| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Project Monitoring Sheet (Plan of Operation) | |||||||||||||||||||||||||||||
2 | Koji Yamada | |||||||||||||||||||||||||||||
3 | Project Title: IT'S ME | (FabLab Kannai) | ||||||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||||||
5 | Activities | Plan | March | April | May | June | Remarks | |||||||||||||||||||||||
6 | Sub-Activities | Actual | Ⅰ | Ⅱ | III | Ⅰ | Ⅱ | III | Ⅰ | Ⅱ | III | Ⅰ | Ⅱ | III | ||||||||||||||||
7 | Output 1: Conceptualization and Specification | |||||||||||||||||||||||||||||
8 | 1.1 Title and Objectives: Redefine the project objective and finalize the project title | Plan | ||||||||||||||||||||||||||||
9 | Actual | |||||||||||||||||||||||||||||
10 | 1.2 Define detailed specifications: Including the exact dimensions of the device, expected battery life, alarm loudness, distance for alarm activation, etc. | Plan | ||||||||||||||||||||||||||||
11 | Actual | |||||||||||||||||||||||||||||
12 | 1.3 Select components: Choose the Bluetooth LE module, type and number of coin batteries, panic alarm speaker, and LED. Ensure the components meet the size and power requirements. | Plan | ||||||||||||||||||||||||||||
13 | Actual | |||||||||||||||||||||||||||||
14 | 1.4 System architecture design: Outline how the device will communicate with the smartphone app and how the alarm system will be activated and deactivated. | Plan | ||||||||||||||||||||||||||||
15 | Actual | |||||||||||||||||||||||||||||
16 | Output 2: Hardware Component Development | |||||||||||||||||||||||||||||
17 | 2.1 Develop the circuit that includes the BLE module, power management for the coin batteries, the panic alarm circuit, and the LED indicator. | Plan | ||||||||||||||||||||||||||||
18 | Actual | |||||||||||||||||||||||||||||
19 | 2.2 Prototype PCB design: Using CAD software, design the PCB that will be used in the prototype. This includes placing components and routing connections. | Plan | ||||||||||||||||||||||||||||
20 | Actual | |||||||||||||||||||||||||||||
21 | Output 3: Software Development | |||||||||||||||||||||||||||||
22 | 3.1 Device firmware: Start with the firmware for the device, ensuring it can manage Bluetooth communication, control the alarm, and handle power management efficiently. | Plan | Weekly Assignment "Networking and Communication" Apr. 24 | |||||||||||||||||||||||||||
23 | Actual | |||||||||||||||||||||||||||||
24 | 3.2 Smartphone app development: Begin developing the app with basic functionalities like device pairing, alarm activation/deactivation, and distance measurement using Bluetooth signal strength. | Plan | Weekly Assignment "Interface and Application Programming" May 1 | |||||||||||||||||||||||||||
25 | Actual | |||||||||||||||||||||||||||||
26 | 3.3 Complete app development: Finish developing and start internal testing of the app. Ensure all functionalities work as expected, focusing on the user interface and user experience. | Plan | ||||||||||||||||||||||||||||
27 | Actual | |||||||||||||||||||||||||||||
28 | 3.4 Firmware refinement: Based on initial testing, make necessary adjustments to the device's firmware, particularly improving power management and Bluetooth reconnection logic. | Plan | ||||||||||||||||||||||||||||
29 | Actual | |||||||||||||||||||||||||||||
30 | Output 4: Prototype Assembly, Field Testing and Refinement | |||||||||||||||||||||||||||||
31 | 4.1 Assemble prototype: With the PCBs manufactured, assemble the first prototype of the device. That includes the package design. | Plan | ||||||||||||||||||||||||||||
32 | Actual | |||||||||||||||||||||||||||||
33 | 4.2 Functionality testing: Test the complete system (device and app) for basic functionalities, including alarm activation/deactivation, distance measurement accuracy, and battery life assessment. | Plan | Presentation at the Fab Academy starts on Jun. 5 | |||||||||||||||||||||||||||
34 | Actual | |||||||||||||||||||||||||||||
35 | 4.3 Field testing: Conduct extensive field testing to identify any issues under various scenarios, such as different environments, distances, and interference conditions. | Plan | Presentation at the JICA HQs for feedbacks | |||||||||||||||||||||||||||
36 | Actual | |||||||||||||||||||||||||||||
37 | 4.4 Iterate based on feedback: Refine the device and app based on feedback from field testing, focusing on improving reliability, user interface, and possibly adding additional features based on test results. | Plan | Need to be continued. | |||||||||||||||||||||||||||
38 | Actual | |||||||||||||||||||||||||||||
39 | Output 5: Finalization and Documentation | |||||||||||||||||||||||||||||
40 | 5.1 Finalize product: Make any last adjustments to the hardware and software. | Plan | ||||||||||||||||||||||||||||
41 | Actual | |||||||||||||||||||||||||||||
42 | 5.2 Documentation I: Prepare the promotion video and slide for presentation | Plan | Presentation at the Fab Academy starts on Jun.5 | |||||||||||||||||||||||||||
43 | Actual | |||||||||||||||||||||||||||||
44 | 5.3 Documentation II: Prepare technical documentation on the website. | Plan | ||||||||||||||||||||||||||||
45 | Actual | |||||||||||||||||||||||||||||
46 | 5.4 Documentation IV: Prepare the user manual. | Plan | Operation Manual: Developed. Local Production and Assembly Manual: Under construction. | |||||||||||||||||||||||||||
47 | Actual | |||||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||||||