1 | Biogas from Anaerobic Digestion V3 | Methodology ID: | RIV-ENGY-01-ADGAS-V3.0 | |||||||||||||||||||||||
2 | Public consultation collected comments and responses | Public Consultation period: | May 28th 2024- June 28th 2024 | |||||||||||||||||||||||
3 | Author | Comment | Type | Riverse response | Any change made? | Status | ||||||||||||||||||||
4 | Theophyle Mini- Carbonapp | I used to do a "sustainability calculation" when I was trading waste : the fuel consumed for transport should ideally be lower than 1% of the bioCNG potential of the full truck: YES/NO assumption ex: truck of 25 tons of beetpulp (100Nm3CH4/t) -> 1% = 20kg of bioCNG (1Nm3CH4= 0,8kg) = 80km | Technical | Thank you for this interesting reference value. However for the purpose of this qualitative ESDNH assessment, we prefer to not add calculations. We have reduced the reference transport distance to 100 km based on other comments. | No | Validated | ||||||||||||||||||||
5 | Theophyle Mini- Carbonapp | expanding feedstock collection network should be detailed with an example | Technical | We have removed this as an example of investment. | No | Validated | ||||||||||||||||||||
6 | Theophyle Mini- Carbonapp | financial barrier : operating at loss only ? Ask for the initial business plan delivered to the banks and compare the real end year results (gain & losses) | Technical | We added the following text in bold: Financial barrier: financial analysis demonstrating that the project is not financially viable, evidenced by net cash being lower than the working capital requirements, or proof that the project is not meeting the projected financial targets in the business plans and loan documents... | Yes | Validated | ||||||||||||||||||||
7 | Theophyle Mini- Carbonapp | The carbon storage through cover cropping should not be calculated, cover crops should remain co-benefits only (same for digestate) | General | Agreed, carbon storage from cover crops is not accounted for in GHG reduction and carbon credit issuance. It is only a supplementary, qualitative, co-benefit information. | No | Validated | ||||||||||||||||||||
8 | Theophyle Mini- Carbonapp | hierarchy of recycling : manure > waste > by-products > cover crops > dedicated crops | General | We don't understand the suggestion here. | No | Validated | ||||||||||||||||||||
9 | Theophyle Mini- Carbonapp | Digestate is not sold | Editorial | We changed this to "Amount of digestate applied to soils" | Yes | Validated | ||||||||||||||||||||
10 | Theophyle Mini- Carbonapp | The total amount should be reduced by the amount of fertilizer from animal manure that was already spreaded and the chemical fertilizer initially used for the first cover crops the year before the first injection | Technical | This is the case. This section mentions the project scenario avoided fertilizer, not the net project avoided fertilizer, because indeed the baseline scenario is credited with avoiding some fertilizer also. | No | Validated | ||||||||||||||||||||
11 | Theophyle Mini- Carbonapp | Initial methane leakage from slurry pits should be assessed and compared to methane avoidance thanks to the biogas project. Every slurry / digestate storage pit should be covered hermetically (like with Nenufar). Using more manure and less culture :ere is the real additionnality. | General | This section refers to market/activity/indirect leakage, not direct leakage/losses of methane from the process. Methane losses as described in the comment are treated in the GHG reduction quantification section. | No | Validated | ||||||||||||||||||||
12 | Theophyle Mini- Carbonapp | A biogas plant not using slurry from his farms and feeding crops (dedicated or cover) should not be eligible. Same for biogas plant with non hermetic storage pits | Technical | It's true that using manure/slurry instead of cultivated crops is environmentally preferable, but we chose not to create a strict threshold/requirement here, and instead 1) added this as a risk to consider in Environmental and Social Do No Harm, and 2) presented a detailed example in the text of how projects are effectively penalized, and issued less credits, when they use crops instead of manure/waste. Regarding hermetic covers, sites without such covers are still eligible but they receive far fewer carbon credits, because extra project emissions from methane losses are accounted for the project. So rather than disquality such projects, they are effectively penalized for this design. | Yes | Validated | ||||||||||||||||||||
13 | Theophyle Mini- Carbonapp | the external volume is the calculate the concrete volume used -> the effective digestion volume give you the real digestive capacity | General | Indeed we are using this data point to extrapolate infrastructure amounts and impacts. | No | Validated | ||||||||||||||||||||
14 | Theophyle Mini- Carbonapp | Add a common use of biogas : bioCNG for mobility | Editorial | Okay added. | Yes | Validated | ||||||||||||||||||||
15 | Theophyle Mini- Carbonapp | Biogas plant can be in liquid or solid phase, thus digestate will be mainly solid or liquid | Editorial | Okay removed the liquid specification. | Yes | Validated | ||||||||||||||||||||
16 | Theophyle Mini- Carbonapp | LCA of bioCNG : https://www.gaz-mobilite.fr/actus/retrofit-biognv-filiere-presente-livre-blanc-3573.html | General | Thank you, we will keep this in mind when a project comes to us that uses biogas for bioCNG. For now, we have only elaborated calculations and models for the most common use of biogas in france. | No | Validated | ||||||||||||||||||||
17 | Theophyle Mini- Carbonapp | Anaerobic digestion occurs in liquid or solid phase | General | Don't understand the suggestion being made. | No | Validated | ||||||||||||||||||||
18 | Theophyle Mini- Carbonapp | compressing biomethane and distributing bioCNG directly on farm should be eligible as well | General | Added this as an option. | No | Validated | ||||||||||||||||||||
19 | Theophyle Mini- Carbonapp | Project developper should respect the local regulation (ICPE 2781, irrigation quotas, nitrates directive...) to apply to carbon certification | General | Added requirement in paragraph 2.5.2 "Projects must follow all European, national, and local environmental regulations related to biogas production related to, for example, digestion, feedstock storage, feedstock sourcing, digestate storage, and digestate spreading." | Yes | Validated | ||||||||||||||||||||
20 | Theophyle Mini- Carbonapp | a maximum of 10% of dedicated crops or 50% of intermediate crops (CIVEs) | Technical | See response to comment above (row 12). | No | Validated | ||||||||||||||||||||
21 | Theophyle Mini- Carbonapp | maximum distance transport for external feedstock should be less than 200km, otherwise it competes with other project that loose their local feedstock | Technical | Yes we reduced this amount, and we changed this to 100 km based on other feedback. | Yes | Validated | ||||||||||||||||||||
22 | Theophyle Mini- Carbonapp | Methane leaks from digestion process and storage facilities (non hermetic))) | Editorial | Okay added. | Yes | Validated | ||||||||||||||||||||
23 | Theophyle Mini- Carbonapp | will landfill biogas collection and upgrading be part of a specific simplified method? | General | Yes it would be part of a separate methodology. | No | Validated | ||||||||||||||||||||
24 | Deboshmita Dey- VNV Advisory | As per table 1 (page 8), projects may use waste from agro-industrial processes as feedstock inputs. Can Pressmud - An industrial waste from sugar mills be eligible to apply this methodology? Every 100 tonnes of sugarcane crushed about 3 tones of pressmud cake is left behind as by-product which can be used to produce biogas. | Technical | Yes this would be an eligible waste feedstock. | No | Validated | ||||||||||||||||||||
25 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | nice ! | General | Thank you! | No | Validated | ||||||||||||||||||||
26 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | possible to have a pre-filled template ? | General | The regulatory surplus analysis at the European level will be pre-filled. Project Developers must fill in the rest of the template. Examples of filled templates are available to Project Developers upon request. | No | Validated | ||||||||||||||||||||
27 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | Is the business-plan produced by a consulting engineer not a sufficient proof ? | General | A business-plan produced by a consulting engineer is sufficient proof for validaiton. However once the project begins and verificaiton is done, updated audited financial documents are required to prove that the initial business plan included reasonable data. | No | Validated | ||||||||||||||||||||
28 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | what is considered as operating at loss ? | General | Negative cash flow. We added the specification that projects may also use proof that the project is not meeting the projected financial targets in the business plans and loan documents. | No | Validated | ||||||||||||||||||||
29 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | no double counting for credit carbons but the co-benefits can serve to obtain credits carbon on the farm (about cultures or breeding) | General | True but this is not problematic. Co-benefits serve as supplementary information that give more description to carbon credits, so they may be "double counted". | No | Validated | ||||||||||||||||||||
30 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | I don't have time to enter into details in all calculations and equations, but it is really difficult to know exactly th amount of N of the digestate that would be really use by the culture (nitrogen coefficient equivalent very variable) | Technical | Indeed it is complicated and site dependent, and it would be unreasonable to ask Project Developers to, for example, provide site-specific soil measurements. We used the same assumption as the researchers from INRAE, which is transparently stated in section 3.4.11. | No | Validated | ||||||||||||||||||||
31 | Elsa Rouches- Association des Agriculteurs Méthaniseurs de France (AAMF) | no access to the grid : maize sillage can sometimes be cultivated as interculture (so after a food culture) and in this way is not a problem moreover if this maize received less than 60 mm of irrigation ; a small part of inputs that have more than 500 kilometers is not incompatible with a good Life Cycle Analysis, etc. | Technical | Regarding silage, the Environmental and Social Do No Harm (ESDNH) assessment allows the Project Developers to qualitatively describe their practices, and the associated risks. Project Developers would have the opportunity to describe the situation you menion, and this would be accounted for in the ESDNH assessment outcome. Regarding transport distance, we decreased the reference distance from 500 km to 100 km. | No | Validated | ||||||||||||||||||||
32 | Venance Roy- Inwaste | Toujours ok pour que le système encourage les porteurs de projets à diminuer la part de culture dédiée ! En théorie c'est faisable mais sur des intervalles de temps plus long. En fait, quand on fait la certification du dossier, on prend en compte les données de l'année n-1, l'année n est donc déjà en cours, et il n'y a aucun moyen d'agir sur le % de culture dédiées en année n puisque les semis sont dejà réalisés dans les champs (les récoltes sont déjà même faites). Ca me smeble impossible de passer de 10 à 5% en une année qui est déjà en route finalement...Ce qu'il faut savoir aussi c'est que l'agriculteur prévoit ses cultures sur plusieurs années (rotation), ça permet d'éviter les maladies, les nuisibles etc sur ses parcelles... donc il sait déjà ce qu'il va planter en année n+1 et donc ce qui sera valorisé en méthanisation aussi (globalement car ça dépend des récoltes et de l'année). Donc en pratique ce n'est juste pas possible d'exiger cette diminution d'une année à l'autre quand on prend en compte les périodes de certifications + les délais. Dans notre cas nos projets possèdent peu ou pas de cultures dédiées mais c'est pour vous expliquer un peu le fonctionnement | General | Thank you for the description, we are aware of the large constraints of this requirement. Nevertheless, we prefer to remain firm on this point and conclude that such projects would not be eligible for Riverse Carbon Credits under those production circumstances. The activity shifting leakage risks would be too high, and this requirement is aligned with several of Riverse's and other VCM methodologies requiring that dedicated, cultivated feedstock shall not be used. | No | Validated | ||||||||||||||||||||
33 | Venance Roy- Inwaste | Pas d'accès sans demande d'autorisation au document "Risk evaluation" | General | Changed the access settings. The environmental and social risks considered are also listed in the methodology document. | Yes | Validated | ||||||||||||||||||||
34 | Venance Roy- Inwaste | Je ne suis pas sûre que ce soit correct d'extrapoler la quantités de matériaux au volume du digesteur principal. On voit des sites très compacts (avec 1 seule cuve) qui produisent beaucoup et des sites très étendus (3/4 cuves) qui produisent beaucoup moins. Il y a donc a écart de matériaux forcément tant sur le béton et l'acier, mais aussi au niveau des réseaux posés. | Technical | In our tests using infrastructure data from previous projects we found a satisfactory trend between infrastructure impacts and digester volume. It is indeed not perfect, but given the rather small contribution of infrastructure impacts to the total project emissions, we found the level of precision tolerable. | No | Validated | ||||||||||||||||||||
35 | Venance Roy- Inwaste | La quantité dépend aussi de l'efficacité du process de purification. | Technical | Yes we agree this value can vary, but the results are not sensitive to this value, so this simplification is tolerable. | No | Validated | ||||||||||||||||||||
36 | Venance Roy- Inwaste | Je pense qu'il peut être bon de garder cette hypothèse pour les projets en général. Mais de garder la possibilité de pouvoir renseigner les cas "exceptionnels" (pas d'autoconsommation de biogaz, consommation de biogaz de 10% car process thermophile, pas d'autoconsommation de biogaz car récupération de chaleur des installations ou chez un industriel à côté). | Technical | Noted that this value can vary for exceptional cases. We did a quick test on 15 projects already certified, and changing the percent of biogas used internall from 4% to 0% and 10% resulted in an average 0.33% change in project life cycle emissions for all projects (max change 0.68%). This imprecise simplification and assumption is therefore tolerable. | Validated | |||||||||||||||||||||
37 | Venance Roy- Inwaste | Je me demande si la paille ne devrait pas être considérée comme un déchet à mesure qu'il s'agit d'un résidu de culture. | Technical | Yes straw is an agricultural residue but it is so frequently reused and has market value that we would not consider it a waste residue but rather a low-value co-product residue. Note that it has about 1/100th of the imapct of intermediate energy crops, so the impacts are heavily discounted since it is a co-product. | No | Validated | ||||||||||||||||||||
38 | Venance Roy- Inwaste | Un digesteur principal de 500m3 n'existe pas, c'est tout petit. A ce jour le plus petit digesteur que j'ai vu est dimensionnée en 23 m de diamètre pour 6 m de hauteur, soit 2500m3 de volume total à l'intérieur. Dans ce type de conformation on a souvent 2 digesteurs car sinon le volume de digestion est insuffisant ou la production de biogaz sera trop peu importante. | Technical | Yes the 500 m3 is only used because it comes from the ecoinvent (LCA database) process used, which models infrastrucutre for an anaerobic digestion site with a main digester volume of 500 m3. So if a project has a digester with 2500 m3, we would effectively count 5 of the ecoinvent anaerobic digestion infrastructure processes. | No | Validated | ||||||||||||||||||||
39 | Gilles Bourguignat- Trefly Conseil | Should be written "primarily composed of biogenic methane" | Editorial | Changed | Yes | Validated | ||||||||||||||||||||
40 | Gilles Bourguignat- Trefly Conseil | Should be written "barriers prevent or limit their development."n | Editorial | Changed | Yes | Validated | ||||||||||||||||||||
41 | Gilles Bourguignat- Trefly Conseil | Should be "purifying to biomethane" (upgrading is less acurate) | Editorial | Changed | Yes | Validated | ||||||||||||||||||||
42 | Gilles Bourguignat- Trefly Conseil | Should not be limited to engine but also turbine. Should be "by a biogas engine or turbine" | Editorial | Changed | Yes | Validated | ||||||||||||||||||||
43 | Gilles Bourguignat- Trefly Conseil | Change "upgrading" into "purifying" ? "direct injection" should be defined somewhere as "Injection at site". | Editorial | Changed upgrading to purifying, did not define direct injection because it is only used once and is estimated to be a common, understandable term for the intended audience. | Yes | Validated | ||||||||||||||||||||
44 | Gilles Bourguignat- Trefly Conseil | Explian last sentence "and that carbon finance was used as initially described." | Editorial | Added the text in bold: "carbon finance was used as initially described for the expected investment" | Yes | Validated | ||||||||||||||||||||
45 | Gilles Bourguignat- Trefly Conseil | How the 500 km was set ? Seems far too high to consider a circular economy approach | Technical | This was reduced to 100 km. Note that this was never a strict cut off or requirement, only a suggested value to give reference to what is considered "distant", to be evaluated qualitatively in the ESDNH assessment. | Yes | Validated | ||||||||||||||||||||
46 | Gilles Bourguignat- Trefly Conseil | Digestor to be corrected in digester | Editorial | Changed | Yes | Validated | ||||||||||||||||||||
47 | Gilles Bourguignat- Trefly Conseil | should specify what end uses of digestate are eligible for crediting | General | Okay added paragraph 1.3 "The only use of digestate eligible for carbon credits under this methodology is application to agricultural soils as an organic amendment and fertilizer. Such activities shall be credited with avoided synthetic mineral fertilizer production and use. If digestate is used in a different application, the project is still eligible for credits on the basis of their energy production activities." | Yes | Validated | ||||||||||||||||||||
48 | Gilles Bourguignat- Trefly Conseil | Should consider social cobenefits for farmers- allowing them to access revenue, diversify activities, allows them to stay in business | General | Thank you for this point, we added it as a potential cobenefit, described in Table 1 in section 2.3. | Yes | Validated | ||||||||||||||||||||
49 | Gilles Bourguignat- Trefly Conseil | Agree that most biogas projects would not be able to precisely track the reception and use of feedstock inputs, e.g. they don't typically generate tracable tickets when trucks pass through the weigher | General | Okay noted. | No | Validated | ||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |