cart length= 99"
5
Panel SizesQnty moldsConc/mold
Total wt conc
sq ft/pieceTotal sq ftExp Steels$/SFSales $LaborTotal minInches rebarTotal rebarMold sizeTotal mold sfmold sizemold/cartcarts #
cart dimen
6
12x1610212101.33131010$1331212000285285015x19 8290x19
7
18x16230602.00449$3615300039979821x192142x192 27x19
8
24x161604165602.674273208$3,418152400005138208027x1953227x9554x19sp
9
36x1612536364.00483610$4801821660720741889239x195339x95
10
48x8244882.675812$64224480160561112251x112151x22
11
60x88554403.33274013$34724192100800693554463x112463x22
12
72x810656504.00406013$520282801201200825825075x112575x22
13
24x12wf232642.004210$4016320040581027x1500
14
36x12wf248963.006411$66204060120585117039x154166x30
15
44x12wf2601203.677611$81224480160705141047x1500
16
48x12wf2681364.008811$88244888176765153051x154198x30
17
86x12df21102207.17141414$20136721623241335267089x15
18
94x12 df21302607.83161615$23540801803601455291097x15
19
ext quoin11687484.00441125$1,1004549580880405445527x19
20
int quoin147810924.44624223$1,43140560841176435609029x19
21
8x12212240.671210$1312240016533011x15
22
23
Total 243 Pounds 11404727583$8,25246776076130911
24
cubic ft79Hours =77.95506.3333333909.1041667
25
cubic yds3Hours/shift725.316666671.249807151
26
Cost of concrete/yd =
$160No. workers=11.13571429$10
27
total con480$/hr$25$260
28
Helix fiber $39
12 people x 8
96
Two people 4 hours to cut
29
Expanded steel =
5
Total wages=
$2,400
8 hours total to cut rebar
30
$/sheet =40200
31
Expanded cost =
$200
32
7 hours for 5 sheets
total costs=$4,042
33
Labor to cut 600 pieces=
200Profit =$4,210
240 days operation per year
profit $1,010,429.87
34
35
Styrofoam $/cubic foot=
2
36
Cubic ft styro =
31.45931034
37
Styro cost =$63118.3215957280
38
Hours to cut=
7
39
Wages =200
40
If cellular concrete is used instead, one sack portland makes 10 cubic feet with a 0.5 water cement ratio and addition of foam
41
12x1618x1624x1636x1648x860x872x824x12wf36x12wf44x12wf48x12wf86x12df94x12dfext quoinint quoin8x12
42
Labor processes starting from de-molding to refilling
43
1. Extract cart five molds from consolidation area
202020202020202020202020202020203205.3
44
2. Remove ratchet strap
666891012689401518302082113.5
45
3. Hang ratchet strap on cart hooks
555577955771010202051322.2
46
4. Place mold on removal jig
8557891056782028202441742.9
47
5. Remove screws holding expanded steels
8812182430360618244854202463365.6
48
6. Remove waffle jig
10810152025308152832405012010055168.6
49
7. Place waffle jig on cart hook
556812141681012132025303052193.7
50
8. Using removal jig, remove one side
12151722262830141620223032303083525.9
51
9. Place mold side on cart shelf
67891011127810121416303071973.3
52
10. Remove panel from mold
89101216182091214162530303052644.4
53
11. Place panel on conveyor
86789101167891214202051602.7
54
12. Clean mold
3032344050606634404648809060060030188031.3
55
13. Apply release
2030344050606634404648809060060030186831.1
56
14. Reinstall mold side
2010121420222410121416303660060020146024.3
57
15. Install ratchet strap
1214161822243012162224283040040012108018.0
58
16. Place truing jig into mold
68101416182010141618202212012084407.3
59
17. Tighten ratchet strap
1012141618202210121214161812012084427.4
60
18. Inspect mold accuracy
6810121416188101214202418018045368.9
61
19. Remove truing jig
101214161820221214161820226060103445.7
62
20. Place mold on cart
88101214161881012141618202062103.5
63
21. Take cart to pouring area
121416183036401416182030364040123926.5
64
22. Assemble waffle jig
30303642809010030364850809018018030113218.9
65
23. Place on scale
101214162022241012141618202424102664.4
66
24. Fill with concrete
68101216182081012143036240200664610.8
67
25. Move to vibrator
88101214161881012141618202082123.5
68
26. Vibrate waffle into mold
80101214161881214162024204082404.0
69
27. Secure waffle
1010121416182010141618202262082343.9
70
28. Remove to cart or conveyor
89101214161881214162430304082694.5
71
29. Store cart for curing
3036405060708036405060708080803089214.9
72
73
340355418502647740830358443547641872100337103692326
74
Minutes5.75.97.08.410.812.313.86.07.49.110.714.516.761.861.55.4
75
hours all molds
0.940.0318.581.670.361.642.310.200.250.300.360.480.5611.3414.360.18
76
53.56
77
12x1618x1624x1636x1648x860x872x824x12wf36x12wf44x12wf48x12wf86x12df94x12dfext quoinint quoin8x12
78
79
80
Size needed for one hundred million dollars per year sales
81
82
Sales per unit quantity of molds from above =
$8,252
83
100000000 revenue goal
84
Number of units =
12,118
85
two shifts per day
6059
86
square feet space needed per unit
1818
87
88
Assume 120' x 60' building = 7200 sq ft
89
90
One building can produce =
3.959331313
Say 4 units
91
If two shifts per day then 8 units per day
92
240 days annual production, number of units produced =
1920
93
94
Number of producing plants =
6.311506047
95
96
Assume 2500 sq ft homes
97
Rule of thumb, 3.3 sq ft of panel per sf floorplan
98
8250
sf panel per home
99
100
9776196
sq ft of panel produced by seven plants, two shifts per day, over 240 days