BUKU PEMBANTU KAS TUNAI
15
BULAN JUNI 2026
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
PROGRAM REVITALISASI SATUAN PENDIDIKAN
32
SD ISLAM SAINS AL-AZAMI CIANJUR
33
TAHUN 2026
34
35
36
37
38
39
40
41
42
43
44
KEPALA SEKOLAH
:
MUHAMAD RIDLWAN, S.SKI
45
BENDAHARA:
-----------------------
46
NAMA SEKOLAH
:
SD Islam Sains Al-Azami
LAPORAN BULAN KE
: I (SATU)
47
NPSN:70039520
BULAN
: JUNI 2026
48
DESA:CIKAROYA
49
KECAMATAN:
WARUNGKONDANG
50
KABUPATEN:CIANJUR
51
52
NOTANGGAL NO BUKTIURAIANPENERIMAAN PENGELUARANSALDO
53
(Rp)
54
A17/06/202601/UM/VI/2026Terima Kas Tunai Penarikan dari bank Mandiri 357.590.000 357.590.000,00
55
56
122/06/202601/UK/VI/2026
Transportasi Pengambilan Uang Ke Bank
57
•Bendahara 50.000 50.000 357.540.000
58
59
222/06/202602/UK/VI/2026
Belanja Konsumsi Rapat P2SP dan Panitia Pembangunan
60
•Snack 5Dus@ 10.000 = 50.000
61
•Nasi Kotak5Dus@ 20.000 = 100.000
62
Jumlah 150.000 150.000 357.390.000
63
64
322/06/202603/UK/VI/2026
Dibayar Biaya Transportasi Survey Harga Ke Toko material
65
•
Ketua P2SP, Logistik dan Bendahara, Ket. Pelaksana
150.000 150.000 357.240.000
66
67
68
422/06/202604/UK/VI/2026
Jasa Perencanaan
69
•
Biaya / Honoraium Jasa Perencanaan
12.493.284 12.493.284 344.746.716
70
71
522/06/202605/UK/VI/2026
Belanja Baner Papan Informasi Kegiatan
72
•
Biaya Cetak Baner Papan Informasi
1paket@ 400.000 = 400.000
73
Jumlah 400.000 400.000 344.346.716
74
75
622/06/202606/UK/VI/2026
Pembelian Barang K3
76
•Helm Proyek17bh@ 60.000 = 1.020.000
77
•Rompi Proyek17bh@ 40.000 = 680.000
78
•Sepatu Boot20bh@ 120.000 = 2.400.000
79
•Masker5Pack@ 50.000 = 250.000
80
•
Sarung tangan
5Pack@ 30.000 = 150.000
81
Jumlah 4.500.000 4.500.000 339.846.716
82
83
722/06/202607/UK/VI/2026
Pembelian Barang Perlengkapan
84
•Torn Air2bh@ 1.900.000 = 3.800.000
85
•Seleang Air2Roll@ 500.000 = 1.000.000
86
•Ember50bh@ 15.000 = 750.000
87
•Cangkul10bh@ 100.000 = 1.000.000
88
•Roda Sorong4bh@ 800.000 = 3.200.000
89
•Benang1Pack@ 36.870 = 36.870
90
•Air2000ltr@ 590 = 1.180.000
91
Jumlah 10.966.870 10.966.870 328.879.846
92
93
94
822/06/202608/UK/VI/2026
Belanja Bahan Bangunan Ke TB Sinar Baru
95
•Semen Portland100Zak@ 76.000 = 7.600.000
96
•Pasir Pasang81m3@ 307.098 = 24.874.938
97
•Balok kayu kelas II2m3@ 2.303.235 = 4.606.470
98
•Batu Belah55m3@ 300.000 = 16.500.000
99
•Bata Merah35243bh@ 1.015 = 35.771.645
100
•Pasir Beton39m3@ 350.000 = 13.650.000