||||||||||||||||
75 | |||||||||||||||||||||||
76 | |||||||||||||||||||||||
77 | |||||||||||||||||||||||
78 | |||||||||||||||||||||||
79 | |||||||||||||||||||||||
80 | |||||||||||||||||||||||
81 | |||||||||||||||||||||||
82 | |||||||||||||||||||||||
83 | |||||||||||||||||||||||
84 | |||||||||||||||||||||||
85 | |||||||||||||||||||||||
86 | |||||||||||||||||||||||
87 | |||||||||||||||||||||||
88 | |||||||||||||||||||||||
89 | |||||||||||||||||||||||
90 | |||||||||||||||||||||||
91 | |||||||||||||||||||||||
92 | |||||||||||||||||||||||
93 | |||||||||||||||||||||||
94 | |||||||||||||||||||||||
95 | |||||||||||||||||||||||
96 | |||||||||||||||||||||||
97 | |||||||||||||||||||||||
98 | |||||||||||||||||||||||
99 | |||||||||||||||||||||||
100 |