Spreadsheet from campaign of Travis County Commissioner Ron Davis, received April 9, 2012
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
View only
 
 
Still loading...
DEVAK
1
Precinct 1 2011 Bond Projects
2
3
Project NameScopeTotal
4
Austin Colony Secondary Access to FM969New 2-lane collector roadway with bike lanes and sidewalks from Westall Street and Sandifer Street to FM969 @ Gilbert Lane$3,730,000
5
Wildhorse ConnectorNew 4-lane divided arterial with bike lanes and sidewalks from future Parmer Lane to FM 973$7,898,000
6
Old Highway 20 Bridge #155Rehabilitate/replace bridge $1,400,000
7
Hunters Bend Road SidewalkNew sidewalk from Austin's Colony Blvd to Red Tails Drive$293,000
8
FM 973-Blake Manor Road ConnectorNew 4-lane divided arterial with bike lanes and sidewalks from FM 973 to Blake Manor Road$7,871,000
9
Blake-Manor RoadWiden 2-lane road to 4-lane arterial with bike lanes and sidewalks from future Wildhorse Connector to East Metro Park entrance$12,442,000
10
Rowe LaneSafety Improvements SH 130 to Martin Lane$1,625,000
11
Weis LaneSafety Improvements Pecan Street to Cele$7,478,000
12
Weis LaneRehabilitate/replace bridge $811,030
13
Tuscany SouthNew 4-lane arterial with bike lanes and sidewalks from US 290 E to Springdale Road$3,250,000
14
Cameron Road (West of SH 130)Widen and realign existing 2-lane roadway to 4-lane divided arterial with bike lanes and sidewalks from Howard Lane to SH 130$13,760,000
15
Arterial APreliminary engineering, design and right-of-way acquisition for future 4-lane divided arterial from US 290 E to Cameron Road$1,553,000
16
Taylor LaneWiden to 4-lanes Braker to Blake-Manor$8,512,000
17
Repair substandard roadsest. 25% of $1,654,000$413,500*
18
Bike Safety est. shareest. share of $3,333,000$3,000,000*
19
East Metro Parkimprovements$975,000*
20
Webberville Parkimprovements$350,000*
21
Eastern Creek Open Spaceest. Precinct 1 share$10,000,000*
22
Conservation easementsest. Precinct 1 share$5,000,000*
23
24
TOTAL:$90,361,530
25
2011 Bond Package$214,900,000
26
Precinct One share:42.05%
27
28
29
*Estimates obtained from Steve Manilla of Travis County Transportation and Natural Resources