IDNameDescriptionRefTypeNotesRegionStaffStaffNotesStatusPrimeToDoActivityReviewProjectLinkDocumentationFeaturedArea
2
C2011-01Ped/cycling bridge over Rideau River - named Adawe CrossingCritical crosstown link between Somerset E and Donald Sts.CyclingComponentFirst Public Open House 2011-Jan-13. Opened on Dec 4/15Ward 12,
Ward 13
Post-Build ReviewPaul Clarke
Heather Shearer
Monitoring operations.
Submitted comments at consultation. Spring 2016 feedback about pending bollard installation.
AWG Project Folder
East
3
C2011-02Modification of signalized crossing: Presland Rd at Vanier Parkway Intersection change to give road access to a new development on east side of Vanier Pkwy, while keeping Presland dead-ended to traffic on both sides of the parkway.CyclingComponentWe got word of this years ago but never heard when it was going ahead.Ward 13Post-Build ReviewAssign a prime2015-Dec-24: Photos taken. No paint on crossride.
Need to review operation (e.g. signal response, ability to ride legally to/through crossing)
AWG Project Folder
East
4
C2012-01Baseline Road Rapid Transit CorridorBaseline Road Rapid Transit Corridor (Bayshore Station to Billings Bridge Station) Planning and Environmental Assessment StudyCyclingComponentProject suspended in 2014.
Reopened after PTIF funds were allocated in 23-Aug-2016.
Supposed to include cycling facilities (raised tracks).
Ward 7,
Ward 8,
Ward 9,
Ward 16,
Ward 17
Jabbar SiddiqueFunctional DesignPaul ClarkeAwait response to 2016-Oct-24 letterWe are on PCG. Paul and Heather S attended PCG mtg #5 on 2016-Oct-03. Roll plans seen revealed issue of how signal phases will be programmed at intersections where the busway has to make a turn. 2016-Oct-24: Letter of feedback sent to Siddique. Five councillors cc:ed on e-mail.http://ottawa.ca/en/city-hall/public-consultations/baseline-road-rapid-transit-corridor-bayshore-station-billings-bridge
AWG Project Folder
Central
5
C2013-01Main Street Complete StreetComplete rebuild (road/sewer/water), with replaced sidewalks and new cycle tracks. From Hawthorne Ave to Rideau River. CyclingComponentSection Lees to Clegg opened Aug 29/16 to traffic both ways but still work going on for landscaping etc.
Cycle tracks almost finished as of Aug 30/16
Ward 17Josée Vallée (proj mgr)ConstructionBrian McPherson, Paul Clarke, Don FuglerCheck finished facility for problems2013-Jul-??: Spoke in favour at TRC.
Monitoring for proper accommodation in detours.
AWG Project Folder
East
6
C2013-02McIlraith Bridge rehabilitationStructural repairs to bridge built 1964. Better lighting and cycling lanes to be addedCyclingComponentConstruction to continue until summer 2017. Road work done by end 2016. Summer 2016 update: signs added to tell motorists not to honk at cyclists for taking the lane!Ward 17,
Ward 18
ConstructionBrian McPherson2013-Jun-??: Members questioned why no cycle tracks at June 2013 Open House
AWG Project Folder
East
7
C2013-03Upgrade to drainage on John Sutherland DriveInstall storm sewer infrastructure along the main road through Queensway Carleton Hospital campus. Repair adjacent section of Greenbelt Pathway in the process.CfSCE-mail from hospital Jan 15/16 to say the asphalt part of the path will be reinstated in spring 2016. In parallel, the city is planning a Community Connections project (CC12) that may supersede that promise, delaying the asphalt reinstatement.
Construction began Aug 31/15. Completed sidewalk only November 2015. 2016-Nov 18: MUP finally reinstated (asphalt relinked to crossing of Richmond at John Sutherland).
Ward 8ConstructionPaul Clarke2013, 2014: Sent messages to the hospital admin and to Councillor Chiarelli to fix drainage and resulting path degradation.
AWG Project Folder
Central
8
C2013-04Rideau River Western Pathway - Belmont Ave to Univ of OttawaMUP along river.P1-9CyclingComponentLots of PCG and public meetings. Argument over ownership of land near Oblate lands. July 2016 - Robin says some of route will be on Rideau Garden Drive instead of at the river edge. (I forget why.) Construction to start 2017.Ward 17Robin Bennett, Vipin BansalDetailed DesignBrian McPhersonObtain detailed design plans to reviewhttp://ottawa.ca/en/city-hall/public-consultations/transportation/rideau-river-western-pathway-overview
AWG Project Folder
East
9
C2013-04ARideau River Pathway - lighting and link through parkCyclingComponentNOT SURE OF THIS...related to P1-9? Clarify with Robin Bennett
2016-Aug-23: Included as PTIF Project
PreliminaryAssign a prime
AWG Project Folder
East
10
C2014-01Albert St. Civic WorksConstruction of storage tunnel for sewage overflows and building of the Pimisi station have closed the Albert St MUP, Preston to Empress.CyclingComponentWe received detour map in January. Detour moved cyclists up to Wellington/SJAMP. MUP reopened in late June Ward 14Damon Berlin
Rail Implementation Office
ClosedMichael Powell, Eric DarwinPart affecting cycling appears to be completed.Announcement
AWG Project Folder
Central
11
C2014-02Reconfiguration of MUP junction at Carling crossrideCrossride was built in 2014. Since its opening, the city was considering reconfiguring the north side to reduce interference between people waiting at signal and those passing throughFixThe gap left for westbound cyclists turning right requires going through a 90cm gap between the signal box and the fence. Situation was being re-evaluated in 2015. Off-ramp thing is currently blocked with markers.
Latest proposal was to move the signal control box. Redesigning signal installation to comply with AODA and OTM Book 12. On hold due to spending freeze.
Ward 7Jeff Doxtater
Peter Grajcar
Functional DesignPaul ClarkeAdd design drawing to Google Docs. Paul has a copy.2013 Summer: Initial engagement in summer 2013, prior to build.
2014 Spring: Conflicts highlighted after spring 2014 opening.
AWG Project Folder
Central
12
C2014-03O'Connor Bikeway Phase 1A north/south bikeway from Laurier to StrathconaP1-13Cycling2015-May-??: Approved by council. Laurier to Strathcona to have segregated bi-directional lanes on the east side. Glebe parts to have lanes to Glebe, then mixed use.
2016-Jun-22: Construction began. 2016-Oct-25: Official opening
Ward 14
Ward 17
Robert Grimwood
Heidi Cousineau
Kate Whitfield
Kate Whitfield is project administratorPost-Build ReviewAlex deVriesMonitor usage. Address causes of collisions in first few weeks.Major e-mailing campaign spearheaded.
Many of us attended Public Info Session approx Mar-Apr 2016. Etienne Grall is CfSC liaison with city for the bikeway ambassadors effort.
City Page
AWG Project Folder
Central
13
C2014-03AO'Connor Bikeway Phase 2A north/south bikeway from Wellington to Laurier. Post LRT project.P1-13Cycling2015-May-??: Approved by council.
Ward 14Robert Grimwood,TBDFunctional DesignAlex deVriesObtain plans for reviewCity Page
AWG Project Folder
Central
14
C2014-04O-train MUP phase 2The O-train pathway is to be extended from Young to Carling.CyclingComponentCommitted to be built by the end of 2015. Plan changed at open house to have MUP paved over the entire length. (Additional funds were found.)
2016-Sep-29: Monitor for new curb cut at Hickory Bridge and hopefully bollard changes promised by Robin Bennett.
2016-Oct-11: Connections to be made to Pamilla, Norman, Aberdeen and George Streets.
Ward 14,
Ward 15,
Ward 17
Max Ross, Robin BennettConstructionEric DarwinMonitorParticipated on the PAC.
Lobbied for paving the full length.
2015-Nov-??: Paving done.
2015-Dec-??: Carling signals operational mid-December
City Link
AWG Project Folder
Central
15
C2014-05Pimisi ConnectivityMulti-use pathway links to and through Pimisi LRT station on the Confederation Line (at Booth Street).CyclingAWG determined there was a lack of connections between Pimisi's MUPs and Booth Street to the north of the LRT. The various MUP segments are under jurisdiction of several separate deptsWard 14Rail Implementation OfficeUnknownEric DarwinEric to send input to RIO.2015-Apr-21: AWG reviewed the proposed MUP connections map.
AWG Project Folder
Central
16
C2014-06Orleans watermain link (OWL)Work is being done on Coventry from Lola to St Laurent. Mixture of bicycle facilities is being implemented (MUP, tracks, lanes). Includes P1-2P1-2CyclingComponentProblems getting responses from the city's engineering consultants. Geometry drawings finally rec'd Aug 2014. Pavement marking drawings requested Oct 2014 but only rec'd Apr 23/15.Ward 13Bruce Kenny, , Derek Lougher-Goodey, Robert Grimwood. Also Patrick Chamney (Robinson Consultants)Post-Build ReviewPaul ClarkeFinal ride review2014-Sep-16: AWG reviewed the geometry drawings. PC had discussion with Rob Grimwood to fill in missing info.
AWG Project Folder
East
17
C2014-07East-west bikeway (Laurier/Bay to Albert)This is a connection to get from the Albert St. MUP to Laurier. AKA "Nannygoat Hill" path.CyclingWard 14Zlatko Krstulic, Mark McMillanPost-Build ReviewPaul Clarke2015-Jun-01: Sent letter to McMillan. City may think it is complete but still no crossride paint on Bronson/Slater intersection
AWG Project Folder
Central
18
C2014-08Crossing at Clegg and Colonel ByFormerly unsignalized T-intersection receiving signals for cyclists, pedestrians, and cars exiting Clegg. CyclingComponentAWG reviewed operation in first few weeks. Concerns about Clegg traffic turning right on red--blocking both the crossride and crosswalk. Also visibility concerns, missing signs, etc. Sept 2016 - now that Main north of Clegg is open, has traffic pattern changed at this intersection?NCC,
Ward 17
We are trying to find out who from city and NCCPost-Build ReviewBrian McPherson, Paul ClarkeMonitoring for proper accommodation in detours.2015-Jun-22: Reviewed situation at AWG. E-mailed NCC to learn who will receive input. Operational as of May 22/15. Safety concerns for cyclists, see Notes.
AWG Project Folder
Central
19
C2014-09Alta Vista Hospital LinkNew road to connect hospital complex to Riverside Dr. Includes P1-1.P1-1CyclingComponentWard 17,
Ward 18
Bruce Kenny (city), Darrin Alberty (contractor)ConstructionPeter Fawcett
AWG Project Folder
East
20
C2014-10Updates to Chaudiere Crossing in connection to Zibi development.CyclingComponentExpected that Zibi will begin implementing their plan during Phase One ConstructionPreliminaryBrett Hodnett 2013-Nov-28: Hans and Paul held meeting with Jeff Westeinde of Windmill Developments.
AWG Project Folder
Central
21
C2015-01Airport Parkway/Lester Road WideningWidening the airport parkway with potential addition of MUP in corridor.CyclingComponentMUP is planned for west side of corridor from Brookfield to Uplands. On-road cycling being discouraged--we question this.

Also, MUP has to cross two busy roads (Walkley, Hunt Club) at grade, which will mean delays for cycle commuting. Study period completed Sept 9/16.
Ward 10
Ward 16
Ward 17
Frank McKinneyFrank McKinney took over from Colin Simpson. Also Ron Clarke at Parsons.EAGareth Davies, Paul ClarkeWe are on the PCG.
2015-Mar-23: Letter sent to Simpson.
2015-Jun-22: E-mail to Ron Clarke.
2015-Nov-04: Letter sent to McKinney.
2016-Jan-12: McKinney feedback rec'd.
City Page
AWG Project Folder
South
22
C2015-02Trillium Line (south) LRT extensionStage 2 LRT to run train down to Bowesville.CyclingComponentThere will be a MUP bridge built over Hunt Club Road, just to the east of the railway bridge. The MUP is expected to extend south as far as Lester Road, always staying on the east side of the LRT.Ward 10
Ward 16
Ward 17
Ward 20
Ward 22
Colin SimpsonEAGareth DaviesWe are on the PCG.
Letter sent to Simpson
AWG Project Folder
Central
23
C2015-03Coventry Pedestrian and Cycling BridgeOfficially named Max Keeping Bridge. This bridge crosses the 417 Highway just east of the Vanier Parkway.CyclingComponentBridge opened in February, 2015. Not sure why there’s no MUP connection to train station. Formal connection to Coventry on east side of ballpark is Community Connection #9 (CC9) in Strategic Initiatives.Ward 13
Ward 18
Post-Build ReviewPaul ClarkeMonitor usage. Push for cyclable link to Tremblay LRT and VIA stationsBridge is completed; connections to bridge at south end for cycling are lacking still, mainly due to LRT construction.
AWG Project Folder
East
24
C2015-04New traffic signals on Bronson near the CanalA new crossride is to be installed so cyclists can get from the Glebe to/from Carleton University.CyclingComponentThis is Phase II of safety improvements in this area. Ward 17Post-Build ReviewAlex deVries
Alex Wilcox
Monitor. Push for crossride markings.2015-Oct-04: Photos taken by Paul Clarke during construction.
2015-Nov-18: E-mail to Robin Bennett about signage problems.
2016-Dec-16: Christie Cole supplied photos of ~95% completion. 2016-Oct-18: Alex W reports that green crossride paint has been applied.
Mostly finished as of Dec 2015. Construction began late Sept 2015. Crossride still not painted as of summer 2016
AWG Project Folder
Central
25
C2015-05Chapman Mills Dr. extension, with BRT corridorWestward extension of arterial in Barrhaven, from Longfields to Strandherd (w/ study on Bus Rapid Transit corridor from Greenbank to Borrisokane)CyclingComponentRoad extension is scheduled in the TMP for 2020-2025 period, SUBJECT TO AVAILABLE FUNDING. Bus corridor down the middle is not until after 2031. Latest Public Open House was 2016-Mar-21. Notice of EA study completion issued 2016-Nov-10.Ward 3,
Ward 22
Jabbar SiddiqueEAHeather ShearerCheck ESR. Public review ends approx 2016-Dec-17We are on the PCG.City page
AWG Project Folder
South
26
C2015-06Ottawa Queensway (417) mid-town bridge replacementsMTO plans to rehabilitate/replace the bridges at 11 crossings of streets, between Holland and O'ConnorCyclingComponentWe wrote a letter to the MTO on April 21, 2015, received response right away.MTO, Ward 14, Ward 15, Ward 17Don Rowat (MTO),
Steve Taylor (consultant, Bytown Engineering)
Functional DesignPaul ClarkeMonitoring2015-Apr-21: Letter sent to MTO.
Watching for next public engagement.
AWG Project Folder
Central
27
C2015-06AMUP on the west side of the O-Train rail linePreserving future chance of a pathway.CfSCThe 417 bridge replacement was to have a narrower span across the O-train pathway, removing opportunity for a future path. In May 2015, MTO committed to preserve some space. No pathway is planned yet.
CfSC lobby has concluded. Path paved by highrise owners from Hickory up to Ev Tremblay Park, August 2016, as per devel agreement, I believe.
MTO,
Ward 15
MPP Yasir Naqvi
Councillor Leiper
ClosedEric Darwin,
Paul Clarke
MonitorWe wrote to MTO, councillors, and city staff
AWG Project Folder
Central
28
C2015-06BHighway 417 CPR/O-Train Bridge Replacement One of many Queensway Midtown Bridges being replaced.ImpactDesign Study and EA commencing 2016-Nov-16. A PIC is expected to be held Spring 2017.Peter Freure (MTO), Lincoln MacDonald (MMM Group)EAEric DarwinAssign a primehttp://www.highway417cpr-otrainbridges.comCentral
29
C2015-07Sir John A Macdonald Parkway reconfigurationPart of the SJAMP west of Dominion is to be rebuilt as part of Western LRT 100-day solution, and will involve changes to the pathways.CyclingComponentBy shifting the parkway south, this will increase parkspace and there’s an opportunity to make changes to the pathway (eg. widen it, move it around flood areas, 'twin' it). Still at a conceptual level.NCCTBD. Maybe Mike Muir.Functional DesignPaul Clarke2015-May-05: Participated in workshop. Written submissions from several members.
AWG Project Folder
Central
30
C2015-08LRT extension (west)Part of "Stage2" LRT, from Tunney's Pasture to Baseline and BayshoreCyclingComponentEPR released June 2016 for start of 120-day study period.Ward 7,
Ward 8,
Ward 15
Nelson EdwardsEAHeather Shearer, Paul ClarkeMonitor2016-Sep-12: CfSC commentary sent to N Edwards.
AWG Project Folder
West
31
C2015-09LRT extension (east)Part of "Stage2" LRT, from Blair out to approx Trim RdCyclingComponentWard 1,
Ward 2,
Ward 11
Angela TaylorEAPeter Fawcett
AWG Project Folder
East
32
C2015-10Corkstown east of MoodieConnection between two parts of the Watts Creek Pathway as it crosses Moodie should be rebuilt.CfSCThe cycling facilities should be better once Corkstown Rd is realigned during the build of the Western Transitway Extension (WTE) from Bayshore to Moodie. Plans shown at open house on Dec 10/15 still showed deficienciesWard 7Councillor Taylor PreliminaryPaul Clarke, Gareth Davies, Alex deVriesAttend station connections meeting on 2016-Oct-062014-Oct: E-mailed Taylor.
2015-Jun-04: Met with Taylor.
2015-Jun-21: Wrote to WTE staff.
2015-Jun-30: Spoke at TRC meeting. 2016-Sep-12: Met with Taylor and city staff on-site and sent follow-up e-mail to summarize short-term improvements.
AWG Project Folder
West
33
C2015-11Rockliffe Driveway laneCouncillor requested NCC put bike lane on this one-way scenic drivewayCyclingAWG members report that painting of lane has been done.NCC,
Ward 13
Councillor Nussbaum, NCC Director of Urban Lands and Transportation Marc CorriveauClosedPaul ClarkeGave initial reaction of concern due to conflicts with parking vehicles.AWG members report that painting of lane has been done.
AWG Project Folder
East
34
C2015-12St Laurent Blvd cycling lanesFeasibility study on bike lanes between Hemlock Street and Montreal RoadCyclingOpen House #2 held on June 17/15.Ward 13Zlatko Krstulic, Andrew EvraireClosedPeter Fawcett, Olivier Morrissey
AWG Project Folder
East
35
C2015-13Beechwood Avenue Transportation CorridorRelayout of Beechwood so that cycle route does not have to detour onto Barette St for three blocks.CyclingComponentPublic consultation on June 23/15. 2016-Sep-09: Believed to be almost finished construction.Ward 12,
Ward 13
Zlatko KrstulicConstructionPeter Fawcett, Sarah PartridgeSubmitted comments at consultation. 2016-Sep-20: Gareth e-mailed Fleury's office about room for improvement about the bike lanes
AWG Project Folder
East
36
C2015-14Cyrville Road Cycling LanesUpgrade facilities, Meadowbrook to OglivieP1-22CyclingFunctional design done by MMM Group. Detailed design contracted to Robinson Consultants. FD put up on city website mid-July 2015.
Construction in progress, summer 2016. Construction completed except landscaping, Nov 2016.
Ward 11Zlatko Krstulic (planning), Jamie MacDonald (construction)Post-Build ReviewPaul ClarkeStill looking for a new prime. Volunteer?2015-Aug-18: Sent e-mail with questions to Zlatko.
AWG Project Folder
East
37
C2015-15MUP extension on Murray St - from Mackenzie to SussexContinue the MUP that starts from Alexandra Bridge closer to the market.CfSCBiggest benefit is to simplify getting to Hull for northbound cyclists on Sussex. Need to involve city and NCC.Ward 12, NCC, probably US EmbassyNone identified yetPreliminaryPeter Fawcett2015-May-20: AWG discussed.
AWG Project Folder
Central
38
C2015-16Parking lot interference with MUP: Mill Street Brew PubLobby to change parking stalls that border the Ottawa River Pathway so long vehicles do not obstruct it.CfSCNCC plans to rearrange parking at the site in the coming years. This should be an opportunity to correct the situation. Ward 14ClosedHayley Price-Kelly
Gareth Davies
2015-Dec-07: Raised with Mathieu Brisson of NCC at meeting.Completed May/June 2016 by placing pre-cast concrete curbs in affected parking bays.
AWG Project Folder
Central
39
C2015-17Linking new ped bridge with Coventry RdCC9: MUP between north end of bridge, east around baseball stadium and up to Lola St.CC9CyclingComponentZlatko says will be fast-tracked with no formal consultation like a public open house. Received functional design drawing from Zlatko K on Dec 2/15, although Bruce Kenny did not even respond.Ward 13Bruce KennyClosedPaul Clarke2015-Nov-23: E-mail to Bruce Kenny to get more info.
2015-Nov-18: On-site inspections.
2015-Dec-24: On-site inspections.
2016-Sep-04: Paul Clarke took photos.
AWG Project Folder
East
40
C2015-18Barrhaven Railway MUPP1-3. From Conway-Valiant Tunnel east beside VIA line and on to Highbury ParkP1-3CyclingComponentMore 'before' photos taken in spring 2016 by Paul
Mostly done as of August 2016.
Ward 3Sam Roberts, Susan JohnsConstructionHeather Shearer, Paul ClarkeInspect and send review once complete2015-Nov-??: Photos taken. 2016-May-24: Photos taken. 2016-Oct-19: Photos taken, e-mail on barrier observations sent to City.
Heather rode 2016-10-31. Transition from SB MUP to on-road bike lanes would be much-improved with flared asphalt to allow a more natural angle of entry. With no special intersection treatments, riding across intersections with other roads feels dangerous in both directions - concerned about being hit by a turning driver. When NB at night, glare from oncoming headlights is blinding - tall ornamental grass in the buffer strip is one option to mitigate this. Of course, I rode on the sidewalk at both ends of the MUP to continue my trip on Greenbank.City page
AWG Project Folder
South
41
C2015-19Nepean TrailAlternative route to riding along Merivale Rd shopping strip. Also linking to Woodfield to the west and Prince of Wales.P1-8CyclingComponentHans Moor advised Robin in a ride-along in 2014. Keith Egli and designers presented at one of his ward meetings, ~March 2016.

City Status: Study by September 2016. Preliminary/detailed designs would then be prepared based on the functional planning study with the goal of construction in 2018.
Ward 9Robin Bennett, Kate Whitfield (Parsons)Functional design done. Not sure about city's part of construction; part beside Movati gym has been at least started by landowner.Jim Forbes, Heather ShearerPreviewing2016-02-18: Heather, Jim & Paul attended public meeting held by Egli on the project.http://ottawa.ca/en/city-hall/public-consultations/transportation/nepean-trail
AWG Project Folder
Central
42
C2015-20Shefford Rd pathway - Montreal Rd to SGECPP1-10. MUP linking to the NCC's parkway and pathwaysP1-10CyclingComponentAWG did not show interest to review it at a meeting. Since then, city reached out for comments on the drawings. See http://ottawa.ca/en/city-hall/public-consultations/transportation/shefford-road-multi-use-pathway . Heather Shearer sent input to Sam on her own. On-line consultation was conducted until 2016-Jul-24.Ward 11Sam Roberts (Planning), Jamie MacDonald (ISD)Functional design stage. Construction slated 2017 or 2018Peter FawcettPreviewinghttp://ottawa.ca/en/city-hall/public-consultations/transportation/shefford-road-multi-use-pathway
AWG Project Folder
East
43
C2015-21Mackenzie Avenue Cycle TracksSeg bidirectional facility from St Patrick to Rideau StP1-12CyclingWard 12, NCCZlatko Krstulic, Jamie McDonaldConstructionFeliks WelfeldMonitor construction progress2015-Dec-03: Submission to Zlatko.
2015-Dec-07: Paul and Gareth discussed with NCC.
2015-Dec-15: Gareth sent formal letter to include Fleury, Egli.
2016-Oct-18:Felix took over as Prime from Sarah Partridge
http://ottawa.ca/en/city-hall/planning-and-development/transforming-ottawa/mackenzie-avenue-bike-tracks
AWG Project Folder
Central
44
C2015-22Pathway - Train Yards to CoronationP1-14. MUP from intersection Industrial-Train Yards south to residential streetP1-14CyclingComponentWard 18Sam RobertsFunctional DesignSeamus DeGrandprePreviewing2015-Nov-17: First preview shown to AWG.
AWG Project Folder
East
45
C2015-23Woodroffe Pathway - Norice to CollegeP1-15. MUP to serve employment node at Centrepointe.P1-15CyclingComponentCould be affected by possible future Maintenance and Storage Facility for the LRT when it expands in Stage2.Ward 8Sam RobertsFunctional DesignJim Forbes, Heather ShearerPreviewing
AWG Project Folder
Central
46
C2015-24Hog's Back Link to Sawmill CreekP1-21. MUP to serve employment nodesP1-21CyclingComponentFirst preview shown to AWG, Dec 16/15Ward 16Sam RobertsFunctional DesignHans MoorPreviewing
AWG Project Folder
Central
47
C2015-25Old Riverside to SmythP1-23. MUP and signed local route to access back of Riverside campus of hospital, etc.P1-23CyclingComponentWard 18
Ward 17
Sam RobertsFunctional DesignDon Fugler,
Brian McPherson
Previewing, photos taken
AWG Project Folder
East
48
C2015-26Gladstone Pavement Markings, from Parkdale to PrestonP1-28. Mark shared-use lanesP1-28CyclingWard 14
Ward 15
Robin BennettFunctional DesignRandy Kemp,
Eric Darwin
Previewing
AWG Project Folder
Central
49
C2015-27Ackerson Rd subdivision path links with crossing of EaglesonP1-29. MUPs to fill in missing linksP1-29CyclingComponentWard 23Robin BennettFunctional DesignHeather ShearerPreviewing, photos taken2016-Apr-13: Reviewed at AWG meeting.http://ottawa.ca/en/city-hall/public-consultations/transportation/akerson-subdivision-pathway
AWG Project Folder
West
50
C2015-28Scott St/Albert St. bikeway improvements, Holland to BronsonOne-way tracks designed for both directions, to be built once LRT Confederation Line is opened in 2018 and corridor ceases to be major bus route.P1-31CyclingComponentBike lanes now are not the final ones...just for the interim period when buses are using Scott during LRT build.Ward 14
Ward 15
Robin BennettFunctional DesignRandy Kemp,
Eric Darwin
Obtain latest plans. Find out when detailed design starts.
AWG Project Folder
Central
51
C2015-29Woodroffe Pathway - Longfields to StonewayP1-34. MUP to fix missing linkP1-34CyclingComponentPublic consultation via the web: http://ottawa.ca/en/city-hall/public-consultations/transportation/woodroffe-avenue-multi-use-pathway-extensionWard 9,
Ward 22
Sam RobertsFunctional DesignHeather ShearerPreviewing, photos taken Need to review design2016-10-28: Heather has photos.City page
AWG Project Folder
Central
52
C2015-30Queen Elizabeth Drive - Crossings at Commissioner's Park and at Queen Elizabeth PlaceCC5 (part of): Crossings of QED at Commissioner's Park and at Queen Elizabeth Place (just near Bank). http://www.ncc-ccn.gc.ca/property-management/what-we-manage/queen-elizabeth-driveway-crossing-enhancementsCC5CyclingComponentParts of CC5 (Remainder is UofO tunnel at Corktown Bridge)
2016-Aug-23: Included as PTIF Project. 2016-Sep-26: Construction began.
Ward 17Meghan WhiteheadConstructionBrendan OhUiginnPreviewing2016-Jun-15: Reviewed at AWG meeting.
Alex deVries sent letter to Meghan W. Answer came back that nothing would be changed. 2016-Nov-14: Photos taken; build is almost complete.
City Link
AWG Project Folder
Central
53
C2015-31Road crossing (ped/cycle) of Colonel By Drive CC5 (part of): Revised crossing of Col By at Corktown BridgeCC5CyclingComponentChange at Corktown Bridge/U of O tunnel required due to LRT build in place of TransitwayWard 12Adam HortopFunctional DesignEtienne GrallPreviewing
AWG Project Folder
Central
54
C2015-32Paved shoulders on MacFarlane RdCC6: Paved shoulders between Merivale and DeakinCC6CyclingWill bike lanes be marked? NO.Ward 9Adam Hortop, Louis QuigleyPost-Build ReviewHeather ShearerSomeone in AWG should inspect again, once all finished.2016-Oct-19: Paul C inspected and found edge/lane lines not yet marked. Returning status to 'Construction'. Photos taken. E-mail dialogue followed; see correspondence. 2016-Nov-10: Success to have a 'no-stopping' zone extended. City page
AWG Project Folder
South
55
C2015-33Belfast/Train Yards Corridor MUPCC8: MUP linking Coronation Ave to Coventry RdCC8,
P1-14
CyclingComponentBelfast MUP done from Tremblay to near Train Yards, but then turns into a 2-m sidewalk! Also, bizarre jog at a catchbasin. (Jog fixed as of spring 2016.)Ward 13Adam HortopSome is done. (Some of it includes P1-14.)Previewing
Assign a prime.
AWG Project Folder
East
56
C2015-34Island Park Drive RepavingResurfacing of the road between Carling and ByronCyclingComponentIn advance of construction, and after Gareth met with NCC, Paul sent e-mail to Luc Fournier June 28/16, describing the improvement to connect to MUP. Have had no response. Paving complete as of Oct 7 visit. The centre line and bike lane line markings were not yet done; only crosswalks and stop bars painted.NCC
Ward 15
Marc Corriveau (NCC), Louis Quigley (city)ConstructionPaul ClarkeMonitor result including measure width of reinstated bike lanes2016-Jun-28: E-mailed Luc Fournier to request a curb cut on E/B road and link into Hampton Park MUP. 2016-Oct-07: Although paved, it was observed that no connection or curb cut has been done. 2016-Nov-08: On-site inspection saw guide marks for striping of the bike lanes had been done. 2016-Nov-14: Bike lane lines were seen to have been painted.
AWG Project Folder
Central
57
C2015-35Trillium MUP link from Carling to Dow's LakeTrillium MUP link from Carling to Dow's LakeCC11, PTIF46CyclingComponentCC11 (part of Council Strategic Initiatives)
2016-Aug-23: Included as PTIF Project
Ward 17
NCC
Paul ClarkePreliminaryJacquie LemieuxPreviewing2016-Oct-18: Jacquie took over as Prime from Brendan OhUiginnNews Story 2015-May-22
AWG Project Folder
Central
58
C2015-36Cedarview Road to Holly Acres Rd MUP ImprovementsExisting pathway needs cycling facilities where it crosses Richmond Rd, Baseline Rd. Also geometrical fixes, rehab in places.CC12CyclingComponentCrossride planned for crossing CedarviewWard 8Adam HortopConstructionPaul Clarke2016-Feb-03: Paul spoke with and sent input to Adam until Feb 8th. 2016-Nov-18: Took photos of newly paved MUP piece just south of Richmond Rd.
AWG Project Folder
West
59
C2015-37Underpass at Bank St for Eastern Rideau River PathwayBuild MUP to go under Billings BridgeCyclingComponentNCC did not have money to pay its share (50/50 with city), and so project appeared stalled.
Existing City SAFETY IMPROVEMENT PROGRAM project (Public Works) in concert with NCC
2016-Aug-23: Included as PTIF Project
The PTIF budget seemed more costly than city told us in Dec 2015.
Ward 17
NCC
Shawn McGuirePreliminaryEtienne Grall
AWG Project Folder
TRUEEast
60
C2015-39Rideau Canal Crossing (Fifth to Clegg)New major bridge structure; addresses large gap between Pretoria and Bank.P2-S3Cycling2016-Aug-23: Included as PTIF ProjectWard 17Richard MooreFunctional DesignErinn CunninghamNew project PAC having first meeting 2016-Nov-02 at MMM Group office.Hans and Paul lobbied Yasir Naqvi about this in June 2015http://ottawa.ca/en/city-hall/planning-and-development/rideau-canal-crossing-fifth-clegg
AWG Project Folder
TRUECentral
61
C2015-40Iris Street road resurface and sidewalk addition (Greenbank to Woodroffe)Part of the stretch of Iris will get painted bike lanes. CfSC asked for other bike facilities at the major intersectionsCyclingComponentConstruction commenced late-Aug 2016. No information signed for cyclists. Single-lane traffic in segments during road excavation. Long sections of shaved pavement.Ward 8Marc BezansonConstructionPaul ClarkeCity page
AWG Project Folder
Central
62
C2015-41Chapel Hill Park & Ride EA StudyInterim Park & Ride in Chapel Hill South (Orleans) to fill a need until Cumberland Transitway can be built (beyond 2031). Buses will feed into Blair station.CyclingComponentNotice of Completion issued 2016-Nov-03. The 30-day review period to run from 2016-Nov-14 to 2016-Dec-13.Ward 2Frank McKinney (City)
Robert Vastag (Stantec)
EAJohn BlackReview EPR and submit any concernsAttended PCG Meeting 2015-Nov-18. Assessing cycling links to proposed locations and bike parking facilities.City Page
AWG Project Folder
East
63
C2016-01Campeau Drive cycling and ped safety enhancementsCC1: From Teron Dr N to Kanata AveCC1CyclingComponentCycling lanes already on Campeau. City undertook a survey on the functional design in June-July 2016. (The City is considering changes to Campeau
Drive (Teron Road to Knudson Drive) to address conflicts between
pedestrians and cyclists on the sidewalk on the north side.  A
three-metre-wide multi-use pathway is proposed to replace the existing
asphalt sidewalk.) Detailed design due to finish in 2017.
Ward 4Megan WhiteheadDetailed DesignRoger Farley
farleyroger@yahoo.ca
Previewing2016-Oct-16: Paul C took photos of existing conditions.
2016-Oct-18:Roger took over from Heather Shearer as prime.
City page
AWG Project Folder
West
64
C2016-02Booth Street bridge accommodation for cyclists - short termChange Booth in time for opening of the bridge on 2016-Sep-04, so that some space is allocated for cycling.FixWard 14Steve Cripps and others in RIOPost-Build ReviewGareth Davies
AWG Project Folder
TRUECentral
65
C2016-03Bayview StationConcern that cycling links to and past station are not optimizedCyclingComponentWard 14Meghan WhiteheadPreliminaryEric Darwin
AWG Project Folder
Central
66
C2016-04Richmond Road Complete StreetTo implement a "Complete Street" design concept for the corridor between the Sir John A. Macdonald Parkway in the west and Berkley Avenue in the east, in keeping with the City of Ottawa's new Complete Street Implementation FrameworkCyclingComponentThis work is being done as part of the Phase II LRT project sometime between 2018 and 2023.
The main work will only cover the stretch of the road between Cleary and SJAM Parkway. The design work for Berkeley to Cleary will be incorporated when remediation work on Richmond is done, probably sometime after 2026. However, we will push for a transition design to improve conditions until then.
Ward 7
Ward 15
Marc Magierowicz (city), Paul Croft (Morrison Hershfield), Martha Lush (CSW)Functional DesignPaul Clarke
Randy Kemp
Rob McCrae
Attend PAC Meeting on January 23rd, 2017.
Attend Open House on January 31st, 2017.
2016-Apr-25: Paul and Randy represent the CfSC on the PAC.
2016-Apr-25: Rob McCrae is on the PAC through his condominium.
2016-Apr-25: First meeting of PAC (Paul, Randy, Rob)
2016-May-30: Second meeting of PAC (Paul, Randy, Rob)
2016-Jun-04: Public consultations (Paul, Randy, Rob)
2016-Jul-05: Submission sent to Marc Magierowicz by Paul Clarke.
2016-Sep-14: Rob and Randy attend Richmond Road re-alignment consultation.
2016-Nov-01: PAC meeting to discuss roll plans; our reps not satisfied with many intersections, especially at Woodroffe.
City Page
AWG Project Folder
Central
67
C2016-05Update of city's Transportation Impact Assessment GuidelinesCyclingComponentCitywideEric DarwinAttend next meeting on Nov 282016-Sep-07: Attended first meeting of PAC
AWG Project Folder
Citywide
68
C2016-06Safety improvement of Laurier Ave segregated bike lanes.Audit being commissioned by the City in response to 2016-Sep-01 fatality involving right-turning truck.FixA working group was commenced with first meeting 2016-Sep-16. Mobycon hired to do audit.Ward 14Keith Egli (Chair),  Phil LandryPreliminaryGareth Davies
Paul Clarke
 2016-Sep-15: Meeting #1 of WG. 2016-Nov-07: Meeting #2 with on-site observations
AWG Project Folder
Central
69
C2016-07Byron Avenue Traffic CalmingTraffic calming measures will be incorporated on Byron from Sherbourne Road to Island Park Drive. CyclingComponentIt has been proposed that the city might incorporate Advisory Cycling Lanes on a trial basis along with other cycling facilities.Ward 15Justin SwanFunctional DesignGareth Davies
Randy Kemp
We are on the PAC.
2016-Jun-16: Attended the public consultation.
http://ottawa.ca/en/city-hall/public-consultations/byron-avenue-traffic-calming-design
AWG Project Folder
Central
70
C2016-08Centrepointe Drive and Hemmingwood Way area traffic management studyCyclingComponentWard 8Wook Kang (PGM)Functional DesignJim ForbesOpen house #2
Submit comments
on line till Dec 29
2016-Nov-23: Open House #2 held

2016-Dec-10: Drawings posted to City website
2 Alternative plans are on pages 5-8

Notes updated in the Project folder under 2-Notes
City Link
AWG Project Folder
Central
71
C2016-09Viewmount Area Traffic Management StudyThis review is to develop and evaluate design concepts which aim to improve conditions for all road users along the existing Viewmount corridor.CyclingComponentSharrows are planned. It's signed for 40kmh and, according to plans, there is not enough room between the curbs for Advisory lanes, let alone bike lanes. This is a major transit route, and the purpose of this project is to reduce cut through arterial traffic between Merivale and Meadowlands.Ward 8Justin Swan
Functional design
Working draft available
Jim Forbes
2016-Sep-14: Gareth attended PCG meeting.
2016-Oct-26: Jim attended the Public meeting for the draft plan

2016-Nov-16: Justin said the next step will be to procure funding.
City Link
AWG Project Folder
Central
72
C2016-10Multi-Use Pathway (Michael St. to St-Laurent)P2-11, PTIF59CyclingComponentPART OF P2-11 (Rest connects Cyrville to Aviation Pkwy, but that part is not in LRT corridor)
2016-Aug-23: Included as PTIF Project
Ward 11Paul ClarkePreliminaryAssign a prime
AWG Project Folder
East
73
C2016-11Booth Street Bike Track from Sir John A MacDonald to AlbertPermanent solution for cycling in Booth ROW, especially on bridge, in time for 2018 LRT openingCyclingNEW - Due to oversight
2016-Aug-23: Included as PTIF Project
Ward 14Meghan WhiteheadPreliminaryEric Darwin 
AWG Project Folder
Central
74
C2016-12Kanata LRT Extension - Environmental AssessmentThis Planning and EA Study will define a corridor for the future expansion of the City's LRT network to Kanata. Extending LRT to Kanata is identified in the Ultimate Network in the City's 2013 Transportation Master Plan (TMP).CyclingComponent2016-Aug-23: Included as PTIF Project
Ward 4, Ward 7 +others
PreliminaryRoger FarleyDiscuss with TACK on Nov 15City Link
AWG Project Folder
West
75
C2016-13Chapman Mills transit corridor - Beatrice to LongfieldsCyclingComponentCycle tracks included
2016-Aug-23: Included as PTIF Project
Ward 22 Glouc-S.NepeanPreliminaryAssign a prime2016-Oct-19: Paul C took photos of existing conditions - Beatrice to Mancini-Leamington.
AWG Project Folder
East
76
C2016-14Rideau River Crossing - Confederation Heights to Carleton UniversityRideau River Crossing - Confederation Heights to Carleton University - pedestrian/cyclingCyclingComponentNEW / NOT IN OCP2013
2016-Aug-23: Included as PTIF Project. It is anticipated construction could extend over the course of the 2017 and 2018 construction seasons to bring to completion.
Ward 16 River, Ward 17 CapitalSam RobertsFunctional DesignAlex Wilcox
AWG Project Folder
East
77
C2016-15Heron Road (Data Centre/Heron Station to Bank), EB and WB bike tracksP1-19CyclingPart of P1-19 (Remainder extends east of Bank to Alta Vista)
2016-Aug-23: Included as PTIF Project (functional design portion only)
Ward 17Adam HortopFunctional DesignTrevor Haché 2016-Oct-05: See note for C2016-16
AWG Project Folder
East
78
C2016-16Heron Rd (Colbert Pathway to east of Jefferson)-EB bike tracks onlyCyclingNEW / NOT IN OCP2013
2016-Aug-23: Included as PTIF Project. PTIF covers both design and construction.
Ward 18Adam Hortop, Paul ClarkeFunctional DesignTrevor Haché 2016-Oct-05: Adam Hortop answered an e-mail by Trevor Hache about scheduling. Details in Doc file.
AWG Project Folder
East
79
C2016-17Richmond Rd - south side sidewalk reconstruction around Croydon for cycle trackPer Robin Bennett, runs from Croydon eastward to Assaly. Not extending to Richmond Rd's link with NCC Pinecrest Creek MUP.CyclingComponentNEW / NOT IN OCP2013 (Robin Bennett already working on it)
2016-Aug-23: Included as PTIF Project
Ward 7Robin Bennett, Max RossFunctional DesignChristine Binne
AWG Project Folder
Central
80
C2016-18Kanata North cycle link (Carling at March Rd)Design and Construction; This project completes a missing link approximately 200m in length along existing cycling facilities near an intersection of two major arterial roads. The cycling link will provide improved cycling commuter access to the Kanata North employment area. This project improves cycling connectivity from Eagleson Rd. and Teron Transitway stations to the Kanata North employment node. This compliments the existing peak period transit service.P1-27ACyclingPossibly P1-27A. INQUIRE
2016-Aug-23: Included as PTIF Project. This is a companion project with Kanata North cycle link (Herzberg at March Rd.)
Ward 4Robin BennettPreliminaryRoger FarleyDiscuss with TACK on Nov 15http://ottawa.ca/2/en/city-hall/public-engagement/carling-avenue-cycling-improvements
AWG Project Folder
West
81
C2016-19Kanata North cycle link (Herzberg at March Rd)Design and Construction; This project completes a missing link ( approximately 260m in length) along existing cycling facilities near an intersection of two major arterial roads. The cycling link will provide improved cycling commuter access to the Kanata North employment area. This project improves cycling connectivity from Eagleson Rd. and Teron Transitway stations to the Kanata North employment node. P2-14CyclingPossibly P2-14. INQUIRE
2016-Aug-23: Included as PTIF Project. This is a companion project with Kanata North cycle link (Carling at March Rd.).
Ward 4Robin BennettPreliminaryAlex deVriesDiscuss with TACK on Nov 15Sent comments on May 24, 2017.http://ottawa.ca/2/en/city-hall/public-engagement/herzberg-road-improvements-for-cyclists-and-pedestrians
AWG Project Folder
West
82
C2016-20Hunt Club Cycling Links (Riverside to Paul Benoit)P2-6BCyclingPart of P2-6B (Remainder extends east to Billy Bishop Private)
2016-Aug-23: Included as PTIF Project
Ward 16Zlatko KrstulicPreliminaryAssign a prime
AWG Project Folder
South
83
C2016-21McArthur Avenue Bike LaneDesign and Construction; This project will add bike lanes along both sides of McArthur Avenue, and will feature sections of parking-protected on-road bike lanes. The limits of this project are between 575 McArthur (St. Laurent Blvd.) and 333 North River (North River Road).Cycling2016-Aug-23: Included as PTIF ProjectWard 12, Ward 13 (Both TBC)Eric OuimetPreliminaryStephen Highham2016-Oct-18: Guy Grenier to make inquiries.
AWG Project Folder
East
84
C2016-22Cardinal Creek Park 18A MUPThis pathway will connect the existing Park Cardinal Creek Community Park (18B) to the planned Valin Park (18A)CyclingINQUIRE
2016-Aug-23: Included as PTIF Project
Ward 1Ingrid Coney Tel.: 613-580-2424, ext. 13226 Email: ingrid.coney@ottawa.caPreliminaryGilbert BouffardSince no MUP will be in the park itself, I do not believe follow are required on this file.
Once the Frank Kenny Extension is built, there will be a MUP standard pathway along the entire frontage of the park.
http://ottawa.ca/en/city-hall/public-engagement/parks-and-recreation-public-consultations#cardinal-creek-park-18a AWG Project FolderEast
85
C2016-23Manotick MUP Manotick - MUP between Main St and River rd and addition of MUP to two bridgesCC10CyclingComponentNEW- Seems to be a westward extension of CC10
2016-Aug-23: Included as PTIF Project
Ward 20, Ward 21PreliminaryAssign a prime2016-Oct-18: Gareth Davies to talk to Community Association President.
AWG Project Folder
South
86
C2016-24Elgin St/Hawthorne Ave Functional Design StudyLooking at reconfiguration of Elgin St (Laurier to QED) and Hawthorne (Pretoria Bridge to Main)CyclingComponentSeveral of our members attended Public Design Workshop on 2016-Jun-28Ward 14, Ward 17Vanessa Black (PGM) Ron Clarke (Parsons)Functional DesignErinn Cunningham 2016-Oct-02: Attended Working Group meetinghttp://ottawa.ca/en/city-hall/public-consultations/elgin-street-and-hawthorne-avenue-functional-design-study
AWG Project Folder
Central
87
C2016-25National Arts Centre architectural rejuvenationBuilding changes affect canal west MUP during and after constructionWard 14, NCCAndrew Wisniowski (proj mgr)Functional DesignHans MoorFind out when meeting promised for this fall re pathway is scheduled.AWG met with Wisniowski at its May 2016 meeting.
AWG Project Folder
Central
88
C2016-26Somerset East bike pavement markingsIncrease cyclist safety at King Edward Ave intersection with painted lanes and bike boxesCyclingAppears to be initiative of Counc Fleury. Highly accelerated project!Ward 12Shawn McGuirePost-Build ReviewGareth Davies
AWG Project Folder
East
89
C2016-27Dynes Road bike lanes Addition of on-street bike lanes on both sides of Dynes Rd following reconstruction betw'n Fisher Ave & Prince of Wales; protected cycle track crossings to be added at Dynes & P of W crossings CyclingComponentIn planning as of 2016-Sep; PIS planned for March 30, 2017 6:30 to 8:30 pm
St. Pius X H.S. (1481 Fisher Ave). Cycling lanes were not a big issue. Some people concerned about parking going from 70 to 19. However, were never counted. Dutch style intersections planned for Dynes on both ends: Fisher and Prince of Wales. Some concern about angle of bike lanes at Fisher. Work starts summer 2017, to be finished in end of 2019.
Ward 16Franco Bonanno (proj mgr)PreliminaryKaren Gordonhttp://ottawa.ca/en/city-hall/planning-and-development/transforming-ottawa/dynes-road-and-prince-wales-drive
AWG Project Folder
East
90
C2016-28Bank Street Functional Design Study - Riverside to LedburyCycle tracks/lanes being consideredCyclingComponentPCG Meeting #1 held 2016-Jun-28. PCG Meeting #2 held 2016-Nov-03.Ward 16, Ward 17, Ward 18Ann Selfe, Patrick Hill (MMM)Functional DesignAlex WilcoxWaiting for report to Transportation CommitteeMet with consultants after public meeting to discuss cycling facilities in the corridor. Recieved response February 14th.
http://ottawa.ca/en/city-hall/public-consultations/transportation/bank-street-renewal-between-riverside-drive-north-and
AWG Project Folder
East
91
C2016-29Ogilvie Road MUPMUP believed to be going on south side of road between Blair and Montreal RdCC4CyclingComponentIn planning as of 2016-SepWard 11Meghan WhiteheadFunctional DesignPeter FawcettFind a prime and find out which planner is working on it. Guy Grenier is a candidate if Peter doesn't want to be prime.
AWG Project Folder
East
92
C2016-30
Spencer Street Rehabilitation
Integrated road/sewer/water project. We and Councillor Leiper successfully lobbied for painted bike lanesCyclingComponentOn-street parking was to be eliminated in favour of the new bike lanes.Ward 15Tara BlasioliConstructionRandy Kemp
Paul Clarke
Monitor detours and finished product
Attend 2017-Apr-25 Meeting.
2016-Oct-11: E-mail to Tara B about setting up cycling detour.
2017-Apr-25: Community Meeting
City page
AWG Project Folder
Central
93
C2016-31Rochester Field PathwayThis cycling connection is a joint approval between the NCC and the City, and the intent of the approval is to connect the Pinecrest Creek Pathway at Rochester Field with Richmond Road. The City included this connection (that goes through a private parking lot) in the site plan as part of the approval for the development of 485 Richmond Road. CyclingCfSC was not aware of this project until after construction was started. This was likely approved in 2012 when the development application was approved.
This may have been development application D07-12-12-0131. No information is available on Service Ottawa but there are some stale links on ottwatch.ca.
Ward 15Erin O’ConnellConstructionRob McCraeMonitor2016-Sep-19: Contacted Jeff Leiper's office to inquire about project.
2016-Sep-19: Contacted NCC to inquire about project manager.
2016-Sep-29: Received response from Tom Pechloff in Leiper's office.
2016-Sep-30:Received response from NCC.
2016-Oct-04:Contacted Andrew McCreight for more info on development application. Received sections of Site Plan Agreement related to cycling and a site plan with part of the route.
AWG Project Folder
Central
94
C2016-32Montreal Road Transit Priority StudyStudy to examine improving bus travel times through the Montreal corridor between St Laurent Blvd and North River RoadCyclingComponentProtected intersection proposed at Vanier Pkwy and N. River intersectionsWard 12, Ward 13Angela Taylor (City), Shawn Rathwell (Dillon Consulting)Functional DesignFeliks Welfeld2016-Jun-13: Attended consultation group meeting
2016-Oct-18: Feliks took over from Sarah Partridge as Prime.
AWG Project Folder
East
95
C2016-33Avalon South PathwayNorth-south MUP between Trans-Orleans Pathway/Melanson and Brian Coburn BoulevardCyclingComponentProposing use of P-gates where MUP meets Aquaview Dr and Brian Coburn BlvdWard 19Ingrid ConeyFunctional DesignGilbert Bouffard2016-Nov-06: Proposed route was viewed in on-site visit. 2016-11-10 Gilbert recieved information from Ms Coney. see note file.City page
AWG Project Folder
East
96
C2016-34Trans Orleans Pathway Alignment ModificationThe proposed plan is roughly 6.5K long and will connect Trim Rd. at Millennium Park ( in the east) to Navan Rd. (in the west) using the corridor reserved for the Cumberland Transitway. That Transitway segment is not planned to be built until after 2031.CC2CyclingComponent2016-Aug-23: Included as PTIF Project.Ward 19Meghan WhiteheadFunctional DesignGilbert Bouffard
John Black
Online Consultation: February 23 to March 9, 2017, Gilbert attended open house, comments are required no later then March 9. March 3, 2017 comments sent to Meghan Whitehead with CC to Stephen Blais. May 5, 2017 Meghan Whitehead advised that most of the comments will be answerd on the website soon.http://ottawa.ca/en/search?searchfield=Trans+Orleans+Pathway&form_build_id=form-njcLqLfuRkvdTHuaboNjhrY0TZF39MW1VTUNaEppz7I&form_id=ottawa_search_search_form
AWG Project Folder
East
97
C2016-35Prince of Wales widening near Hunt ClubPoW northbound is being widened, so will include new bike lanes (separated from the roadway by a rumble strip)CyclingComponentNo work is being done southbound, so there are no new facilities. City said the facilities were “very cyclable”. Concern is that southbound cyclists are being ignored.Ward 9Frank McKinneyPreliminaryAlex deVries
AWG Project Folder
South
98
C2016-36Cedarview RepavingCedarview is to be rebuilt without paved shouldersCfSCThe concern reported by a cyclist is that no cycling facilities are included in the widening of Cedarview. This is not on the OCP. Functional design only at this point. Detailed design in 2016/2017. There are open questions as of June 15, 2015.Ward 3 (TBC)Councillor Harder, Louis Quigley, Carol Valpy, Susan Douglas, Stephen Forestell, Zlatko KrstulicPreliminaryInfo gathering by AWG.
Assign a prime.
AWG Project Folder
West
99
C2016-37Bicycle shelters at Transitway stations Bicycle shelters at Transitway stations to encourage multimodal travelCycling2016-Aug-23: Included as PTIF ProjectOC TranspoPreliminaryAssign a prime
AWG Project Folder
Citywide
100
C2016-38Enclosed bicycle parking areas at Transitway stationsEnclosed bicycle parking areas at Transitway stations to encourage multimodal travelCycling2016-Aug-23: Included as PTIF ProjectOC TranspoPreliminaryAssign a prime
AWG Project Folder
Citywide