| A | B | C | D | E | F | G | H | I | J | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
1 | OFFICE OF THE CHIEF ENGINEER, LSGD, THIRUVANANTHAPURAM | ||||||||||
2 | MC001 - Proforma for submitting damages caused to roads and bridges | ||||||||||
3 | Updated on 04-10-2018 | ||||||||||
4 | Thrissur Distict | ||||||||||
5 | ക്രമ നം : | തദ്ദേശ സ്ഥാപനത്തിന്റെ പേര് (in English only) | Total number of affected wards | തകർന്ന റോഡുകളുട നീളം (in Km) | ഭാഗീകമായി തകർന്ന റോഡുകളിൽ ഗതാഗതം പുനർസ്ഥാപിച്ചതിന്റ നീളം (in Km) | തകർന്ന പാലങ്ങളുടെ എണ്ണം | ഭാഗീകമായി തകർണാവയിൽ ഗതാഗം പുനർസ്ഥാപിച്ചവ (എണ്ണം) | റിമാർക്സ് | |||
6 | ഭാഗികം | പൂർണം | ഭാഗികം | പൂർണം | |||||||
7 | A | B | C | D | E</=C | F | G | H</=F | I | ||
8 | Thrissur DP | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
9 | |||||||||||
10 | Wadakkanchery BP | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Updated as on 24/09/2018 | ||
11 | Desamangalam GP | 15 | 6.045 | 0 | 6.045 | 0 | 0 | 0 | Updated as on 24/09/2018.Damaged side protection wall in road and thodu. Pot holes formed in roads. permanent maintenance to be required. | ||
12 | Erumappetty GP | 16 | 7.645 | 0 | 7.645 | 1 | 0 | 1 | Updated on 24/09/2018 Damaged roads includes surface erosion, forming of pot holes, collapse of side protection walls, culverts etc. | ||
13 | Mulloorkkara GP | 14 | 1.871 | 0 | 1.871 | 1 | 1 | 1 Nadapalam. Damaged side protection wall in road and thodu. Pot holes formed in roads permanenet maintenance to be done.Updated on 24.09.2018 | |||
14 | Thekkumkara GP | 18 | 3.5 | 0 | 3.5 | 2 | 0 | 2 | all the road allow passage of vehicles now but permanant maintenance to be done Update as 24/09/2018 | ||
15 | Varavoor GP | 14 | 5.35 | 0 | 5.35 | 9 | 2 | 9 | updated on 24/09/2018 Damaged roads includes surface erosion, forming of pot holes, collapse of side protection walls, culverts etc. | ||
16 | |||||||||||
17 | |||||||||||
18 | Chowannur BP | 0 | updated as on 27.8.18 | ||||||||
19 | Choondal GP | 9 | 4.2 | 0 | 4.2 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
20 | Chowannur GP | 13 | 4.6 | 0 | 4.6 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
21 | Kadangod GP | 18 | 4.875 | 0 | 4.875 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
22 | Kadavalloor GP | 20 | 12.66 | 0 | 12.66 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
23 | Kandanassery GP | 9 | 14.68 | 0 | 14.68 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
24 | Kattukambal GP | 16 | 4.4 | 0 | 4.4 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
25 | Porkkulam GP | 13 | 3.9 | 0 | 3.9 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
26 | Veloor GP | 14 | 3.08 | 0 | 3.08 | 0 | 0 | 0 | potholes are formed no hidrance to traffic movement | ||
27 | |||||||||||
28 | |||||||||||
29 | Ollukkara BP | Updated as on 24/08/2018 | |||||||||
30 | Madakkathara GP | 2 | 3.3 | 0 | 0 | 1 | 0 | 0 | |||
31 | Nadathara GP | 15 | 4.2 | 0 | 0 | 0 | 0 | 0 | As on 30/8/18 | ||
32 | Pannancherry GP | 10 | 5 | 5 | 2 | 0 | 0 | 0 | As on 27/8/18 | ||
33 | Puthoor GP | 21 | 10.5 | 0 | 0 | 2 | 0 | 0 | as on 02/09/2018 | ||
34 | |||||||||||
35 | |||||||||||
36 | Puzhakkal BP | ||||||||||
37 | Adat GP | 14 | 6.264 | 0 | 6.264 | 2 | 0 | Potholes formed along the roads Two.earthen road eroded (200 m) 2 culvert damaged, two culverts to be newly constructed to control overflow of water , three roads side protection needed Site visit not completed in all wards | |||
38 | Avanoor GP | 11 | 2.94 | 0 | 0 | 0 | Damaged side protection wall in road, thodu side protection damaged pot holes formed in roads no hindrance to traffic movement | ||||
39 | Kaiparambu GP | 13 | 5.8 | 0 | 0 | 0 | 4.3 | One mud road erosion occured, not motorable. Other roads potholes formed, no hinderance to traffic. | |||
40 | Kolazhy GP | 16 | 23.5 | 0 | 14 | 3-side protection collapsed | |||||
41 | Mulamkunnathukavu GP | 10 | 4.8 | 0 | 4.8 | 0 | 0 | 0 | 3 earthen roads eroded,bt surface damaged in many roads | ||
42 | Tholoor GP | 13 | 2.03 | 0 | 0 | 0 | 0 | 0 | ramankulam rd 0.01 soil eroded,LF sub rd 2km pot holes formed,edklthur puthur rd storm water and soil deposit 0.02km | ||
43 | |||||||||||
44 | |||||||||||
45 | Anthikkad BP | No roads under the asset of BP | |||||||||
46 | Anthikkad GP | 13 | 9.5 | 0 | 0 | 1 | 0 | ||||
47 | Arimpoor GP | 18 | 12 | 0 | |||||||
48 | Chazhoor GP | 17 | 3.19 | 0 | 3.19 | ||||||
49 | Manaloor GP | 19 | 1.350 | 0.480 | 0.000 | 0 | 0 | ||||
50 | Thanniyam GP | 18 | 6.750 | 0.000 | 0.000 | 0 | 0 | ||||
51 | |||||||||||
52 | |||||||||||
53 | Mathilakam BP | No roads under the asset of BP | |||||||||
54 | Edathuruthy GP | 16 | 10.1 | 0 | 10.1 | 0 | 0 | 0 | Site visit in progress | ||
55 | Edavilangu GP | 10 | 7.2 | 0 | 7.2 | 0 | 0 | 0 | Site visit in progress | ||
56 | Eriyad GP | 18 | 8 | 0 | 8 | 0 | 0 | 0 | Site visit in progress | ||
57 | Kaippamangalam GP | 9 | 4.1 | 0 | 4.1 | 0 | 0 | 0 | Site visit in progress | ||
58 | Mathilakam GP | 5 | 10.3 | 0 | 10.3 | 0 | 0 | 0 | pot holes are formed in road.Top surface of road (seal coat) completely damaged. Site visit in progress. | ||
59 | Perinjanam GP | 4 | 17 | 0 | 17 | 0 | 0 | 0 | pot holes are formed in road.Top surface of road (seal coat) completely damaged. Site visit in progress. | ||
60 | Sreenarayanapuram GP | 21 | 15.283 | 0 | 15.283 | 2 | 0 | Pot holes and seepage loss of surface earth formed in road. No hinderance to traffic Site visit in progress.2 culverts | |||
61 | |||||||||||
62 | |||||||||||
63 | Chavakkad BP | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||
64 | Kadapuram GP | 16 | 3.063 | 0 | ഭാഗികമായി ഗതാഗതം ക്ലിയർ ചെയ്തിട്ടുണ്ട്. | 0 | 0 | 0 | റോഡുകള്ക്ക് ഗുരുതരമായ പ്രശ്നങ്ങളില്ല. പോട്ട്ഹോള്സ് ഉണ്ട്. പലയിടങ്ങളിലും റോഡ് സർഫേസ് ഇളകിയ നിലയിലാണ് | ||
65 | Orumanayoor GP | 13 | 4 | 0 | ഭാഗികമായി ഗതാഗതം ക്ലിയർ ചെയ്തിട്ടുണ്ട്. | 0 | 0 | 0 | റോഡുകള്ക്ക് ഗുരുതരമായ പ്രശ്നങ്ങളില്ല. പോട്ട്ഹോള്സ് ഉണ്ട്. പലയിടങ്ങളിലും റോഡ് സർഫേസ് ഇളകിയ നിലയിലാണ് | ||
66 | Punnayoorkkulam GP | 19 | 14.09 | 0 | 0 | 2 | 0 | 4 | |||
67 | Punnayur GP | 20 | 11.055 | 0.042 | 11.055 | 0 | 0 | 0 | ഒരു റോഡ് മാത്രം 42 m നീളത്തിൽ 1.50 m താഴ്ചയിൽ കാനയോടൊപ്പം ഇടിഞ്ഞു വീണു. ഈ റോഡ് സഞ്ചാരയോഗ്യമല്ല. ബാക്കി റോഡുകളെല്ലാം സഞ്ചാരയോഗ്യമാണ്. റോഡുകള്ക്ക് ഗുരുതരമായ പ്രശ്നങ്ങളില്ല. പോട്ട്ഹോള്സ് ഉണ്ട്. പലയിടങ്ങളിലും റോഡ് സർഫേസ് ഇളകിയ നിലയിലാണ് | ||
68 | Vadakkekkad GP | 10 | 0.746 | 0 | 0.746 | 0 | 0 | 0 | |||
69 | |||||||||||
70 | |||||||||||
71 | Pazhayannoor BP | ||||||||||
72 | Chelakkara GP | 21 | 22.75 | 22.75 | 4 | 4 | ടാറിങ്ങ് സർഫസ് മാത്രമാണ് തകർന്നിട്ടുള്ളത്.ഗതാഗതത്തിന് തടസമില്ല | ||||
73 | Kondazhi GP | 14 | 9.1 | 0 | 0 | 2 | ടാറിങ്ങ് സർഫസ് മാത്രമാണ് തകർന്നിട്ടുള്ളത്.ഗതാഗതത്തിന് തടസമില്ല 2 nos culvert | ||||
74 | Panjal GP | 0.635 | 10.51 | 2 | 1 | site visit in progress | |||||
75 | Pazhayannoor GP | 22 | 2 | 23 | 2 | 6 | 3 | 6 | |||
76 | Thiruvilwamala GP | 10 | 9.4 | 9.4 | ടാറിങ്ങ് സർഫസ് മാത്രമാണ് തകർന്നിട്ടുള്ളത്.ഗതാഗതത്തിന് തടസമില്ല | ||||||
77 | Vallatholnagar GP | ||||||||||
78 | |||||||||||
79 | |||||||||||
80 | Mullassery BP | ||||||||||
81 | Elavally GP | 15 | 7.5 | 5.39 | 3 | 0 | 0 | 0 | Site visit in progress | ||
82 | Mullassery GP | 15 | 6.853 | 0.05 | 6.803 | 0 | 0 | tarring surface is damaged in various roads.sides of PMGSY road is damaged in 15m length in one road and another road land is sliding in 38mlength. sid protection is neccessary for PMGSY road (Pulla road)for a length 1200m | |||
83 | Pavaratty GP | 2 | 0.8 | 0.8 | |||||||
84 | Venkidangu GP | 17 | 2.42 | 0 | 2.42 | 0 | 0 | 0 | |||
85 | |||||||||||
86 | |||||||||||
87 | Thalikulam BP | ||||||||||
88 | Engandiyoor GP | 16 | 1 | 0 | 0 | 0 | 1 | 0 | പൂർണ്ണമായി വെള്ളം ഇറങ്ങാത്തതിനാൽ സൈറ്റ് പരിശോധന എല്ലാ സ്ഥലങ്ങളിലും നടത്താൻ സാധിച്ചിട്ടില്ല കൽവെർട് തകർന്നിട്ടുണ്ട് .മിക്ക റോഡ്കളുടെ ടാറിങ് സർഫേസ് മോശമായിട്ടുണ്ട് .repair വേണ്ടി വരും | ||
89 | Nattika GP | 14 | 3 | 1 | 0 | 0 | ടാറിങ്ങ് സർഫസ് മാത്രമാണ് തകർന്നിട്ടുള്ളത്.ഗതാഗതത്തിന് തടസമില്ല | ||||
90 | Thalikkulam GP | 16 | 4 | 1.34 | 0 | 0 | ടാറിങ്ങ് സർഫസ് മാത്രമാണ് തകർന്നിട്ടുള്ളത്.ഗതാഗതത്തിന് തടസമില്ല | ||||
91 | Vadanappally GP | 18 | 1 | 1 | 0.4 | 0 | 0 | Road surfacec damaged due to high flood.road near beach side completely damaged and temporary arrangements done for access to this area.water is not drained fully.culvert damaged | |||
92 | Valappad GP | 4 | 1.8 | 0.4 | 1.5 | 2 | 2 damaged culvert partially rectified | ||||
93 | |||||||||||
94 | |||||||||||
95 | Cherppu BP | ||||||||||
96 | Avinissery GP | 10 | 7.71 | 7.71 | |||||||
97 | Cherpu GP | 21 | 12 | 2 | 12 | 0 | 0 | ചേർപ്പ് ഗ്രാമപഞ്ചായത്തിലെ 1-11 വരെയുള്ള വാർഡുകൾ ഭാഗികമായും, 12 - 21 വരെ ഉള്ള വാർഡുകൾ പ്രളയം മൂലം പൂർണമായും നശിച്ച അവസ്ഥയിൽ ആണ്..സന്ദർശിക്കാൻ കഴിഞ്ഞ സ്ഥലങ്ങളിലെ പ്രാഥമിക വിവരങ്ങൾ മാത്രമേ രേഖപെടുത്തിയിട്ടുള്ളു. | |||
98 | Paralam GP | 15 | 4.1 | 0 | 4.1 | 1 | 1 | updated as on 01.09.2018 | |||
99 | Vallachira GP | 14 | 14.965 | 0.065 | 14.965 | 4 | 4 | ||||
100 | |||||||||||