T&C Requirement Sheet of
Gas Suppression System (GSS) Package
2
Sr. No.Test DescriptionFATSAT
3
Gas Suppression System (GSS) Package
4
1Physical inspection and specs. Verification - This has to be carried out as per the Pre- Cx check sheet given in the commissioning plan/method statement.ra
5
2Nitrogen Pressure Test - Post installation of piping works, Pressure test has to be done as per commissioning plan/method statement.ra
6
3Room Integrity test - Post completion of all civil works and installation of all other services room has to positively & negatively pressurized and tested with room integrity test equipment setup. Leakage should not be observed more than the calculated permissible leakage as per O&M.ra
7
4Verification of GSS system Smoke detector - Smoke detection system has to be checked as per the designed logic or Cause & effect matrix.ra
8
5Verification of Abort switch / Manual Release Switch - While verifying this switch ensure solenoid actuator is kept disconnected from cylinders.ra
9
6Integration of Solenoid Actuators & smoke detection system - While Verifying the integration of solenoid actuators and smoke detection system, actuator must be kept disconnected from cylinders. Verify the programming as per Cause & effect matrix.ra
10
7Integration of GSS Fire Panel with Main Fire Panel and BMS system - Verify any Alarm or fault on GSS fire panel to be indicated on Main fire Panel. Verify the monitoring of GSS in BMS system as per I/O summary.ra
11
12
Test Instrumentation Required/Considered For SAT
13
Sr. No.DescriptionQty.
14
1True RMS Multi-meter1 No.
15
2Pressure Gauges1 No.
16
3Room Integrated Test kit1 No.
17
4Aerosol Spray1 No.
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100