1 | KAGRA task list for post observation 2020/4/21~ | ||||||||||||||||||||||||||||||||
2 | |||||||||||||||||||||||||||||||||
3 | Task name | description | Using IFO (Yes/Partial/No) | 1:low,not remotable, 2 low,remotable, 3 high,not remotable, 4high,remotable, 5 maintenance | term | assigned to | Priority for O4 preparation | Priority for observation paper | Priority for VIS paper | Priority for IOO paper | Priority for PEM paper | Priority for commissioning paper | working week | Scheduled Date | Comments | ||||||||||||||||||
4 | Feasibility of locking DRFPMI | Yes | 2 | 3weeks | Nakano | 5 | 2 | 1 | 1 | 3 | |||||||||||||||||||||||
5 | Scattered light (high frequency) | Hammering test to IMM area, PR area, SR area(temprary), OMC area and EYA are were completed. C chamber, SRM, IA chambers is not completed. | Yes | 1 | 1day | Yokozawa | 3 | 1 | 1 | 1 | 2 | For noise budget and understanding scattered light for O4 | |||||||||||||||||||||
6 | Scattered light (low frequency by swinging) | Up converted scattering noise. Low frequency with large RMS makes upconverted scattered noise. We did'nt investigate yet | Yes | 2 | 3days | Akutsu | 3 | 1 | 1 | 2 | |||||||||||||||||||||||
7 | OMC chamber vibration RMS measurement | Requested from Aso-san. To investigate the scattered noise inside the OMC chamber, PEM team will measure the vibration with various place. | Yes | 1 | 1day | Yokozawa | 2 | 3 | 0 | 1 | 4 | For noise budget and understanding scattered light for O4 | |||||||||||||||||||||
8 | Fill the eigenfrequencies for Type-A suspension | https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0111/T1911116/001/20191213tyamada_sumconCRYp20161025.pdf Merit : Identification of the line noise sources for the sensitivity of this observation run. (We can make following noise investigation https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11514) Demerit : Those frequency may change in the future observation. | Yes | 4? | Suggested by Yokozawa, but I want to ask someone to manage it. If nobody hand up, please delete it | 0 | |||||||||||||||||||||||||||
9 | Calibration | Yes | done | 3days | Yamamoto, Darkhan | 1 | 5 | 3 | 3 | 3 | 4/21~ | 4/21-25 | Remote work can be done with 1person at the control room. | ||||||||||||||||||||
10 | LSC and ASC sensing matrix | Yes | 4 | 2days | Nakano, Ushiba | 0 | 6/8~ | ||||||||||||||||||||||||||
11 | MICH contrast defect with MICH locked and FPMI locked | Yes | 4 | 1day | Nakano | 0 | 6/8~ | ||||||||||||||||||||||||||
12 | Noise budget | 3 | Shoda | 3 | |||||||||||||||||||||||||||||
13 | Line noise investigation for noise budget | Identify the line noises | No | 1 | |||||||||||||||||||||||||||||
14 | intensity noise, frequency noise, beam jitter projection measurement | 4 | Kokeyayama, Miyakawa | 5 | 0 | 6/8~ | |||||||||||||||||||||||||||
15 | Type Bp measurement with some restricted IFO | Partial | 1 | ~2days | Fabian | 0 | This is not a priority for the paper we are currently working on. | ||||||||||||||||||||||||||
16 | BS measurement with some restricted IFO like simple Michelson | Partial | 3 | ~2days | Fabian | 1 | 0 | This is not a priority for the paper we are currently working on. | |||||||||||||||||||||||||
17 | Measuremet of quality factors and damping recovery times using the BS suspension. | I'm guessing it might take 3 days but preparaion is sitll required. It might take a shorter time. | No | 3 | ~3 days | Fabian | 0 | 0 | 5 | 0 | 0 | 5/19~ | 5/21,22, 26-28 | ||||||||||||||||||||
18 | Type A measurement with some restricted IFO like Xarm | Partial | 1 | ~2days | Lucia | 0 | 5/19~ | 5/28 | |||||||||||||||||||||||||
19 | IP control upgrade (sensor correction, sensor blending) | No sensor correction is implemented in Type-B, which might be required for SRC lock. Also we would like to try low-frequency sensor blending to reduce the micro-seismic motion towards O4. | No | 3 | ~2days/sus/person | Shoda, Lucia?, (Terrence if it is after late May) | 5 | 0 | 2 | 0 | 2 | Controls for SRs might be essential for DRFPMI locking. It would be better to implement the sensor correction in BS and SRs at least before starting the DRFPMI lock trial. | |||||||||||||||||||||
20 | PEM injections | various acoustic injection test for writing the PEM paper | Yes | 4 and 3 | ~2day | Yokozawa, Wasshimi | 2 | 2 | 1 | 5 | 2 | 6/1~ | 6/5 | Acoustic injection to interesting places were completed. Remaining issue : Acoustic injection to all place for evaluating coupling function(LIGO rule is less than 10% for DARM displacement). Band limited acoustic injection to interesting places to evaluate frequency converted noise. Magnetic field injection(Lower motivation, but if required) | |||||||||||||||||||
21 | Mode content of AS (OMC cavity scan) | Yes | 4 | 1day | Aso, Kokeyama | 4 | 3 | 1 | 1 | 4 | 6/8~ | ||||||||||||||||||||||
22 | Finesse/loss measurement for X/Y arm | Installation of polarization optics to TRX and TRY necessary. Polarization effects should be correctly taken into account. | Yes | done | 1day | 0 | 4/21~ | ||||||||||||||||||||||||||
23 | 116.5 Hz, 127.7Hz and 256 Hz noise investigation | Those noises have coherence with ITMX/ITMY MN/IM PS signal, magnetometers. Unknown noise but large noise. PEM team want to investigate it before finishing O3 | Yes | 1 | 1 or 2 day | Yokozawa | 3 | 4 | 1 | 1 | 3 | Noise budget and line noise investigation. If you think we don't need to understand all line noise, please ignore it. | |||||||||||||||||||||
24 | Test of additional filters for the LVDT combiner | Check the performance of additional filters in the LVDT combiner for the BF damper using a Type-A tower. | No | 1 | 1 day | Takahashi, Miyo | 3 | 0 | |||||||||||||||||||||||||
25 | Make cable connection diagram (IOO, ALS, etc) | Making cable connection diagram for O3 (Miyo-san generated for Suspension) | 1 | 0 | |||||||||||||||||||||||||||||
26 | Lock acquisition related | Take the timeseries of lock acquisition, measure the average duration and probability of PRMI lock acquisition, investigation of the 3f signal pollution due to the DARM/CARM signal | Partial | 3 | 2 days | Nakano | 3 | 5 | |||||||||||||||||||||||||
27 | Fringe speed measurement | Measure the fringe speed. Just take the error signal timeseries of free swinging PRMI, arm cavities, and IMC. | Partial | 4 | 1day | Nakano | 1 | 5 | 6/8~ | We might need perform this measurement in stormy day and quiet day. | |||||||||||||||||||||||
28 | IFO characterization | Round trip loss of arm cavity, sideband PRG, mode healing effect | Partial | 3 | 1 week | Nakano | 5 | 3 | 5 | 4/21~ | 6/5 | Finesse, PRG measurement | |||||||||||||||||||||
29 | Noise budget of VIS local control | The noise budget of the local damping loop. Especially sensing noise of OpLevs, OSEMs, LVDTs, and photosensors | No | 4 | 3 day | Ushiba/Oshino | 5 | 5 | 6/1~ | 5/13-15, 6/1,4 | |||||||||||||||||||||||
30 | OMC PD ADC noise measurement | Disconnect the OMC PD from ADC and measure the ADC noise for OMC PC. If we can understand well, we can subract 60Hz noise by offline subtraction | No | 1 or 3 | 1day | Yokozawa | 2 | 3 | 1 | 1 | 3 | For offline subtraction. If you don't need to do offline subtraction, please ignore it. | |||||||||||||||||||||
31 | GRY investigation | No | 5 | 1day | Nakano? | ||||||||||||||||||||||||||||
32 | Test of ACC | Evaluate the modified ACC with LVDT sensor. | No | 3 | 2 days | Takahashi | 4 | ||||||||||||||||||||||||||
33 | |||||||||||||||||||||||||||||||||
34 | SRM/2/3 suspension update | control scheme update | No | 3 | 1week | Shoda+VIS | 5 | 1 | 1 | 6/15~ | |||||||||||||||||||||||
35 | PD replacement in OMC | change one of PD for OMC | No | 3 | 2weeks | OO | 5 | ||||||||||||||||||||||||||
36 | FFU operation and temp control | reclean and keep temperature | No | 3 | PEM | 5 | |||||||||||||||||||||||||||
37 | Spot adjustment on MCo | No | 3 | 1week | IO | 3 | |||||||||||||||||||||||||||
38 | |||||||||||||||||||||||||||||||||
39 | |||||||||||||||||||||||||||||||||
40 | |||||||||||||||||||||||||||||||||
41 | |||||||||||||||||||||||||||||||||
42 | |||||||||||||||||||||||||||||||||
43 | |||||||||||||||||||||||||||||||||
44 | |||||||||||||||||||||||||||||||||
45 | |||||||||||||||||||||||||||||||||
46 | |||||||||||||||||||||||||||||||||
47 | |||||||||||||||||||||||||||||||||
48 | |||||||||||||||||||||||||||||||||
49 | |||||||||||||||||||||||||||||||||
50 | |||||||||||||||||||||||||||||||||
51 | |||||||||||||||||||||||||||||||||
52 | |||||||||||||||||||||||||||||||||
53 | |||||||||||||||||||||||||||||||||
54 | |||||||||||||||||||||||||||||||||
55 | |||||||||||||||||||||||||||||||||
56 | |||||||||||||||||||||||||||||||||
57 | |||||||||||||||||||||||||||||||||
58 | |||||||||||||||||||||||||||||||||
59 | |||||||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||||
99 | |||||||||||||||||||||||||||||||||
100 |