Project Tracking Sheet
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
View only
 
 
ABCDEFGHIJKLMNOPQRST
1
IDNameDescriptionRefLocationDate of next consultationTypeNotesRegion (councillor's email)StaffStaffNotesStatusPrimeToDoActivityReviewProjectLinkDocumentationFeaturedArea
2
C2011-01Adàwe CrossingCritical crosstown link for pedestrians and cyclists between Somerset E and Donald Sts.45.426328, -75.670168CyclingComponentFirst Public Open House 2011-Jan-13. Opened on December 4, 2015.Ward 12 (mathieu.fleury@ottawa.ca),
Ward 13 (tobi.nussbaum@ottawa.ca)
Post-Build ReviewHeather ShearerMonitoring operations.
Submitted comments at consultation. Spring 2016 feedback about pending bollard installation.
AWG Project Folder
East
3
C2011-02Crossride at Presland Road and Vanier ParkwayIntersection change to give road access to a new development on east side of Vanier Pkwy, while keeping Presland dead-ended to traffic on both sides of the parkway. Crossride requested by Overbrook Community Association.45.422669, -75.661248CyclingComponentCompleted 2015.Ward 13 (tobi.nussbaum@ottawa.ca)Post-Build ReviewAssign a prime2015-Dec-24: Photos taken. No paint on crossride.
Need to review operation (e.g. signal response, ability to ride legally to/through crossing)
AWG Project Folder
East
4
C2012-01Baseline Road Rapid Transit CorridorBaseline Road Rapid Transit Corridor (Bayshore Station to Billings Bridge Station) Planning and Environmental Assessment Study45.3676173,-75.725733CyclingComponentProject suspended in 2014.
Reopened after PTIF (Public Transit Infrastructure Fund) monies were allocated in 23-Aug-2016.
Supposed to include cycling facilities (raised tracks). As of July 19, 2017, the final Environmental Project Report (EPR) is available
Ward 7 (mark.taylor@ottawa.ca),
Ward 8 (rick.chiarelli@ottawa.ca),
Ward 9 (keith.egli@ottawa.ca),
Ward 16 (riley.brockington@ottawa.ca),
Ward 17 (david.chernushenko@ottawa.ca)
Jabbar SiddiqueFunctional DesignHeather Shearer - Hans MoorAwait response to 2016-Oct-24 letterWe are on PCG. Heather S attended PCG mtg #5 on 2016-Oct-03. Roll plans seen revealed issue of how signal phases will be programmed at intersections where the busway has to make a turn. 2016-Oct-24: Letter of feedback sent to Siddique. Five councillors cc:ed on e-mail.http://ottawa.ca/en/city-hall/public-consultations/baseline-road-rapid-transit-corridor-bayshore-station-billings-bridge https://parsons.sharefile.com/d-s8444f0ac5f2424f9   https://parsons.sharefile.com/d-s605c0a37ca04dfb8
AWG Project Folder
Central
5
C2013-01Main Street Complete StreetComplete rebuild (road/sewer/water), with replaced sidewalks and new cycle tracks. From Hawthorne Ave to Rideau River. [ 45.399890, -75.671880 ], [ 45.412634, -75.680118 ]CyclingComponentSection Lees to Clegg opened Aug 29/16 to traffic both ways but still work going on for landscaping etc.
Cycle tracks almost finished as of Aug 30/16 Main Street opened June 2017. Some details to work out
Ward 17 (david.chernushenko@ottawa.ca)Josée Vallée (proj mgr)ConstructionBrian McPherson, Paul Clarke, Don FuglerCheck finished facility for problems2013-Jul-??: Spoke in favour at TRC.
Monitoring for proper accommodation in detours.
AWG Project Folder
East
6
C2013-02McIlraith Bridge RehabilitationStructural repairs to bridge built 1964. Better lighting and cycling lanes to be added45.416930, -75.663173CyclingComponentConstruction to continue until summer 2017. Road work done by end 2016. Summer 2016 update: signs added to tell motorists not to honk at cyclists for taking the lane!Ward 17 (david.chernushenko@ottawa.ca),
Ward 18 (jean.cloutier@ottawa.ca)
ConstructionBrian McPherson2013-Jun-??: Members questioned why no cycle tracks at June 2013 Open House
AWG Project Folder
East
7
C2013-03Upgrade to Drainage on John Sutherland DriveInstallation of storm sewer infrastructure along the main road through Queensway Carleton Hospital campus. Repair adjacent section of Greenbelt Pathway in the process.45.336964, -75.807092CfSCE-mail from hospital Jan 15/16 to say the asphalt part of the path will be reinstated in spring 2016. In parallel, the city is planning a Community Connections project (CC12) that may supersede that promise, delaying the asphalt reinstatement.
Construction began Aug 31/15. Completed sidewalk only November 2015. 2016-Nov 18: Multi-use Pathway (MUP) finally reinstated (asphalt relinked to crossing of Richmond at John Sutherland).
Ward 8 (rick.chiarelli@ottawa.ca)ConstructionPaul Clarke2013, 2014: Sent messages to the hospital admin and to Councillor Chiarelli to fix drainage and resulting path degradation.
AWG Project Folder
Central
8
C2013-04Rideau River Western Pathway - Belmont Ave to University of OttawaMulti-use Pathway (MUP) along river.P1-945.395920, -75.674231; 45.415656, -75.665512CyclingComponentProject to be completed in 2018. The new pathway will include the following features:
3.0 m wide paved pathway with yellow centreline and appropriate signage in Brantwood Park, Greystone Village, Springhurst Park, University of Ottawa Lees Campus (note: the pathway through Greystone Village will be constructed by the developer via their Site Plan Agreement with the City of Ottawa, in 2017 in conjunction with the remaining pathway sections)
Accessible ramping and switchbacks to address steep grades north of Clegg Street and under the Transitway/future LRT up to Lees Campus
Pathway intersection with new LRT Pathway on east side of Confederation Line
Links to the existing pathway along the western shoreline of Rideau River that extends to Strathcona Park in Sandy Hill
Ward 17 (david.chernushenko@ottawa.ca)Robin Bennett, Vipin BansalConstructionBrian McPhersonObtain detailed design plans to reviewhttp://ottawa.ca/en/city-hall/planning-and-development/construction-and-infrastructure-projects/bridges-and-pathways/under-way/rideau-river-western-pathway
AWG Project Folder
East
9
C2013-04ARideau River Pathway - lighting and link through parkWhere? CyclingComponent
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
PreliminaryAssign a prime
AWG Project Folder
East
10
C2014-01Albert St. Civic WorksConstruction of storage tunnel for sewage overflows and building of the Pimisi station have closed the Albert St Multi-use Pathway (MUP), Preston to Empress.CyclingComponentWe received detour map in January. Detour moved cyclists up to Wellington/SJAMP. Multi-use Pathway (MUP) reopened in late June Ward 14 (catherine.mckenney.ca)Damon Berlin
Rail Implementation Office
ClosedMichael Powell, Eric DarwinPart affecting cycling appears to be completed.Announcement
AWG Project Folder
Central
11
C2014-02Reconfiguration of Multi-use Pathway (MUP) junction at Carling crossrideCrossride was built in 2014. Since its opening, the city was considering reconfiguring the north side to reduce interference between people waiting at signal and those passing through45.396963, -75.709026FixThe gap left for westbound cyclists turning right requires going through a 90cm gap between the signal box and the fence. Situation was being re-evaluated in 2015. Off-ramp thing is currently blocked with markers.
Latest proposal was to move the signal control box. Redesigning signal installation to comply with AODA and OTM Book 12. On hold due to spending freeze.
Ward 7 (mark.taylor@ottawa.ca)Jeff Doxtater
Peter Grajcar
Functional DesignPaul ClarkeAdd design drawing to Google Docs. Paul has a copy.2013 Summer: Initial engagement in summer 2013, prior to build.
2014 Spring: Conflicts highlighted after spring 2014 opening.
AWG Project Folder
Central
12
C2014-03O'Connor Bikeway Phase 1A north/south bikeway from Laurier to StrathconaP1-1345.419353, -75.697022; 45.408583, -75.687731CyclingMay 2015: Approved by council. Laurier to Strathcona to have segregated bi-directional lanes on the east side. Glebe parts to have lanes to Glebe, then mixed use.
2016-Jun-22: Construction began. 2016-Oct-25: Official opening
Ward 14 (catherine.mckenney@ottawa.ca),
Ward 17 (david.chernushenko@ottawa.ca)
Robert Grimwood
Heidi Cousineau
Kate Whitfield
Kate Whitfield is project administratorPost-Build ReviewAlex deVriesMonitor usage. Address causes of collisions in first few weeks.Major e-mailing campaign spearheaded.
Many of us attended Public Info Session approx Mar-Apr 2016. Etienne Grall is CfSC liaison with city for the bikeway ambassadors effort.
City Page
AWG Project Folder
Central
13
C2014-03AO'Connor Bikeway Phase 2A north/south bikeway from Wellington to Laurier. Post LRT project.P1-1345.422629, -75.699833; 45.419353, -75.697022CyclingMay 2015: Approved by council.
Ward 14 (catherine.mckenney@ottawa.ca)Robert Grimwood,TBDFunctional DesignAlex deVriesObtain plans for reviewCity Page
AWG Project Folder
Central
14
C2014-04O-train Multi-use Pathway (MUP) phase 2The O-train pathway extension from Young to Carling.45.402111, -75.712137; 45.397082, -75.709101CyclingComponentCommitted to be built by the end of 2015. Plan changed at open house to have Multi-use Pathway (MUP) paved over the entire length. (Additional funds were found.)
2016-Sep-29: Monitor for new curb cut at Hickory Bridge and hopefully bollard changes promised by Robin Bennett.
2016-Oct-11: Connections to be made to Pamilla, Norman, Aberdeen and George Streets.
Ward 14 (catherine.mckenney@ottawa.ca),
Ward 15 (jeff.leiper@ottawa.ca),
Ward 17 (david.chernushenko@ottawa.ca)
Max Ross, Robin BennettConstructionEric DarwinMonitorParticipated on the PAC.
Lobbied for paving the full length.
2015-Nov-??: Paving done.
2015-Dec-??: Carling signals operational mid-December
City Link
AWG Project Folder
Central
15
C2014-05Pimisi ConnectivityMulti-use pathway links to and through Pimisi LRT station on the Confederation Line (at Booth Street).45.412964, -75.712377CyclingAWG determined there was a lack of connections between Pimisi's Multi-use Pathways (MUP) and Booth Street to the north of the LRT. The various Multi-use Pathway (MUP) segments are under jurisdiction of several separate deptsWard 14 (catherine.mckenney@ottawa.ca)Rail Implementation OfficeUnknownEric DarwinEric to send input to RIO.2015-Apr-21: AWG reviewed the proposed Multi-use Pathway (MUP) connections map.
AWG Project Folder
Central
16
C2014-06Orleans Watermain Link (OWL)Work done on Coventry from Lola to St Laurent. Mixture of bicycle facilities implemented (Multi-use Pathway (MUP), tracks, lanes). Includes P1-2P1-245.421170, -75.650897; 45.424080, -75.637496CyclingComponentCompleted 2016-2017.Ward 13 (tobi.nussbaum@ottawa.ca)Bruce Kenny, , Derek Lougher-Goodey, Robert Grimwood. Also Patrick Chamney (Robinson Consultants)Post-Build ReviewPaul ClarkeFinal ride review2014-Sep-16: AWG reviewed the geometry drawings. PC had discussion with Rob Grimwood to fill in missing info.
AWG Project Folder
East
17
C2014-07East-west Bikeway (Laurier/Bay to Albert)This is a connection to get from the Albert St. Multi-use Pathway (MUP) to Laurier. AKA "Nannygoat Hill" path.45.415603, -75.708358; 45.415564, -75.709448CyclingWard 14 (catherine.mckenney@ottawa.ca)Zlatko Krstulic, Mark McMillanPost-Build ReviewPaul Clarke2015-Jun-01: Sent letter to McMillan. City may think it is complete but still no crossride paint on Bronson/Slater intersection
AWG Project Folder
Central
18
C2014-08Crossing at Clegg and Colonel ByFormerly unsignalized T-intersection received signals for cyclists, pedestrians, and cars exiting Clegg. 45.404677, -75.680240CyclingComponentAWG reviewed operation in first few weeks. Concerns about Clegg traffic turning right on red--blocking both the crossride and crosswalk. Also visibility concerns, missing signs, etc. Sept 2016 - now that Main north of Clegg is open, has traffic pattern changed at this intersection?NCC,
Ward 17 (david.chernushenko@ottawa.ca)
We are trying to find out who from city and NCCPost-Build ReviewBrian McPherson, Paul ClarkeMonitoring for proper accommodation in detours.2015-Jun-22: Reviewed situation at AWG. E-mailed NCC to learn who will receive input. Operational as of May 22/15. Safety concerns for cyclists, see Notes.
AWG Project Folder
Central
19
C2014-09Alta Vista Hospital LinkNew road to connect hospital complex to Riverside Dr. Includes P1-1.P1-1CyclingComponentWard 17 (david.chernushenko@ottawa.ca),
Ward 18 (jean.cloutier@ottawa.ca)
Bruce Kenny (city), Darrin Alberty (contractor)ConstructionPeter Fawcett
AWG Project Folder
East
20
C2014-10Updates to Chaudiere Crossing in connection to Zibi development.45.419560, -75.717246CyclingComponentExpected that Zibi will begin implementing their plan during Phase One ConstructionPreliminaryBrett Hodnett 2013-Nov-28: Hans and Paul held meeting with Jeff Westeinde of Windmill Developments.
AWG Project Folder
Central
21
C2015-01Airport Parkway/Lester Road WideningWidening the airport parkway with potential addition of Multi-use Pathway (MUP) in corridor.45.373558, -75.683717CyclingComponentMulti-use Pathway (MUP) is planned for west side of corridor from Brookfield to Uplands. On-road cycling being discouraged--we question this. Also, MUP has to cross two busy roads (Walkley, Hunt Club) at grade, which will mean delays for cycle commuting. Study period completed Sept 9/16.Ward 10 (diane.deans@ottawa.ca) (diane.deans@ottawa.ca)
Ward 16 (riley.brockington@ottawa.ca)
Ward 17 (david.chernushenko@ottawa.ca)
Frank McKinneyFrank McKinney took over from Colin Simpson. Also Ron Clarke at Parsons.Environmental AssessmentGareth Davies, Paul ClarkeWe are on the PCG.
2015-Mar-23: Letter sent to Simpson.
2015-Jun-22: E-mail to Ron Clarke.
2015-Nov-04: Letter sent to McKinney.
2016-Jan-12: McKinney feedback rec'd.
City Page
AWG Project Folder
South
22
C2015-02Trillium Line (south) LRT ExtensionStage 2 LRT to run train down to Bowesville.45.350713, -75.653835CyclingComponentThere will be a Multi-use Pathway (MUP) bridge built over Hunt Club Road, just to the east of the railway bridge. The MUP is expected to extend south as far as Lester Road, always staying on the east side of the LRT.Ward 10 (diane.deans@ottawa.ca),
Ward 16 (riley.brockington@ottawa.ca),
Ward 17 (david.chernushenko@ottawa.ca),
Ward 20 (george.darouze@ottawa.ca),
Ward 22 (michael.qaqish@ottawa.ca)
Colin SimpsonEnvironmental AssessmentGareth DaviesWe are on the PCG.
Letter sent to Simpson
AWG Project Folder
Central
23
C2015-03Coventry Pedestrian and Cycling BridgeOfficially named Max Keeping Bridge. This bridge crosses the 417 Highway just east of the Vanier Parkway.45.418429, -75.652876CyclingComponentBridge opened in February, 2015. Not sure why there’s no Multi-use Pathway (MUP) connection to train station. Formal connection to Coventry on east side of ballpark is Community Connection #9 (CC9) in Strategic Initiatives.Ward 13 (tobi.nussbaum@ottawa.ca),
Ward 18 (jean.cloutier@ottawa.ca)
Post-Build ReviewPaul ClarkeMonitor usage. Push for cyclable link to Tremblay LRT and VIA stationsBridge is completed; connections to bridge at south end for cycling are lacking still, mainly due to LRT construction.
AWG Project Folder
East
24
C2015-04Crossride on Bronson near Rideau CanalA new crossride so cyclists can get from the Glebe to/from Carleton University.45.395728, -75.696577CyclingComponentThis is Phase II of safety improvements in this area. Ward 17 (david.chernushenko@ottawa.ca)Post-Build ReviewAlex deVries
Alex Wilcox
Monitor. Push for crossride markings.2015-Oct-04: Photos taken by Paul Clarke during construction.
2015-Nov-18: E-mail to Robin Bennett about signage problems.
2016-Dec-16: Christie Cole supplied photos of ~95% completion. 2016-Oct-18: Alex W reports that green crossride paint has been applied.
Mostly finished as of Dec 2015. Construction began late Sept 2015. Crossride still not painted as of summer 2016
AWG Project Folder
Central
25
C2015-05Chapman Mills Dr. Extension (Longfields to Strandherd)Westward extension of arterial road in Barrhaven, from Longfields to Strandherd (with study on Bus Rapid Transit corridor from Greenbank to Borrisokane)CyclingComponentRoad extension is scheduled in the Transportation Master Plan (TMP) for 2020-2025 period, SUBJECT TO AVAILABLE FUNDING. Bus corridor down the middle is not until after 2031. Latest Public Open House was 2016-Mar-21. Notice of Environmental Assessment study completion issued 2016-Nov-10.Ward 3 (jan.harder@ottawa.ca),
Ward 22 (michael.qaqish@ottawa.ca) (michael.qaqish@ottawa.ca)
Jabbar SiddiqueEnvironmental AssessmentHeather ShearerCheck ESR. Public review ends approx 2016-Dec-17We are on the PCG.City page
AWG Project Folder
South
26
C2015-06Ottawa Queensway (417) mid-town bridge replacementsMTO plans to rehabilitate/replace the bridges at 11 crossings of streets, between Holland and O'ConnorCyclingComponentWe wrote a letter to the Ministry of Transportation (MTO) on April 21, 2015, and received response right away.Ministry of Transportation (MTO), Ward 14 (catherine.mckenney@ottawa.ca), Ward 15 (jeff.leiper@ottawa.ca), Ward 17 (david.chernushenko@ottawa.ca)Don Rowat (Ministry of Transportation (MTO)),
Steve Taylor (consultant, Bytown Engineering)
Functional DesignPaul ClarkeMonitoring2015-Apr-21: Letter sent to Ministry of Transportation (MTO).
Watching for next public engagement.
AWG Project Folder
Central
27
C2015-06AMulti-use Pathway (MUP) on the west side of the O-Train rail linePreserving future chance of a pathway.45.402619, -75.712864CfSCThe 417 bridge replacement was to have a narrower span across the O-train pathway, removing opportunity for a future path. In May 2015, Ministry of Transportation (Ministry of Transportation (MTO)) committed to preserve some space. No pathway is planned yet.
CfSC lobby has concluded. Path paved by highrise owners from Hickory up to Ev Tremblay Park, August 2016, as per devel agreement, I believe.
Ministry of Transportation (MTO),
Ward 15 (jeff.leiper@ottawa.ca)
MPP Yasir Naqvi
Councillor Leiper
ClosedEric Darwin,
Paul Clarke
MonitorWe wrote to Ministry of Transportation (MTO), councillors, and city staff
AWG Project Folder
Central
28
C2015-06BHighway 417 CPR/O-Train Bridge Replacement One of many Queensway Midtown Bridges being replaced.ImpactDesign Study and Environmental Assessment commencing 2016-Nov-16. A PIC is expected to be held Spring 2017.Peter Freure (Ministry of Transportation (MTO)), Lincoln MacDonald (MMM Group)Environmental AssessmentEric DarwinAssign a primehttp://www.highway417cpr-otrainbridges.comCentral
29
C2015-07Sir John A Macdonald Parkway ReconfigurationPart of the SJAMP west of Dominion is to be rebuilt as part of Western LRT 100-day solution, and will involve changes to the pathways.CyclingComponentBy shifting the parkway south, this will increase parkspace and there’s an opportunity to make changes to the pathway (eg. widen it, move it around flood areas, 'twin' it). Still at a conceptual level.NCCTBD. Maybe Mike Muir.Functional DesignPaul Clarke2015-May-05: Participated in workshop. Written submissions from several members.
AWG Project Folder
Central
30
C2015-08LRT Extension (west)Part of "Stage2" LRT, from Tunney's Pasture to Baseline and BayshoreCyclingComponentEnvironmental Project Report (EPR) released June 2016 for start of 120-day study period.Ward 7 (mark.taylor@ottawa.ca),
Ward 8 (rick.chiarelli@ottawa.ca),
Ward 15 (jeff.leiper@ottawa.ca)
Nelson EdwardsEnvironmental AssessmentHeather Shearer, Paul ClarkeMonitor2016-Sep-12: CfSC commentary sent to N Edwards.
AWG Project Folder
West
31
C2015-09LRT Extension (east)Part of "Stage2" LRT, from Blair out to approx Trim RdCyclingComponentWard 1,
Ward 2 (jody.mitic@ottawa.ca),
Ward 11 (tim.tierney@ottawa.ca)
Angela TaylorEnvironmental AssessmentPeter Fawcett
AWG Project Folder
East
32
C2015-10Watts Creek Pathway Connection, Corkstown east of MoodieConnection between two parts of the Watts Creek Pathway as it crosses Moodie should be rebuilt.45.343044, -75.842150CfSCThe cycling facilities should be better once Corkstown Rd is realigned during the build of the Western Transitway Extension (WTE) from Bayshore to Moodie. Plans shown at open house on Dec 10/15 still showed deficienciesWard 7 (mark.taylor@ottawa.ca)Councillor Taylor PreliminaryPaul Clarke, Gareth Davies, Alex deVriesAttend station connections meeting on 2016-Oct-062014-Oct: E-mailed Taylor.
2015-Jun-04: Met with Taylor.
2015-Jun-21: Wrote to WTE staff.
2015-Jun-30: Spoke at TRC meeting. 2016-Sep-12: Met with Taylor and city staff on-site and sent follow-up e-mail to summarize short-term improvements.
AWG Project Folder
West
33
C2015-11Rockcliffe Driveway Cycling LanesCouncillor Nussbaum requested NCC put bike lane on this one-way scenic driveway45.402346, -75.712741CyclingAWG members report that painting of lane has been done.NCC,
Ward 13 (tobi.nussbaum@ottawa.ca)
Councillor Nussbaum, NCC Director of Urban Lands and Transportation Marc CorriveauClosedPaul ClarkeGave initial reaction of concern due to conflicts with parking vehicles.AWG members report that painting of lane has been done.
AWG Project Folder
East
34
C2015-12St Laurent Blvd Cycling LanesBike lanes (painted) between Hemlock Street and Montreal Road45.449748, -75.651779; 45.441182, -75.647048CyclingCompleted 2015.Ward 13 (tobi.nussbaum@ottawa.ca)Zlatko Krstulic, Andrew EvraireClosedPeter Fawcett, Olivier Morrissey
AWG Project Folder
East
35
C2015-13Beechwood Avenue Transportation CorridorRelayout of Beechwood so that cycle route does not have to detour onto Barette St for three blocks.45.438487, -75.677732CyclingComponentPublic consultation on June 23/15. Summer 2016: bike lanes painted from Charlevoix to Hemlock at St. Laurent; some blue flexi-posts installed on Hemlock. Curb reconstruction and some cycle track from Vanier Parkway to Charlevoix to be completed 2017.Ward 12 (mathieu.fleury@ottawa.ca),
Ward 13 (tobi.nussbaum@ottawa.ca)
Zlatko KrstulicConstructionPeter Fawcett, Sarah PartridgeSubmitted comments at consultation. 2016-Sep-20: Gareth e-mailed Fleury's office about room for improvement about the bike lanes
AWG Project Folder
East
36
C2015-14Cyrville Road Cycling LanesUpgrade facilities, Meadowbrook to OgilvieP1-2245.417696, -75.607703; 45.424652, -75.635098CyclingFunctional design done by MMM Group. Detailed design contracted to Robinson Consultants. Final design put up on city website mid-July 2015.
Construction in progress, summer 2016. Construction completed except landscaping, Nov 2016.
Ward 11 (tim.tierney@ottawa.ca)Zlatko Krstulic (planning), Jamie MacDonald (construction)Post-Build ReviewPaul ClarkeStill looking for a new prime. Volunteer?2015-Aug-18: Sent e-mail with questions to Zlatko.
AWG Project Folder
East
37
C2015-15Multi-use Pathway (MUP) Extension on Murray St - from Mackenzie to SussexContinue the Multi-use Pathway (MUP) that starts from Alexandra Bridge closer to the market.45.428526, -75.696447CfSCBiggest benefit is to simplify getting to Hull for northbound cyclists on Sussex. Need to involve city and NCC.Ward 12 (mathieu.fleury@ottawa.ca), NCC, probably US EmbassyNone identified yetPreliminaryPeter Fawcett2015-May-20: AWG discussed.
AWG Project Folder
Central
38
C2015-16Mill Street Brew Pub Parking BarriersLobby to change parking stalls that border the Ottawa River Pathway so long vehicles do not obstruct it.45.419184, -75.712262CfSCNCC plans to rearrange parking at the site in the coming years. This should be an opportunity to correct the situation. Ward 14 (catherine.mckenney@ottawa.ca)ClosedHayley Price-Kelly
Gareth Davies
2015-Dec-07: Raised with Mathieu Brisson of NCC at meeting.Completed May/June 2016 by placing pre-cast concrete curbs in affected parking bays.
AWG Project Folder
Central
39
C2015-17Link between Max Keeping Bridge and Coventry RoadCC9: Multi-use Pathway (MUP) between north end of bridge, east around baseball stadium and up to Lola St.CC945.420877, -75.654194CyclingComponentCompleted 2016.Ward 13 (tobi.nussbaum@ottawa.ca)Bruce KennyClosedPaul Clarke2015-Nov-23: E-mail to Bruce Kenny to get more info.
2015-Nov-18: On-site inspections.
2015-Dec-24: On-site inspections.
2016-Sep-04: Paul Clarke took photos.
AWG Project Folder
East
40
C2015-18Barrhaven Railway Multi-use Pathway (MUP)P1-3. From Conway-Valiant Tunnel east beside VIA line and on to Highbury ParkP1-3CyclingComponentMostly done as of August 2016.Ward 3 (jan.harder@ottawa.ca)Sam Roberts, Susan JohnsConstructionHeather Shearer, Paul ClarkeInspect and send review once complete2015-Nov-??: Photos taken. 2016-May-24: Photos taken. 2016-Oct-19: Photos taken, e-mail on barrier observations sent to City.
Heather rode 2016-10-31. Transition from SB Multi-use Pathway (MUP) to on-road bike lanes would be much-improved with flared asphalt to allow a more natural angle of entry. With no special intersection treatments, riding across intersections with other roads feels dangerous in both directions - concerned about being hit by a turning driver. When NB at night, glare from oncoming headlights is blinding - tall ornamental grass in the buffer strip is one option to mitigate this. Of course, I rode on the sidewalk at both ends of the Multi-use Pathway (MUP) to continue my trip on Greenbank.City page
AWG Project Folder
South
41
C2015-19Nepean TrailAlternative route to riding along Merivale Rd shopping strip. Also linking to Woodfield to the west and Prince of Wales.P1-845.346351, -75.726697CyclingComponentHans Moor advised Robin in a ride-along in 2014. Keith Egli and designers presented at one of his ward meetings, ~March 2016.
City Status: Study by September 2016. Preliminary/detailed designs would then be prepared based on the functional planning study with the goal of construction in 2018.
Ward 9 (keith.egli@ottawa.ca)Robin Bennett, Kate Whitfield (Parsons)Functional design done. Not sure about city's part of construction; part beside Movati gym has been at least started by landowner.Jim Forbes, Heather ShearerPreviewing2016-02-18: Heather, Jim & Paul attended public meeting held by Egli on the project.http://ottawa.ca/en/city-hall/public-consultations/transportation/nepean-trail
AWG Project Folder
Central
42
C2015-20Shefford Rd Pathway - Montreal Rd to SGECPP1-10. Multi-use Pathway (MUP) linking to the NCC's parkway and pathwaysP1-1045.450341, -75.588283; 45.463142, -75.595182CyclingComponentOn-line consultation was conducted until 2016-Jul-24.Ward 11 (tim.tierney@ottawa.ca)Sam Roberts (Planning), Jamie MacDonald (ISD)Functional design stage. Construction slated 2017 or 2018Peter FawcettPreviewinghttp://ottawa.ca/en/city-hall/public-consultations/transportation/shefford-road-multi-use-pathway
AWG Project Folder
East
43
C2015-21Mackenzie Avenue Cycle TracksBidirectional facility from St Patrick to Rideau StP1-1245.427335, -75.695931CyclingOpened May 19, 2017. Ongoing safety concerns at northern end because of poorly differentiated crossings for pedestrians and cyclists.Ward 12 (mathieu.fleury@ottawa.ca), NCCZlatko Krstulic, Jamie McDonaldClosedFeliks WelfeldAsk for better connections to the path network, particularly at the south end.2015-Dec-03: Submission to Zlatko.
2015-Dec-07: Paul and Gareth discussed with NCC.
2015-Dec-15: Gareth sent formal letter to include Fleury, Egli.
2016-Oct-18:Felix took over as Prime from Sarah Partridge
http://ottawa.ca/en/city-hall/planning-and-development/transforming-ottawa/mackenzie-avenue-bike-tracks
AWG Project Folder
Central
44
C2015-22Pathway - Train Yards to CoronationP1-14. Multi-use Pathway (MUP) from intersection Industrial-Train Yards south to residential streetP1-1445.411509, -75.645696CyclingComponentWard 18 (jean.cloutier@ottawa.ca)Sam RobertsFunctional DesignSeamus DeGrandprePreviewing2015-Nov-17: First preview shown to AWG.
AWG Project Folder
East
45
C2015-23Woodroffe Pathway - Norice to CollegeP1-15. Multi-use Pathway (MUP) to serve employment node at Centrepointe.P1-1545.339090, -75.754865; 45.346887, -75.759672CyclingComponentCould be affected by possible future Maintenance and Storage Facility for the LRT when it expands in Stage2.Ward 8 (rick.chiarelli@ottawa.ca)Sam RobertsFunctional DesignJim Forbes, Heather ShearerPreviewing
AWG Project Folder
Central
46
C2015-24Link from Hog's Back to Sawmill Creek PathwayP1-21. Multi-use Pathway (MUP) to serve employment nodesP1-2145.373591, -75.684454CyclingComponentJuly 19, 2017: there has response to our updates.
First preview shown to AWG, Dec 16/15
Ward 16 (riley.brockington@ottawa.ca)Sam RobertsFunctional DesignHans MoorPreviewing
AWG Project Folder
Central
47
C2015-25Improved Cycling Access at Riverside Hospital P1-23. Multi-use Pathway (MUP) and signed local route to access back of Riverside campus of hospital, etc.P1-2345.396829, -75.667258CyclingComponentWard 18 (jean.cloutier@ottawa.ca),
Ward 17 (david.chernushenko@ottawa.ca)
Sam RobertsFunctional DesignDon Fugler,
Brian McPherson
Previewing, photos taken
AWG Project Folder
East
48
C2015-26Gladstone Pavement Markings, from Parkdale to PrestonP1-28. Mark shared-use lanesP1-2845.399525, -75.727984; 45.404595, -75.712041CyclingWard 14 (catherine.mckenney@ottawa.ca),
Ward 15 (jeff.leiper@ottawa.ca)
Robin BennettFunctional DesignRandy Kemp,
Eric Darwin
Previewing
AWG Project Folder
Central
49
C2015-27Akerson Rd Subdivision Path links with crossing of EaglesonP1-29. Multi-use Pathway (MUP)s to fill in missing links.P1-2945.280393, -75.863910CyclingComponentWard 23 (allan.hubley@ottawa.ca)Robin BennettFunctional DesignHeather ShearerPreviewing, photos taken2016-Apr-13: Reviewed at AWG meeting.http://ottawa.ca/en/city-hall/public-consultations/transportation/akerson-subdivision-pathway
AWG Project Folder
West
50
C2015-28Scott St/Albert St. Bikeway Improvements, Holland to BronsonOne-way tracks designed for both directions, to be built once LRT Confederation Line is opened in 2018 and corridor ceases to be major bus route.P1-3145.403746, -75.734248; 45.415567, -75.708213CyclingComponentBike lanes now are not the final ones...just for the interim period when buses are using Scott during LRT build.Ward 14 (catherine.mckenney@ottawa.ca),
Ward 15 (jeff.leiper@ottawa.ca)
Robin BennettFunctional DesignRandy Kemp,
Eric Darwin
Obtain latest plans. Find out when detailed design starts.
AWG Project Folder
Central
51
C2015-29Woodroffe Pathway - Longfields to StonewayP1-34. Multi-use Pathway (MUP) to fix missing linkP1-3445.291308, -75.726905; 45.287751, -75.725074CyclingComponentMap of plan: http://documents.ottawa.ca/sites/documents.ottawa.ca/files/woodroffe_Multi-use Pathway (MUP)_en.pdfWard 9 (keith.egli@ottawa.ca),
Ward 22 (michael.qaqish@ottawa.ca)
Sam RobertsFunctional DesignHeather ShearerPreviewing, photos taken Need to review design2016-10-28: Heather has photos.City page
AWG Project Folder
Central
52
C2015-30Queen Elizabeth Drive - Crossings at Commissioner's Park and at Queen Elizabeth PlaceCC5 (part of): Crossings of QED at Commissioner's Park and at Queen Elizabeth Place (just near Bank). http://www.ncc-ccn.gc.ca/property-management/what-we-manage/queen-elizabeth-driveway-crossing-enhancementsCC545.397696, -75.703538; 45.396554, -75.685333CyclingComponentParts of CC5 (Remainder is UofO tunnel at Corktown Bridge)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project. 2016-Sep-26: Construction began.
Ward 17 (david.chernushenko@ottawa.ca)Meghan WhiteheadConstructionBrendan OhUiginnPreviewing2016-Jun-15: Reviewed at AWG meeting.
Alex deVries sent letter to Meghan W. Answer came back that nothing would be changed. 2016-Nov-14: Photos taken; build is almost complete.
City Link
AWG Project Folder
Central
53
C2015-31Crossride across Colonel By Drive at Corktown BridgeCC5 (part of): Revised crossing of Colonel By Drive at Corktown BridgeCC545.420461, -75.683107CyclingComponentChange at Corktown Bridge/U of O tunnel required due to LRT build in place of TransitwayWard 12 (mathieu.fleury@ottawa.ca)Adam HortopFunctional DesignEtienne GrallPreviewing
AWG Project Folder
Central
54
C2015-32Paved Shoulders on MacFarlane RdCC6: Paved shoulders between Merivale and DeakinCC645.323017, -75.717382; 45.331231, -75.703209CyclingWill bike lanes be marked? NO.Ward 9 (keith.egli@ottawa.ca)Adam Hortop, Louis QuigleyPost-Build ReviewHeather ShearerSomeone in AWG should inspect again, once all finished.2016-Oct-19: Paul C inspected and found edge/lane lines not yet marked. Returning status to 'Construction'. Photos taken. E-mail dialogue followed; see correspondence. 2016-Nov-10: Success to have a 'no-stopping' zone extended. City page
AWG Project Folder
South
55
C2015-33Belfast/Train Yards Corridor Multi-use Pathway (MUP)CC8: Multi-use Pathway (MUP) linking Coronation Ave to Coventry RdCC8,
P1-14
45.411740, -75.645394; 45.421432, -75.647486CyclingComponentBelfast Multi-use Pathway (MUP) done from Tremblay to near Train Yards, but then turns into a 2-m sidewalk! Also, bizarre jog at a catchbasin. (Jog fixed as of spring 2016.)Ward 13 (tobi.nussbaum@ottawa.ca)Adam HortopSome is done. (Some of it includes P1-14.)Previewing
Assign a prime.
AWG Project Folder
East
56
C2015-34Island Park Drive RepavingResurfacing of the road between Carling and Byron45.389374, -75.726747; 45.394867, -75.740609CyclingComponentIn advance of construction, and after Gareth met with NCC, Paul sent e-mail to Luc Fournier June 28/16, describing the improvement to connect to Multi-use Pathway (MUP). Have had no response. Paving complete as of Oct 7 visit. The centre line and bike lane line markings were not yet done; only crosswalks and stop bars painted.NCC,
Ward 15 (jeff.leiper@ottawa.ca)
Marc Corriveau (NCC), Louis Quigley (city)ConstructionPaul ClarkeMonitor result including measure width of reinstated bike lanes2016-Jun-28: E-mailed Luc Fournier to request a curb cut on E/B road and link into Hampton Park Multi-use Pathway (MUP). 2016-Oct-07: Although paved, it was observed that no connection or curb cut has been done. 2016-Nov-08: On-site inspection saw guide marks for striping of the bike lanes had been done. 2016-Nov-14: Bike lane lines were seen to have been painted.
AWG Project Folder
Central
57
C2015-35Trillium Multi-use Pathway (MUP) Link from Carling to Dow's LakeTrillium Multi-use Pathway (MUP) link from Carling to Dow's LakeCC11, PTIF (Public Transit Infrastructure Fund) 4645.396183, -75.706945CyclingComponentCC11 (part of Council Strategic Initiatives)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 17 (david.chernushenko@ottawa.ca)
NCC
Paul ClarkePreliminaryJacquie LemieuxPreviewing2016-Oct-18: Jacquie took over as Prime from Brendan OhUiginnNews Story 2015-May-22
AWG Project Folder
Central
58
C2015-36Cedarview Road to Holly Acres Rd Multi-use Pathway (MUP) ImprovementsExisting pathway needs cycling facilities where it crosses Richmond Rd, Baseline Rd. Also geometrical fixes, rehabilitation in places.CC12CyclingComponentCrossride planned for crossing CedarviewWard 8 (rick.chiarelli@ottawa.ca)Adam HortopConstructionPaul Clarke2016-Feb-03: Paul spoke with and sent input to Adam until Feb 8th. 2016-Nov-18: Took photos of newly paved Multi-use Pathway (MUP) piece just south of Richmond Rd.
AWG Project Folder
West
59
C2015-37Underpass at Bank St for Rideau River Eastern PathwayMulti-use Pathway (MUP) to go under Billings Bridge45.388849, -75.677330CyclingComponentNCC did not have money to pay its share (50/50 with city), and so project appeared stalled.
Existing City SAFETY IMPROVEMENT PROGRAM project (Public Works) in concert with NCC
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
The PTIF (Public Transit Infrastructure Fund) budget seemed more costly than city told us in Dec 2015.
Ward 17 (david.chernushenko@ottawa.ca),
NCC
Shawn McGuirePreliminaryEtienne Grall
AWG Project Folder
TRUEEast
60
C2015-39Rideau Canal Crossing (Fifth to Clegg)New major bridge structure; addresses large gap between Pretoria and Bank.P2-S345.404227, -75.680932Cycling2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) ProjectWard 17 (david.chernushenko@ottawa.ca)Richard MooreFunctional DesignErinn CunninghamNew project PAC having first meeting 2016-Nov-02 at MMM Group office.Hans and Paul lobbied Yasir Naqvi about this in June 2015http://ottawa.ca/en/city-hall/planning-and-development/rideau-canal-crossing-fifth-clegg
AWG Project Folder
TRUECentral
61
C2015-40Iris Street Road Resurfacing and Sidewalk Addition (Greenbank to Woodroffe)Part of the stretch of Iris got painted bike lanes. Bike Ottawa asked for other bike facilities at the major intersections45.347507, -75.788622; 45.357452, -75.766413CyclingComponentConstruction commenced late-Aug 2016. Painted bike lane on south side of street only. Ward 8 (rick.chiarelli@ottawa.ca)Marc BezansonClosedPaul ClarkeCity page
AWG Project Folder
Central
62
C2015-41Chapel Hill Park & Ride Interim Park & Ride in Chapel Hill South (Orleans) to fill a need until Cumberland Transitway can be built (beyond 2031). Buses will feed into Blair station.45.433270, -75.523706CyclingComponentNotice of Completion issued 2016-Nov-03. The 30-day review period to run from 2016-Nov-14 to 2016-Dec-13.Ward 2 (jody.mitic@ottawa.ca)Frank McKinney (City)
Robert Vastag (Stantec)
Environmental AssessmentJohn BlackReview Environmental Project Report (EPR) and submit any concernsAttended PCG Meeting 2015-Nov-18. Assessing cycling links to proposed locations and bike parking facilities.City Page
AWG Project Folder
East
63
C2016-01Campeau Drive Safety Enhancements (Teron Dr N to Kanata Ave)The City is considering changes to Campeau Drive (Teron Road to Knudson Drive) to address conflicts between
pedestrians and cyclists on the sidewalk on the north side. A three-metre-wide multi-use pathway is proposed to replace the existing
asphalt sidewalk.) Detailed design due to finish in 2017.
CC145.322478, -75.890822; 45.313040, -75.915917CyclingComponentCycling lanes already on Campeau. City undertook a survey on the functional design in June-July 2016. The City is considering changes to Campeau Drive (Teron Road to Knudson Drive) to address conflicts between
pedestrians and cyclists on the sidewalk on the north side.  A
three-metre-wide multi-use pathway is proposed to replace the existing
asphalt sidewalk. Detailed design due to finish in 2017.
Ward 4 (marianne.wilkinson@ottawa.ca)Megan WhiteheadDetailed DesignRoger Farley
farleyroger@yahoo.ca
Previewing2016-Oct-16: Paul C took photos of existing conditions.
2016-Oct-18:Roger took over from Heather Shearer as prime.
City page
AWG Project Folder
West
64
C2016-02Booth Street Bridge Accommodation for Cyclists - Short TermRequest to change Booth in time for opening of the bridge on 2016-Sep-04, to allocate some space for cycling.45.413104, -75.71266FixWard 14 (catherine.mckenney@ottawa.ca)Steve Cripps and others in RIOPost-Build ReviewGareth Davies
AWG Project Folder
TRUECentral
65
C2016-03Bayview StationConcern that cycling links to and past station are not optimized45.409022, -75.721730CyclingComponentWard 14 (catherine.mckenney@ottawa.ca)Meghan WhiteheadPreliminaryEric Darwin
AWG Project Folder
Central
66
C2016-04Richmond Road Complete StreetTo implement a "Complete Street" design concept for the corridor between the Sir John A. Macdonald Parkway in the west and Berkley Avenue in the east, in keeping with the City of Ottawa's new Complete Street Implementation Framework45.369530, -75.783164;45.390162, -75.757858CyclingComponentThis work is being done as part of the Phase II LRT project sometime between 2018 and 2023.
The main work will only cover the stretch of the road between Cleary and SJAM Parkway. The design work for Berkeley to Cleary will be incorporated when remediation work on Richmond is done, probably sometime after 2026. However, we will push for a transition design to improve conditions until then.
Ward 7 (mark.taylor@ottawa.ca)
Ward 15 (jeff.leiper@ottawa.ca)
Marc Magierowicz (city), Paul Croft (Morrison Hershfield), Martha Lush (CSW)Functional DesignPaul Clarke
Randy Kemp
Rob McCrae
Attend PAC Meeting on January 23rd, 2017.
Attend Open House on January 31st, 2017.
2016-Apr-25: Paul and Randy rEnvironmental Project Report (EPR)esent the CfSC on the PAC.
2016-Apr-25: Rob McCrae is on the PAC through his condominium.
2016-Apr-25: First meeting of PAC (Paul, Randy, Rob)
2016-May-30: Second meeting of PAC (Paul, Randy, Rob)
2016-Jun-04: Public consultations (Paul, Randy, Rob)
2016-Jul-05: Submission sent to Marc Magierowicz by Paul Clarke.
2016-Sep-14: Rob and Randy attend Richmond Road re-alignment consultation.
2016-Nov-01: PAC meeting to discuss roll plans; our reps not satisfied with many intersections, especially at Woodroffe.
City Page
AWG Project Folder
Central
67
C2016-05Update of city's Transportation Impact Assessment GuidelinesCyclingComponentCitywideEric DarwinAttend next meeting on Nov 282016-Sep-07: Attended first meeting of PAC
AWG Project Folder
Citywide
68
C2016-06Safety Improvement of Laurier Ave segregated bike lanes.Audit being commissioned by the City in response to 2016-Sep-01 fatality involving right-turning truck.45.418785, -75.698485FixA working group was commenced with first meeting 2016-Sep-16. Mobycon hired to do audit.Ward 14 (catherine.mckenney@ottawa.ca)Keith Egli (Chair),  Phil LandryPreliminaryGareth Davies
Paul Clarke
 2016-Sep-15: Meeting #1 of WG. 2016-Nov-07: Meeting #2 with on-site observations
AWG Project Folder
Central
69
C2016-07Byron Avenue Traffic CalmingTraffic calming measures will be incorporated on Byron from Sherbourne Road to Island Park Drive. 45.381022, -75.770807; 45.394777, -75.740674CyclingComponentIt has been proposed that the city might incorporate Advisory Cycling Lanes on a trial basis along with other cycling facilities.Ward 15 (jeff.leiper@ottawa.ca)Justin SwanFunctional DesignGareth Davies
Randy Kemp
We are on the PAC.
2016-Jun-16: Attended the public consultation.
http://ottawa.ca/en/city-hall/public-consultations/byron-avenue-traffic-calming-design
AWG Project Folder
Central
70
C2016-08Centrepointe Drive and Hemmingwood Way Area Traffic Management Study45.344603, -75.773803CyclingComponentWard 8 (rick.chiarelli@ottawa.ca)Wook Kang (PGM)Functional DesignJim ForbesOpen house #2
Submit comments
on line till Dec 29
2016-Nov-23: Open House #2 held

2016-Dec-10: Drawings posted to City website
2 Alternative plans are on pages 5-8

Notes updated in the Project folder under 2-Notes
City Link
AWG Project Folder
Central
71
C2016-09Viewmount Area Traffic Management StudyThis review is to develop and evaluate design concepts which aim to improve conditions for all road users along the existing Viewmount corridor.45.346532, -75.718571CyclingComponentSharrows are planned. It's signed for 40kmh and, according to plans, there is not enough room between the curbs for Advisory lanes, let alone bike lanes. This is a major transit route, and the purpose of this project is to reduce cut through arterial traffic between Merivale and Meadowlands.Ward 8 (rick.chiarelli@ottawa.ca)Justin Swan
Functional design
Working draft available
Jim Forbes
2016-Sep-14: Gareth attended PCG meeting.
2016-Oct-26: Jim attended the Public meeting for the draft plan

2016-Nov-16: Justin said the next step will be to procure funding.
City Link
AWG Project Folder
Central
72
C2016-10Multi-Use Pathway (Michael St. to St-Laurent)P2-11, PTIF (Public Transit Infrastructure Fund) 59unclear from notesCyclingComponentPART OF P2-11 (Rest connects Cyrville to Aviation Pkwy, but that part is not in LRT corridor)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 11 (tim.tierney@ottawa.ca)Paul ClarkePreliminaryAssign a primehttp://documents.ottawa.ca/sites/documents.ottawa.ca/files/documents/tod2_plan_annexes_en.pdf
AWG Project Folder
East
73
C2016-11Booth Street Cycle Track from Sir John A MacDonald to AlbertPermanent solution for cycling on Booth, especially on bridge, in time for 2018 LRT opening45.413333, -75.712800CyclingNEW - Due to oversight
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 14 (catherine.mckenney@ottawa.ca)Meghan WhiteheadPreliminaryEric Darwin 
AWG Project Folder
Central
74
C2016-12Kanata LRT Extension - Environmental AssessmentTo define a corridor for the future expansion of the City's LRT network to Kanata. Extending LRT to Kanata is identified in the Ultimate Network in the City's 2013 Transportation Master Plan (TMP). Location at approximate centre of area under study.45.320453, -75.886425CyclingComponent2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) ProjectWard 4 (marianne.wilkinson@ottawa.ca), Ward 7 (mark.taylor@ottawa.ca) +othersPreliminaryRoger FarleyDiscuss with TACK on Nov 15City Link
AWG Project Folder
West
75
C2016-13Chapman Mills Transit Corridor - Beatrice to Longfields45.271684, -75.725931; 45.268558, -75.734779CyclingComponentCycle tracks included
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 2 (jody.mitic@ottawa.ca)2 Glouc-S.NepeanPreliminaryAssign a prime2016-Oct-19: Paul C took photos of existing conditions - Beatrice to Mancini-Leamington.
AWG Project Folder
East
76
C2016-14Rideau River Crossing - Confederation Heights to Carleton UniversityRideau River Crossing - Confederation Heights to Carleton University - pedestrian/cycling45.381477, -75.695238CyclingComponentNEW / NOT IN OCP 2013.
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project. It is anticipated construction could extend over the course of the 2017 and 2018 construction seasons to bring to completion.
Ward 16 (riley.brockington@ottawa.ca), Ward 17 (david.chernushenko@ottawa.ca) Sam RobertsFunctional DesignAlex Wilcox
AWG Project Folder
East
77
C2016-15Eastbound and Westbound Cycle Tracks on Heron Road (Data Centre/Heron Station to Bank)P1-1945.377556, -75.680921; 45.377556, -75.680921CyclingPart of P1-19 (Remainder extends east of Bank to Alta Vista)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project (functional design portion only)
Ward 17 (david.chernushenko@ottawa.ca)Adam HortopFunctional DesignTrevor Haché 2016-Oct-05: See note for C2016-16
AWG Project Folder
East
78
C2016-16Eastbound Cycle Tracks on Heron Rd (Colbert Pathway to east of Jefferson)-EB bike tracks only45.380221, -75.642416;45.380221, -75.642416CyclingNEW / NOT IN OCP2013
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project. PTIF (Public Transit Infrastructure Fund) covers both design and construction.
Ward 18 (jean.cloutier@ottawa.ca)Adam Hortop, Paul ClarkeFunctional DesignTrevor Haché 2016-Oct-05: Adam Hortop answered an e-mail by Trevor Hache about scheduling. Details in Doc file.
AWG Project Folder
East
79
C2016-17Richmond Rd - South Side Sidewalk Reconstruction, Croydon Avenue to Assaly RoadNot extending to Richmond Rd's link with NCC Pinecrest Creek Multi-use Pathway (MUP).45.365074, -75.788395; VCyclingComponentNEW / NOT IN OCP2013 (Robin Bennett already working on it)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 7 (mark.taylor@ottawa.ca)Robin Bennett, Max RossFunctional DesignChristine Binne
AWG Project Folder
Central
80
C2016-18Kanata North Cycle Link (Carling at March Rd)This project completes a missing link approximately 200m in length along existing cycling facilities near an intersection of two major arterial roads. The cycling link will provide improved cycling commuter access to the Kanata North employment area. This project improves cycling connectivity from Eagleson Rd. and Teron Transitway stations to the Kanata North employment node. This complements the existing peak period transit service.P1-27A45.338647, -75.911681CyclingPossibly P1-27A. INQUIRE
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project. This is a companion project with Kanata North cycle link (Herzberg at March Rd.)
Ward 4 (marianne.wilkinson@ottawa.ca)Robin BennettPreliminaryRoger FarleyDiscuss with TACK on Nov 15http://ottawa.ca/2/en/city-hall/public-engagement/carling-avenue-cycling-improvements
AWG Project Folder
West
81
C2016-19Kanata North Cycle Link (Herzberg at March Rd)This project completes a missing link ( approximately 260m in length) along existing cycling facilities near an intersection of two major arterial roads. The cycling link will provide improved cycling commuter access to the Kanata North employment area. This project improves cycling connectivity from Eagleson Rd. and Teron Transitway stations to the Kanata North employment node. P2-1445.332222, -75.893428CyclingPossibly P2-14. INQUIRE
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project. This is a companion project with Kanata North cycle link (Carling at March Rd.).
Ward 4 (marianne.wilkinson@ottawa.ca)Robin BennettPreliminaryAlex deVriesDiscuss with TACK on Nov 15Sent comments on May 24, 2017.http://ottawa.ca/2/en/city-hall/public-engagement/herzberg-road-improvements-for-cyclists-and-pedestrians
AWG Project Folder
West
82
C2016-20Hunt Club Road Cycling Links (Riverside to Paul Benoit)P2-6B45.334621, -75.692553; 45.337683, -75.685107CyclingPart of P2-6B (Remainder extends east to Billy Bishop Private)
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 16 (riley.brockington@ottawa.ca)Zlatko KrstulicPreliminaryAssign a prime
AWG Project Folder
South
83
C2016-21McArthur Avenue Cycling LanesThis project will add bike lanes along both sides of McArthur Avenue, and will feature sections of parking-protected on-road bike lanes. 45.432600, -75.642486; 45.430697, -75.668943CyclingRoadway deemed too wide by city for traffic load. Bike lanes suggested by Overbrook Community Assocation at public consultation. Initial plan did not include parking-protected lanes. Plan modified to include them after online consultation. 2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) ProjectWard 12 (mathieu.fleury@ottawa.ca), Ward 13 (tobi.nussbaum@ottawa.ca) (Both TBC)Eric OuimetPreliminaryStephen Highham2016-Oct-18: Guy Grenier to make inquiries.
AWG Project Folder
East
84
C2016-22Cardinal Creek Park 18A Multi-use Pathway (MUP)This pathway will connect the existing Park Cardinal Creek Community Park (18B) to the planned Valin Park (18A)45.478055, -75.459393CyclingINQUIRE
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 1 (bob.monette@ottawa.ca)Ingrid Coney Tel.: 613-580-2424, ext. 13226 Email: ingrid.coney@ottawa.caFunctional DesignGilbert BouffardSince no Multi-use Pathway (MUP) will be in the park itself, I do not believe follow are required on this file.
Once the Frank Kenny Extension is built, there will be a Multi-use Pathway (MUP) standard pathway along the entire frontage of the park.
http://ottawa.ca/en/city-hall/public-engagement/parks-and-recreation-public-consultations#cardinal-creek-park-18a AWG Project FolderEast
85
C2016-23Manotick Multi-use Pathway (MUP) Manotick - Multi-use Pathway (MUP) between Main St and River rd and addition of MUPs to two bridgesCC1045.226693, -75.686296; 45.233908, -75.675930CyclingComponentNEW- Seems to be a westward Extension of CC10
2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project
Ward 20 (george.darouze@ottawa.ca), Ward 21 (scott.moffatt@ottawa.ca)PreliminaryAssign a prime2016-Oct-18: Gareth Davies to talk to Community Association President.
AWG Project Folder
South
86
C2016-24Elgin St/Hawthorne Ave Functional Design StudyLooking at reconfiguration of Elgin St (Laurier to QED) and Hawthorne (Pretoria Bridge to Main) CyclingComponentSeveral of our members attended Public Design Workshop on 2016-Jun-28Ward 14 (catherine.mckenney@ottawa.ca), Ward 17 (david.chernushenko@ottawa.ca)Vanessa Black (PGM) Ron Clarke (Parsons)Functional DesignErinn Cunningham 2016-Oct-02: Attended Working Group meetinghttp://ottawa.ca/en/city-hall/public-consultations/elgin-street-and-hawthorne-avenue-functional-design-study
AWG Project Folder
Central
87
C2016-25National Arts Centre Architectural RejuvenationBuilding changes affect Rideau Canal Western Pathway during and after construction45.423513, -75.692909Ward 14 (catherine.mckenney@ottawa.ca), NCCAndrew Wisniowski (proj mgr)Functional DesignHans MoorFind out when meeting promised for this fall re pathway is scheduled.AWG met with Wisniowski at its May 2016 meeting.
AWG Project Folder
Central
88
C2016-26Somerset Ave. East Pavement MarkingsIncrease to cyclist safety at King Edward Ave intersection with painted lanes and bike boxes45.422112, -75.680081CyclingAppears to be initiative of Councillor Fleury. Highly accelerated project!Ward 12 (mathieu.fleury@ottawa.ca)Shawn McGuirePost-Build ReviewGareth Davies
AWG Project Folder
East
89
C2016-27
Dynes Road Cycling Lanes
Addition of on-street bike lanes on both sides of Dynes Rd following reconstruction between Fisher Ave & Prince of Wales; protected cycle track crossings to be added at Dynes & Prince of Wales45.366364, -75.713516; 45.370381, -75.704064CyclingComponentDutch style intersections planned for Dynes on both ends: Fisher and Prince of Wales. Some concern about angle of bike lanes at Fisher.
Work started July 2017, to be finished end of 2019.
Ward 16 (riley.brockington@ottawa.ca)Franco Bonanno (proj mgr)PreliminaryKaren Gordonhttp://ottawa.ca/en/city-hall/planning-and-development/transforming-ottawa/dynes-road-and-prince-wales-drive
AWG Project Folder
East
90
C2016-28Bank Street Functional Design Study - Riverside to LedburyCycle tracks/lanes being considered45.364359, -75.659393CyclingComponentPCG Meeting #1 held 2016-Jun-28. PCG Meeting #2 held 2016-Nov-03.Ward 16 (riley.brockington@ottawa.ca), Ward 17 (david.chernushenko@ottawa.ca), Ward 18 (jean.cloutier@ottawa.ca)Ann Selfe, Patrick Hill (MMM)Functional DesignAlex WilcoxWaiting for report to Transportation CommitteeMet with consultants after public meeting to discuss cycling facilities in the corridor. Recieved response February 14th.
http://ottawa.ca/en/city-hall/public-consultations/transportation/bank-street-renewal-between-riverside-drive-north-and
AWG Project Folder
East
91
C2016-29
Ogilvie Road Multi-use Pathway (MUP)
Multi-use Pathway (MUP) on south side of road between Blair and Montreal RdCC445.447347, -75.594157CyclingComponentIn planning as of 2016-SepWard 11 (tim.tierney@ottawa.ca)Meghan WhiteheadFunctional DesignPeter FawcettFind a prime and find out which planner is working on it. Guy Grenier is a candidate if Peter doesn't want to be prime.
AWG Project Folder
East
92
C2016-30
Spencer Street Rehabilitation
Integrated road/sewer/water project. 45.400639, -75.736745CyclingComponentBike Ottawa and Councillor Leiper successfully lobbied for painted bike lanes. On-street parking was to be eliminated in favour of the new bike lanes; local furor resulted in retention of parking.Ward 15 (jeff.leiper@ottawa.ca)Tara BlasioliConstructionRandy Kemp
Paul Clarke
Monitor detours and finished product
Attend 2017-Apr-25 Meeting.
2016-Oct-11: E-mail to Tara B about setting up cycling detour.
2017-Apr-25: Community Meeting
City page
AWG Project Folder
Central
93
C2016-31Rochester Fields PathwayThis cycling connection is a joint approval between the NCC and the City, and the intent of the approval is to connect the Pinecrest Creek Pathway at Rochester Field with Richmond Road. The City included this connection (that goes through a private parking lot) in the site plan as part of the approval for the development of 485 Richmond Road. 45.389347, -75.762540CyclingCfSC was not aware of this project until after construction was started. This was likely approved in 2012 when the development application was approved. This may have been development application D07-12-12-0131. No information is available on Service Ottawa but there are some stale links on ottwatch.ca.Ward 15 (jeff.leiper@ottawa.ca)Erin O’ConnellConstructionRob McCraeMonitor2016-Sep-19: Contacted Jeff Leiper's office to inquire about project.
2016-Sep-19: Contacted NCC to inquire about project manager.
2016-Sep-29: Received response from Tom Pechloff in Leiper's office.
2016-Sep-30:Received response from NCC.
2016-Oct-04:Contacted Andrew McCreight for more info on development application. Received sections of Site Plan Agreement related to cycling and a site plan with part of the route.
Map
AWG Project Folder
Central
94
C2016-32Montreal Road Transit Priority StudyStudy to examine improving bus travel times through the Montreal corridor between St Laurent Blvd and North River Road45.433627, -75.667670CyclingComponentProtected intersection proposed at Vanier Pkwy and N. River intersectionsWard 12 (mathieu.fleury@ottawa.ca), Ward 13 (tobi.nussbaum@ottawa.ca)Angela Taylor (City), Shawn Rathwell (Dillon Consulting)Functional DesignFeliks Welfeld2016-Jun-13: Attended consultation group meeting
2016-Oct-18: Feliks took over from Sarah Partridge as Prime.
AWG Project Folder
East
95
C2016-33Avalon South PathwayNorth-south Multi-use Pathway (MUP) between Trans-Orleans Pathway/Melanson and Brian Coburn Boulevardlocation unclearCyclingComponentProposing use of P-gates where Multi-use Pathway (MUP) meets Aquaview Dr and Brian Coburn BlvdWard 19 (stephen.blais@ottawa.ca)Ingrid ConeyFunctional DesignGilbert Bouffard2016-Nov-06: Proposed route was viewed in on-site visit. 2016-11-10 Gilbert recieved information from Ms Coney. see note file.City page
AWG Project Folder
East
96
C2016-34Trans Orleans Pathway Alignment ModificationThe proposed plan is roughly 6.5K long and will connect Trim Rd. at Millennium Park ( in the east) to Navan Rd. (in the west) using the corridor reserved for the Cumberland Transitway. That Transitway segment is not planned to be built until after 2031.CC245.467258, -75.449952CyclingComponent2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) Project.Ward 19 (stephen.blais@ottawa.ca)Meghan WhiteheadFunctional DesignGilbert Bouffard
John Black
Online Consultation: February 23 to March 9, 2017, Gilbert attended open house, comments are required no later then March 9.
March 3, 2017 comments sent to Meghan Whitehead with CC to Stephen Blais.
May 5, 2017 Meghan Whitehead advised that most of the comments will be answerd on the website soon. LIst of command and response was posted online and saved in AWG Folder
http://ottawa.ca/en/search?searchfield=Trans+Orleans+Pathway&form_build_id=form-njcLqLfuRkvdTHuaboNjhrY0TZF39MW1VTUNaEppz7I&form_id=ottawa_search_search_form
AWG Project Folder
East
97
C2016-35Cycling Lanes on Prince of Wales near Hunt ClubPrince of Wales northbound is being widened, so will include new bike lanes (separated from the roadway by a rumble strip)45.334252, -75.700565CyclingComponentNo work is being done southbound, so there are no new facilities. City said the facilities were “very cyclable”. Concern is that southbound cyclists are being ignored.Ward 9 (keith.egli@ottawa.ca)Frank McKinneyPreliminaryAlex deVries
AWG Project Folder
South
98
C2016-36Cedarview RepavingCedarview is to be rebuilt without paved shoulders45.299017, -75.790195CfSCThe concern reported by a cyclist is that no cycling facilities are included in the widening of Cedarview. This is not on the OCP. Functional design only at this point. Detailed design in 2016/2017. There are open questions as of June 15, 2015.Ward 3 (jan.harder@ottawa.ca) (TBC)Councillor Harder, Louis Quigley, Carol Valpy, Susan Douglas, Stephen Forestell, Zlatko KrstulicPreliminaryInfo gathering by AWG.
Assign a prime.
AWG Project Folder
West
99
C2016-37Bicycle shelters at Transitway stations Bicycle shelters at Transitway stations to encourage multimodal travelCycling2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) ProjectOC TranspoPreliminaryAssign a prime
AWG Project Folder
Citywide
100
C2016-38Enclosed bicycle parking areas at Transitway stationsEnclosed bicycle parking areas at Transitway stations to encourage multimodal travelCycling2016-Aug-23: Included as PTIF (Public Transit Infrastructure Fund) ProjectOC TranspoPreliminaryAssign a prime
AWG Project Folder
Citywide