| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | priority | component | Task | Date | People | Status | ||||||||||||||||||||
2 | 1 | groundwater | Incorporate GW into Water Stress model | 4/12/2016 | James, Laureline | DONE | ||||||||||||||||||||
3 | 1.1 | optimization | Codify matrix generation approach | 4/5/2016 | James | DONE | ||||||||||||||||||||
4 | 1.5 | configuration | Read in parameters from config. file; allow others to install | 4/19/2016 | James | DONE | ||||||||||||||||||||
5 | 1.55 | waternetwork | return flow | 5/17/2016 | James | DONE? | ||||||||||||||||||||
6 | 1.6 | code | yaml configuration file | 5/31/2016 | James | DONE | ||||||||||||||||||||
7 | 1.7 | validation | water draws validation | Carolyn, James | ||||||||||||||||||||||
8 | 1.7 | validation | validate agricultural production from weather and irrigation | James | ||||||||||||||||||||||
9 | 1.8 | urban demand | exogenous modeled demands | 8/5/2016 | Maura | statistical analysis is done; incorporation into model is in progress | ||||||||||||||||||||
10 | 1.8 | code | current situation | 5/1/2016 | James, Laureline, Siyan, Maura, Carolyn | VERSION 1 | ||||||||||||||||||||
11 | 2 | optimization | optimization over individual climate runs | Laureline | NEED VIC RUNOFF | |||||||||||||||||||||
12 | 2.1 | reservoirs | Incorporate reservoir for storage | 7/1/2016 | James, Ipsita, Laureline, ... | DONE | Naresh reservoir spreadsheet + USGS | |||||||||||||||||||
13 | 2.11 | reservoirs | Check that optimization uses storage to buffer uncertainty | 7/8/2016 | James | DONE | ||||||||||||||||||||
14 | 2.2 | exogenous | Exogenous industrial and environmental static demands | 7/21/2016 | James, Maura | industrial DONE | ||||||||||||||||||||
15 | 2.3 | groundwater | incorporate modflow subsurface parameters | 5/1/2016 | Laureline, Tess | DONE | ||||||||||||||||||||
16 | 2.35 | calibration/validation | groundwater head change | 7/5/2016 | Laureline,Tess | |||||||||||||||||||||
17 | 2.4 | agriculture | optimization using multiple months | 7/28/2016 | James | |||||||||||||||||||||
18 | 2.4 | validation | comparison between sector-specific opt. and simulation | 8/5/2016 | James | |||||||||||||||||||||
19 | 3 | optimization | optimization over uncertain climate | |||||||||||||||||||||||
20 | 3 | optimization | monthly version of model | 5/31/2016 | James | DONE | ||||||||||||||||||||
21 | 4 | surface water | paleo monthly disaggregation | 6/1/2016 | Michelle | |||||||||||||||||||||
22 | 5 | energy | Grid for distribution and losses | Manu S., Siyan | ||||||||||||||||||||||
23 | 5 | energy | water demand for energy (return flow, consumption, ...) | |||||||||||||||||||||||
24 | 5 | energy | energy demand model | Siyan | ||||||||||||||||||||||
25 | 6 | water rights | Colorado compacts | Adam | ||||||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | low | groundwater | 3 layers aquifer contus wide | 8/12/2016 | Laureline | in progress | ||||||||||||||||||||
28 | low | infrastructure | pumping facilities | Laureline | ||||||||||||||||||||||
29 | low | energy | bio fuels | |||||||||||||||||||||||
30 | low | industrial demand | incorporate two sectors | |||||||||||||||||||||||
31 | low | infrastructure | treatment facilities | Carolyn, Laureline | ||||||||||||||||||||||
32 | low | infrastructure | water reuse | Carolyn | ||||||||||||||||||||||
33 | low | optimization | capacity expansion | |||||||||||||||||||||||
34 | low | optimization | cost model (regional variability, representation of cost or price, ...) for allocation | Ipsita, Laureline | ||||||||||||||||||||||
35 | low | optimization | uncertainty tail risk | |||||||||||||||||||||||
36 | low | optimization | add water rights constraints in allocation | |||||||||||||||||||||||
37 | low | reservoirs | release policies | first invitation to talk | Adam, bureau rec pers and army corp | |||||||||||||||||||||
38 | low | snowpack | explicit component (sim to reservoir) | |||||||||||||||||||||||
39 | low | water | water quality consideration | |||||||||||||||||||||||
40 | low | code | a five county example for people to play with and test future developments | |||||||||||||||||||||||
41 | low | water rights | codification of the legal input in the model | Adam, James, Michelle | ||||||||||||||||||||||
42 | z | app/game | game model simwater | 4/1/2018 | ||||||||||||||||||||||
43 | literature | look up Terry Fulp model of allocation | James | |||||||||||||||||||||||
44 | literature | look for elasticities and cross-elasticities and demand numbers/models for all ag crops | ||||||||||||||||||||||||
45 | low | waternetwork | missing canals - finish the work | Laureline + interns ? | partly done | |||||||||||||||||||||
46 | low | infrastructure | cost model for capacity expansion | |||||||||||||||||||||||
47 | low | commodities | demand model or exogenous demands ? trades with other countries ? | James + Manu's colleague | ||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |