PHOOPF: 8th Floor Optoelectronic Processing Facility Equipment Maintenance Downtime Log
2
3
Color Code DefinitionsDOWN - Equipment not usable
4
UP - Equipment is operational
5
Partially Operational - Equipment may be usable contact Lab Manager
6
7
DateEquipmentStatusFollow on NotesSystem Update
8
9
10
02/05/13Reactive Ion EtcherPartially OperationalForeline fomblin pump only pump down to 1000mT. Place backup non fomblin pump for halocarbon and pure gases only. NO Cl2 gas to be used until fomblin pump is repairParts on Order
11
01/29/13CHA EvaporatorDOWNTroubleshooting no HV to e-gun. Problem HV power supply.Service in process
12
12/06/12Edwards Thermal EvaporatorUPTMP shut down, problem TMP keeps shutting down. Problem is due to vacuum leak in the system. Leak check with helium leak detector, problem found in electrical feed through, remove and blanked port off, pressure 1.0x10-7 torr. Service Complete
13
11/26/12Edwards Thermal EvaporatorDOWNTMP shut down, problem TMP keeps shutting down when taking to pump down system. Service in process
14
10/19/12Deep Silicon ICP Reactive Ion EtcherUPSerial com fault and main process chamber leak resolvedService Complete
15
09/11/12Headway Photoresist SpinnersUPPurchased NEW controller. Old controller repair and store away as backupService Complete
16
08/22/12Headway Photoresist SpinnersDOWNspinner controller sent out for repairs again. Someone started Recalibration mode and not completed it cause controller to lockup. Keypad not active.Service in process
17
08/21/12Headway Photoresist SpinnersUPSpinner controller installed, recipe reloaded, test - okService Complete
18
08/06/12Headway Photoresist SpinnersDOWNSpinner controller sent out for repairsService in process
19
08/03/12Heidelberg Direct Write DWL66UPproblem with cable to electronics rack - AODIM internal fixed - Keith Calibrated 10mm and 2mm Service Call Completed
20
08/01/12Deep Silicon ICP Reactive Ion EtcherDOWNEdwards roughing pump installed, but problem with main PC computer and serial com facultService in process
21
07/25/12Heidelberg Direct Write DWL66DOWNFTP and laser output problem.Service in process
22
06/27/12Heidelberg Direct Write DWL66UPelectronic rack installed by Kris and test system - okService Call Completed
23
05/22/12Deep Silicon ICP Reactive Ion EtcherDOWNedwards roughing sent back for overhaul Service in process
24
05/07/12Heidelberg Direct Write DWL66DOWNwater leak damage electronic rack, rack sent back to Germary for repairs.Service in process
25
02/17/12Edwards EBeam EvaporatorUPReplaced Heat Exchanger, cryopump operational Service Complete
26
02/15/12Edwards EBeam EvaporatorDOWNCryopump fail and regen in progress. Need to replace Heat Exchanger - cryopump compressor over heating.Service in process
27
02/13/12Reactive Ion EtcherUPReplaced D40B pump with rebuilt D25BCS pump with filter and formblin oilService Complete
28
12/21/11Reactive Ion EtcherPartially OperationalTemporary pump put on (D40B) non formblin oilParts on Order
29
12/18/11Reactive Ion EtcherDOWNMechanical pump failed, send out for repairsService in process
30
12/16/11Deep Silicon ICP Reactive Ion EtcherUPReplaced MKS pressure gauge sensorService Complete
31
11/22/11Deep Silicon ICP Reactive Ion EtcherPartially OperationalProblem to Gate Time Out Fault determine. Need to order part to fix this problem.Parts on Order
32
10/27/11Rapid Thermal AnnealerUPCoolant lines flush and test okService Call Completed
33
10/20/11Rapid Thermal AnnealerDOWNWater coolant flow problemService in process
34
10/19/11Edwards Thermal EvaporatorPartially OperationalBacking Valve FaultyParts on Order
35
09/20/11Deep Silicon ICP Reactive Ion EtcherDOWNGate Time Out FaultParts on Order
36
06/21/11Deep Silicon ICP Reactive Ion EtcherUPGate Valve installed and system check out - operationalService Complete
37
04/26/11Deep Silicon ICP Reactive Ion EtcherDOWNLoad Lock Gate Valve out for repairsService in process
38
12/20/10Reactive Ion EtcherUPRepair pump installedService Complete
39
11/22/10Reactive Ion EtcherDOWNMechanical pump leaking oil, send out for repairsService in process
40
11/30/10Thermal Oxide FurnaceUPpower supply installed and unit operationalService Complete
41
11/16/10Rapid Thermal AnnealerUPWater leak repair and quartz chamber cleaned.Service Complete
42
11/10/10Rapid Thermal AnnealerDOWNWater leak in cooling line to front door. Parts on Order
43
11/02/10Heidelberg Direct Write DWL66UPReplace user PC with Dell and reloaded software and drivers. Calibrate and testService Complete
44
10/29/10Thermal Oxide FurnaceDOWNError E-02 Parts on Order
45
10/16/10Heidelberg Direct Write DWL66DOWNUser PC hard drive crashService in process
46
10/13/10Headway Photoresist SpinnersUPHeadway to replace controller - no chargeService Complete
47
10/07/10Headway Photoresist SpinnersDOWNWill not spin Service in process
48
09/29/10Deep Silicon ICP Reactive Ion EtcherUPVAT Gate load lock interlock problem. Call service tech support for help and scheduling service engineer for field service repair. Problem was bad gate valve solenoid.Service Call Completed
49
09/26/10Headway Photoresist SpinnersUPService Complete
50
09/24/10Sharon EBeam EvaporatorUPService Complete
51
09/21/10Dicing SawUPDrain installed and tested.Service Complete
52
09/21/10Headway Photoresist SpinnersDOWNController problem sent out for repairs.Service in process
53
09/21/10Sharon EBeam EvaporatorDOWNRoughing pump problemService in process
54
09/13/10Edwards Thermal EvaporatorUPInstall roughing pump and test system out.Service Complete
55
08/31/10Deep Silicon ICP Reactive Ion EtcherUPService Complete
56
08/31/10Deep Silicon ICP Reactive Ion EtcherDOWNVAT Gate load lock interlock problem. Call service tech support for help and scheduling service engineer for field service repair.Service in process
57
08/20/10SputtererUPService Complete
58
08/20/10Edwards Thermal EvaporatorDOWNRoughing pump bearings making very loud noises. Shut tool down and send pump out for repairs.Service in process
59
08/19/10Deep Silicon ICP Reactive Ion EtcherDOWNRan out of SF6 gas Parts on Order
60
08/16/10Reactive Ion EtcherUPService Complete
61
08/16/10SputtererDOWNHeater, RF rotational stage, throttle valve installation.System Hardware Upgrade
62
08/13/10Reactive Ion EtcherDOWNNo nitrogen gas for tool.Parts on Order
63
08/04/10Reactive Ion EtcherUPMaintenance Complete
64
08/04/10Dicing SawPartially OperationalWaiting for Drain to be install by BU plumbers.Service in process
65
07/28/10Reactive Ion EtcherDOWNPM and Endpoint detection system upgrade.System Hardware Upgrade
66
07/23/10Dicing SawDOWNOld dicing saw decommission and New dicing saw installedService in process
67
06/24/10Deep Silicon ICP Reactive Ion EtcherUPPump return and installed, check system out - operational.Service Complete
68
06/11/10Deep Silicon ICP Reactive Ion EtcherDOWNBooster pump leaking oil, shut down tool, disconnect pump and ship out for repairs.Service in process
69
06/08/10Deep Silicon ICP Reactive Ion EtcherUPBuild compress air system repair and tool is operational again.Service Complete
70
05/12/10Heidelberg Direct Write DWL66UPLaser Diode Install and system check out - operationalService Complete
71
05/10/10Heidelberg Direct Write DWL66Partially OperationalLaser Diode ReplacementService in process
72
05/05/10Deep Silicon ICP Reactive Ion EtcherDOWNProblem with building compress air system.Service in process
73
04/13/10Thermal Oxide FurnaceUPBattery install and microcontroller tested at the factory. Microcontroller installed and furnace tested - ok.Service Complete
74
03/30/10Thermal Oxide FurnaceDOWNNeed to order battery for the microcontroller.Parts on Order
75
02/12/10VASE EllipsometerUPReplaced Chopper motor and driverService Complete
76
02/11/10Rapid Thermal AnnealerUPReplaced Cooling Fan and Magnetic on water interlock switch. Service Complete
77
02/04/10VASE EllipsometerPartially OperationalChopper motor and/or driver board partially working. Have to reboot entire system 3 to 5 times
to get system to operate properly.
Service in process
78
02/04/10Sharon EBeam EvaporatorDOWNCryopump compressor damage.Parts on Order
79
02/02/10Rapid Thermal AnnealerPartially OperationalCooling Fan and water interlock working partiallyParts on Order
80
02/01/10Edwards EBeam EvaporatorUPRegen completedService Complete
81
01/29/10Edwards EBeam EvaporatorDOWNCryopump fail and regen in progress.Service in process
82
01/21/10CHA EvaporatorUPService Call Completed
83
01/19/10CHA EvaporatorDOWNError message - ERR-GLASSMAN PS-OFFLINE, call tech support for assistant.Service in process
84
01/08/10Rapid Thermal AnnealerUPService Complete
85
01/05/10Rapid Thermal AnnealerDOWNWater interlock problem, call technical support.Service in process
86
12/07/09Deep Silicon ICP Reactive Ion EtcherDOWNDefective DI water pump on chiller. Part on order.Parts on Order
87
12/04/09Reactive Ion EtcherUPRebuilt pump installed and test run overnight.Service Complete
88
12/04/09SputtererPartially OperationalAnother RF matching network unit defective and sent to BU EDF for repairs, lead time on parts is
4 weeks.
Parts on Order
89
11/17/09SputtererPartially OperationalRF matching network unit defective and sent back for repairs, lead time is 3-4 weeks.Service in process
90
11/04/09Edwards EBeam EvaporatorUPCryopump regen completely and cryopump temperature at 10K.Service Complete
91
11/02/09Edwards EBeam EvaporatorDOWNCryopump fail and regen in progress.Service in process
92
11/02/09Deep Silicon ICP Reactive Ion EtcherUPRoughing pump repair and valve 1 did not close error message problem resolved.Service Complete
93
09/30/09Edwards EBeam EvaporatorUPCryopump regen completely and cryopump temperature at 10K.Service Complete
94
09/25/09Edwards EBeam EvaporatorDOWNCryopump fail and regen in progress.Service in process
95
09/24/09MA6 Mask AlignerUPInstall new BSA motorService Complete
96
09/15/09MA6 Mask AlignerPartially OperationalService engineer visit routine PM found that BSA on the left hand side is not functioning. Need to order new BSA motor.Parts on Order
97
08/29/09Heidelberg Direct Write DWL66UPIP address fixed. Everything is working.Service Complete
98
08/21/09Heidelberg Direct Write DWL66DOWNComputer is not converting file and sending to other computer.Service in process
99
08/04/09Deep Silicon ICP Reactive Ion EtcherDOWNTool circuit breaker tripped. Booster pump water coolant lines blocked. On 09/18/09 pump had to be sent out for repairs.Service in process