Milestone NumberWeek DueDate DueMilestone Description Deliverables Complete?Week NumberFriday Date
2
131/25Update Design Package with tolerances and dimensions Resubmitted Design PackageYES21/18
3
252/8Turn In Purchasing Forms for Request Turn in Purchasing forms YES31/25
4
383/1(Non-tested) Wood Platform Built In Shop Image of Wood Platform YES42/1
5
493/8(Non-tested) Welded Frame Built In Shop Image of Welded Frame YES52/8
6
5113/22Dimension and create load cell box Image of load cell boxYES62/15
7
6134/5Test data of the load cell to make sure it works
Video of load cell being compressed/pulled
72/22
8
7144/12Calibrate the load cell so that it reads zero when no force applied. Video of zeroed out load cell83/1
9
8154/19As Built Poster Emailed In Poster 93/8
10
9154/19Finalize WebpageWebpage URL 103/15Spring Break March 11-16
11
10154/19Complete as built design packageDesign Package113/22
12
123/29
13
134/5
14
Milestones to AddIn Milestone List?UPDATE LINKS TO WEBSITE 144/12
15
Revised Drawings with TolerancesYes
UPDATE BOM AND MILESTONES TO WEBSITE
154/19
16
As Built Drawings Submit for ReviewNo
17
Testing of System w/ Criteria and ObjectivesNo
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100