A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | AH | AI | AJ | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | District | GHS/GSSS | Nme of Institutions | CCTV Installed (Y/N) | Nos. of CCTV Installed | Nos. of CCTV Functional | Reason for non function | Nos. of CCTV Cameras repaired | Year of Installations | Mechanism to ensure the proper upkeep and maintenance of CCTV Cameras | Responsibility of functioning of the CCTV Cameras at School Level | Responsibility of functioning of the CCTV Cameras at District Level | Who Monitors the Footage of the CCTV Cameras | Storage Capacity in Tera Byte (TB) | How many days CCTV Footage is available | Are all Cameras IP Based | CCTV Online/ Offline | Biometric Installed (Y/N) | Nos. of Biometric Installed | Nos. of Biometric functional | Reason for non function | Remarks if any | |||||||||||||||
2 | Sirmour | GHS | GHS Bhuira | Y | 3 | 3 | NA | nil | SANDEEP PEON | ONLINE | Y | 1 | 1 | NA | |||||||||||||||||||||||
3 | Sirmour | GHS | GHS Malhoti | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
4 | Sirmour | GHS | GHS Banahkiser | Y | 7 | 7 | NA | NIL | Off Line | Y | 1 | 1 | NA | ||||||||||||||||||||||||
5 | Sirmour | GHS | GHS Dharoti-Rajgargh Block | N | 0 | 0 | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | |||||||||||||||||||||
6 | Sirmour | GHS | GHS Nayagaon | N | 0 | 0 | NA | -- | -- | -- | -- | -- | -- | -- | -- | - | -- | Y | 1 | 1 | NA | ||||||||||||||||
7 | Sirmour | GHS | GHS Deval Tikkeri | Y | 4 | 4 | NA | NA | 22/10/2022 | UPS/DVR attached | Karam TGT Med. | DDHE | Karam TGT Med. | yes | Offline | Y | 1 | 1 | 0 | ||||||||||||||||||
8 | Sirmour | GHS | GHS Chamenji | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
9 | Sirmour | GHS | GHS Thorniwal | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | ||||||||||||||||
10 | Sirmour | GHS | GHS Thaina Basturi | N | 0 | 0 | Fund | Y | 1 | 1 | NA | NA | |||||||||||||||||||||||||
11 | Sirmour | GHS | GHS Malgan | N | 0 | 0 | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | Y | 1 | 1 | N/A | ||||||||||||||||
12 | Sirmour | GHS | GHS Dharoti | N | 0 | 0 | 0 | Y | 1 | 1 | |||||||||||||||||||||||||||
13 | Sirmour | GHS | GHS Banona | Y | 4 | 4 | Y | 1 | 1 | ||||||||||||||||||||||||||||
14 | Sirmour | GHS | GHS Sharia | N | 0 | 0 | N/A | N/A | N/A | NA | NIA | NIA | NIL | Y | 1 | 1 | |||||||||||||||||||||
15 | Sirmour | GHS | GHS Rajyon-Malana | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | Internet conection required as biometric machine is running with the help of mob.network | |||||||||||||||
16 | Sirmour | GHS | GHS Lajhogari | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | Internet connection required | |||||||||||||||
17 | Sirmour | GHS | GHS Nai-Nati | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
18 | Sirmour | GHS | GHS Doon Deria | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | not installed due to lack of funds already intimated but with the prior permission of nodal officer Ddhe all staff members of GHS Doon Deria i | ria are making attendance under GPS Doon Deria in the same campus. | |||||||||||||||
19 | Sirmour | GHS | GHS Mandi Khadana | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
20 | Sirmour | GHS | GHS Leu Kuffer | N | 0 | 0 | newly upgraded | N | 0 | 0 | newly upgraded | due to lack of funds | |||||||||||||||||||||||||
21 | Sirmour | GHS | GHS Dhaneshwar | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
22 | Sirmour | GHS | GHS Ghaton | Y | 3 | 3 | na | 3 | 2018 | na | .Nodal officer | na | D.M | 1 | 20 | yes | off-line | Y | 1 | 1 | |||||||||||||||||
23 | Sirmour | GHS | GHS Gehal,Dhamiana | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
24 | Sirmour | GHS | GHS Jarag-GP Jarag | N | 0 | 0 | N/A | Y | 1 | 1 | error 222 shown | ||||||||||||||||||||||||||
25 | Sirmour | GHS | GHS Chokar | Y | 4 | 4 | NA | Y | 1 | 1 | NA | ||||||||||||||||||||||||||
26 | Sirmour | GHS | GHS Devnathanga | Y | 4 | 2 | need repair | 0 | 2018 | n.a | HM | HM | 1 TB | 1 Month | Yes | Off line | Y | 1 | 1 | N.A | |||||||||||||||||
27 | Sirmour | GHS | GHS Maina | Y | 4 | 4 | n/a | n/a | 2018 | na | Nodal officer | na | nodal officer | 1 TB | 20 | yes | offline | Y | 1 | 1 | n/a | ||||||||||||||||
28 | Sirmour | GHS | GHS Dadahu(G) | Y | 4 | 4 | Y | 1 | 1 | ||||||||||||||||||||||||||||
29 | Sirmour | GHS | GHS Tali Chandrauna | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
30 | Sirmour | GHS | GHS Kando Kansar | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
31 | Sirmour | GHS | GHS Khalakiyar | Y | 6 | 6 | NA | Y | 1 | 1 | NA | ||||||||||||||||||||||||||
32 | Sirmour | GHS | GHS Kajwa | Y | 4 | 0 | Battery Dead | nil | 2021 | NA | Baru Ram tgt arts | Baru Ram | 1 tera byte | 10 days | yes | offline | Y | 1 | 1 | NA | |||||||||||||||||
33 | Sirmour | GHS | GHS Chou Bhoggar | Y | 4 | 4 | computer system not available | nil | 2022 | Harender kumar OT | Babita parmar H. M | NA | yes | offline | Y | 1 | 1 | NA | |||||||||||||||||||
34 | Sirmour | GHS | GHS Shivpur | N | 0 | 0 | not installed | 0 | NA | NA | NA | NS | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | ||||||||||||||||
35 | Sirmour | GHS | GHS Barol | Y | 4 | 2 | Need repair | 0 | 2021 | NA | Y | 1 | 0 | Need repair Screen Damaged | |||||||||||||||||||||||
36 | Sirmour | GHS | GHS Dungi | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | ||||||||||||||||
37 | Sirmour | GHS | GHS Dhaili | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
38 | Sirmour | GHS | GHS Mahipur | N | 0 | 0 | Due to budget problem | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | |||||||||||||||||
39 | Sirmour | GHS | GHS Anji Banuna | Y | 4 | 4 | NA | 4 | 22-04-2022 | encasing of dvr box | Hitender TGT arts | Hitender | 1 Tera byte | 10 days | yes | offiline | Y | 1 | 1 | NA | |||||||||||||||||
40 | Sirmour | GHS | GHS Bandal | Y | 6 | 5 | Technical Problem | Nil | 2021 | Miss Sakshi Chauhan | Smt Aruna Bhardwaj | 6TB | Yes | Offline | Y | 1 | 1 | NA | |||||||||||||||||||
41 | Sirmour | GHS | GHS Kuffer kiara | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
42 | Sirmour | GHS | GHS siun | N | 0 | 0 | Y | 1 | 0 | ||||||||||||||||||||||||||||
43 | Sirmour | GHS | GHS Kotla molar | N | 0 | 0 | not installed | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | in working | ||||||||||||||||
44 | Sirmour | GHS | GHS Jaar Drabil | N | 0 | 0 | Not installed | N.A | N.A | N.A | N.A | N.A | N.A | N.A | N.A | N.A | N.A | N | 0 | 0 | N.A | ||||||||||||||||
45 | Sirmour | GHS | GHS Sail | N | 0 | 0 | Not installed | N/A | N/A | N/A | N/A | NA | NA | NA | NA | NA | N | 0 | 0 | ||||||||||||||||||
46 | Sirmour | GHS | GHS Panyali | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | ||||||||||||||||
47 | Sirmour | GHS | GHS Pamta Shama | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
48 | Sirmour | GHS | GHS Jaswin | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
49 | Sirmour | GHS | GHS Dhar | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
50 | Sirmour | GHS | GHS Naya | N | 0 | 0 | budget problem | nil | ona | na | na | na | nana | na | na | nana | na | Y | 1 | 1 | n/a | ||||||||||||||||
51 | Sirmour | GHS | GHS Poka | Y | 4 | 0 | Technical problem | Nil | 2020 | NA | NA | NA | NA | na | NA | NA | NA | Y | 1 | 1 | NA | ||||||||||||||||
52 | Sirmour | GHS | GHS Ajroli | Y | 6 | 6 | Nil | Nil | 2019 | NA | incharge Sh Kundan Singh TGT | NA | NA | NA | NA | Offline | N | 1 | 1 | NA | Biomatric installed | ||||||||||||||||
53 | Sirmour | GHS | GHS Digwa | Y | 4 | 4 | nil | nil | 2021 | Na | Dharam singh DM | ddhe | N A | Na | yes | offline | Y | 1 | 1 | n/a | |||||||||||||||||
54 | Sirmour | GHS | GHS Dahar | N | 0 | 0 | NA | Y | 1 | 1 | NA | singnal problem some time and biometrimachine show some error some time | |||||||||||||||||||||||||
55 | Sirmour | GHS | GHS Bella | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
56 | Sirmour | GHS | GHS Gundah | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
57 | Sirmour | GHS | GHS Badwa | N | 0 | 0 | not installed | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | CCTV required | |||||||||||||||
58 | Sirmour | GHS | GHS Kuner Dhamon | N | 0 | 0 | N | 0 | 0 | not installed due to non availability of sufficient funds | |||||||||||||||||||||||||||
59 | Sirmour | GHS | GHS Loza | N | 0 | 0 | not installed | nil | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | Newly upgrade | not installed due to non availability of | of sufficient funds | ||||||||||||||
60 | Sirmour | GHS | GHS Behral | Y | 4 | 4 | WORKING | 4 | 2019 | Y | 1 | 1 | |||||||||||||||||||||||||
61 | Sirmour | GHS | GHS Dandapagar | N | 0 | 0 | Y | 1 | 1 | n/a | |||||||||||||||||||||||||||
62 | Sirmour | GHS | GHS Sunog | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | ||||||||||||||||
63 | Sirmour | GHS | GHS Kalatha | N | 0 | 0 | not installed | Y | 1 | 1 | na | ||||||||||||||||||||||||||
64 | Sirmour | GHS | GHS Gojjar | Y | 7 | 7 | - | NA | - | - | -- | - | - | - | - | - | - | Y | 1 | 1 | - | - | |||||||||||||||
65 | Sirmour | GHS | GHS Salwala | Y | 5 | 5 | - | NA | 2019 | NA | NA | NA | NA | - | 20 | NA | NA | Y | 1 | 1 | - | - | |||||||||||||||
66 | Sirmour | GHS | GHS Nawada | N | 0 | 0 | Not installed | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | |||||||||||||||||
67 | Sirmour | GHS | GHS Dhigali | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | CCTV required | ||||||||||||||||
68 | Sirmour | GHS | GHS Amarkot | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | ||||||||||||||||
69 | Sirmour | GHS | GHS Khorowala | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | no funds to install | |||||||||||||||
70 | Sirmour | GHS | GHS Jwalapur | N | 0 | 0 | not installed | N | 0 | 0 | |||||||||||||||||||||||||||
71 | Sirmour | GHS | GHS Sirmouri Tal | N | 0 | 0 | not installed | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | n/a | ||||||||||||||||
72 | Sirmour | GHS | GHS Gulabgarh | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | |||||||||||||||||
73 | Sirmour | GHS | GHS Khara | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | school upgraded in August, 2022 | does not have any funds | ||||||||||||||
74 | Sirmour | GHS | GHS Kandela | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | Dongle alongwith sim required | |||||||||||||||
75 | Sirmour | GHS | GHS Bangran | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | NA | School upgraded in September 2022 & does not have any funds to purchase the machine | |||||||||||||||
76 | Sirmour | GHS | GHS Behrawala | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
77 | Sirmour | GHS | GHS Bhattanwali | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | |||||||||||||||||
78 | Sirmour | GHS | GHS Sainwala | Y | 4 | 4 | - | - | 2018 | by office | Jr.Assistant | NA | TGT (NM) | 1TB | 10 | No | offline | Y | 1 | 1 | - | ||||||||||||||||
79 | Sirmour | GHS | GHS Jamli | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | Na | |||||||||||||||||
80 | Sirmour | GHS | GHS Daghera | N | 0 | 0 | Y | 1 | 0 | Not stable | Signal problem | ||||||||||||||||||||||||||
81 | Sirmour | GHS | GHS Nihog | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | Sometimes Network problem | |||||||||||||||
82 | Sirmour | GHS | GHS Malgaon | Y | 4 | 4 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | ||||||||||||||||||
83 | Sirmour | GHS | GHS Mandlahan | Y | 3 | 3 | NA | Y | 1 | 1 | NA | ||||||||||||||||||||||||||
84 | Sirmour | GHS | GHS Tarapur Chhassi | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
85 | Sirmour | GHS | GHS Nahan Cantt | Y | 5 | 4 | stolen | nil | 2019 | HM | staff | Distt co ordinator | HM | about 1.6 TB | 4-5 days | yes | off-line | Y | 1 | 1 | NA | sometimes not works | |||||||||||||||
86 | Sirmour | GHS | GHS Parduni | N | 0 | 0 | NA | 0 | na | na | na | na | na | na | na | na | Y | 1 | 0 | internal error | technical fault | ||||||||||||||||
87 | Sirmour | GHS | GHS Bankala-II | Y | 7 | 3 | Led not istalled by the concerned authority | nil | 3camera 20-21, 4 camera22-23 | HM | staff | DDHE Sirmour | NA | 1TB | 5days | NA | offline | Y | 1 | 1 | |||||||||||||||||
88 | Sirmour | GHS | GHS Dhakwala | N | 0 | 0 | Y | 1 | 1 | ||||||||||||||||||||||||||||
89 | Sirmour | GHS | GHS Naurangabad | Y | 2 | 2 | na | nil | 2022 | na | staff | na | HM | 1TB | 5days | offline | Y | 1 | 0 | irregular network | |||||||||||||||||
90 | Sirmour | GHS | GHS Malowala | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 1 | NA | |||||||||||||||||
91 | Sirmour | GHS | GHS Lohgarh | N | 0 | 0 | N/A | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | N/A | Biometric required | |||||||||||||||
92 | Sirmour | GHS | GHS Devka | N | 0 | 0 | N | 0 | 0 | ||||||||||||||||||||||||||||
93 | Sirmour | GHS | GHS Nalka | N | 0 | 0 | N/A | N/A | N/A | NA | NA | NA | NA | NA | NA | NA | NA | N | 0 | 0 | N/A | Biometric required | |||||||||||||||
94 | Sirmour | GHS | GHS Kodewala | N | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | Y | 1 | 0 | Network problem | ||||||||||||||||
95 | Sirmour | GSSS | GSSS Bharoli | Y | 4 | 4 | NA | NA | 2019 | NA | PRINCIPAL | DDHE NAHAN | VIRENDER GAZTA | 2TB | 28 DAYS | NA | OFFLINE | Y | 1 | 1 | NA | NA | |||||||||||||||
96 | Sirmour | GSSS | GSSS Glanaghat | Y | 4 | 4 | NA | 0 | 2018 | online | Y | 1 | 1 | ||||||||||||||||||||||||
97 | Sirmour | GSSS | GSSS Nainatikkar | Y | 8 | 8 | NA | 0 | 2019 | yes | yes | na | INCharge CCTV | 2 tb | 15 days | yes | both | Y | 1 | 1 | NA | nil | |||||||||||||||
98 | Sirmour | GSSS | GSSS Narag | Y | 16 | 16 | NA | 2 | 2017 | Principal GMSSS Narag | DDHE Sirmour | Incharge CCTV | 1 TB | 3 M | NO | Offline | Y | 1 | 1 | NA | |||||||||||||||||
99 | Sirmour | GSSS | GSSS Phagoo | Y | 8 | 8 | NA | NA | 2019 | NA | Naveen Kumar | DDHE Sirmour | Naveen Kumar | 1TB | 1 month | no | online | Y | 1 | 1 | NA | NA | |||||||||||||||
100 | Sirmour | GSSS | GSSS Rajgargh(U) | Y | 16 | 16 | N/A | 4 | 2017 | From Different Grants | Manish Bhardwaj, VT AM | DDHE Nahan | Manish Bhardwaj | 1TB | 14 Days | Online | Y | 1 | 1 | NA | One old is o/o |