1
KAGRA task list for post observation 2020/4/21~
2
3
Task namedescriptionUsing IFO (Yes/Partial/No)1:low,not remotable, 2 low,remotable, 3 high,not remotable, 4high,remotable, 5 maintenancetermassigned toPriority for O4 preparationPriority for observation paperPriority for VIS paperPriority for IOO paperPriority for PEM paperPriority for commissioning paperworking weekScheduled DateComments
4
Feasibility of locking DRFPMI Yes23weeksNakano52113
5
Scattered light (high frequency)Hammering test to IMM area, PR area, SR area(temprary), OMC area and EYA are were completed. C chamber, SRM, IA chambers is not completed.Yes11dayYokozawa31112For noise budget and understanding scattered light for O4
6
Scattered light (low frequency by swinging)Up converted scattering noise. Low frequency with large RMS makes upconverted scattered noise. We did'nt investigate yetYes23daysAkutsu3112
7
OMC chamber vibration RMS measurementRequested from Aso-san. To investigate the scattered noise inside the OMC chamber, PEM team will measure the vibration with various place.Yes11dayYokozawa23014For noise budget and understanding scattered light for O4
8
Fill the eigenfrequencies for Type-A suspensionhttps://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0111/T1911116/001/20191213tyamada_sumconCRYp20161025.pdf
Merit : Identification of the line noise sources for the sensitivity of this observation run.
(We can make following noise investigation https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11514)
Demerit : Those frequency may change in the future observation.
Yes4?Suggested by Yokozawa, but I want to ask someone to manage it. If nobody hand up, please delete it0
9
CalibrationYesdone3daysYamamoto, Darkhan153334/21~4/21-25Remote work can be done with 1person at the control room.
10
LSC and ASC sensing matrixYes42daysNakano, Ushiba06/8~
11
MICH contrast defect with MICH locked and FPMI locked Yes41dayNakano06/8~
12
Noise budget3Shoda3
13
Line noise investigation for noise budgetIdentify the line noisesNo1
14
intensity noise, frequency noise, beam jitter projection measurement4Kokeyayama, Miyakawa506/8~
15
Type Bp measurement with some restricted IFO Partial1~2daysFabian 0This is not a priority for the paper we are currently working on.
16
BS measurement with some restricted IFO like simple MichelsonPartial3~2daysFabian10This is not a priority for the paper we are currently working on.
17
Measuremet of quality factors and damping recovery times using the BS suspension.I'm guessing it might take 3 days but preparaion is sitll required. It might take a shorter time.No3~3 daysFabian005005/19~5/21,22, 26-28
18
Type A measurement with some restricted IFO like XarmPartial1~2daysLucia05/19~5/28
19
IP control upgrade (sensor correction, sensor blending)No sensor correction is implemented in Type-B, which might be required for SRC lock. Also we would like to try low-frequency sensor blending to reduce the micro-seismic motion towards O4.No3~2days/sus/personShoda, Lucia?, (Terrence if it is after late May)50202Controls for SRs might be essential for DRFPMI locking. It would be better to implement the sensor correction in BS and SRs at least before starting the DRFPMI lock trial.
20
PEM injections various acoustic injection test for writing the PEM paperYes4 and 3~2dayYokozawa, Wasshimi221526/1~6/5Acoustic injection to interesting places were completed. Remaining issue : Acoustic injection to all place for evaluating coupling function(LIGO rule is less than 10% for DARM displacement). Band limited acoustic injection to interesting places to evaluate frequency converted noise. Magnetic field injection(Lower motivation, but if required)
21
Mode content of AS (OMC cavity scan)Yes41dayAso, Kokeyama431146/8~
22
Finesse/loss measurement for X/Y armInstallation of polarization optics to TRX and TRY necessary. Polarization effects should be correctly taken into account.Yesdone1day04/21~
23
116.5 Hz, 127.7Hz and 256 Hz noise investigationThose noises have coherence with ITMX/ITMY MN/IM PS signal, magnetometers. Unknown noise but large noise. PEM team want to investigate it before finishing O3Yes11 or 2 dayYokozawa34113Noise budget and line noise investigation. If you think we don't need to understand all line noise, please ignore it.
24
Test of additional filters for the LVDT combinerCheck the performance of additional filters in the LVDT combiner for the BF damper using a Type-A tower.No11 dayTakahashi, Miyo30
25
Make cable connection diagram (IOO, ALS, etc)Making cable connection diagram for O3 (Miyo-san generated for Suspension)10
26
Lock acquisition related Take the timeseries of lock acquisition, measure the average duration and probability of PRMI lock acquisition, investigation of the 3f signal pollution due to the DARM/CARM signalPartial32 daysNakano35
27
Fringe speed measurementMeasure the fringe speed. Just take the error signal timeseries of free swinging PRMI, arm cavities, and IMC.Partial41dayNakano156/8~We might need perform this measurement in stormy day and quiet day.
28
IFO characterizationRound trip loss of arm cavity, sideband PRG, mode healing effectPartial31 weekNakano5354/21~6/5Finesse, PRG measurement
29
Noise budget of VIS local controlThe noise budget of the local damping loop. Especially sensing noise of OpLevs, OSEMs, LVDTs, and photosensorsNo43 dayUshiba/Oshino556/1~5/13-15, 6/1,4
30
OMC PD ADC noise measurementDisconnect the OMC PD from ADC and measure the ADC noise for OMC PC. If we can understand well, we can subract 60Hz noise by offline subtractionNo1 or 31dayYokozawa23113For offline subtraction. If you don't need to do offline subtraction, please ignore it.
31
GRY investigationNo51dayNakano?
32
Test of ACCEvaluate the modified ACC with LVDT sensor.No32 daysTakahashi4
33
34
SRM/2/3 suspension updatecontrol scheme updateNo31weekShoda+VIS5116/15~
35
PD replacement in OMCchange one of PD for OMCNo32weeksOO5
36
FFU operation and temp controlreclean and keep temperatureNo3PEM5
37
Spot adjustment on MCoNo31weekIO3
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100