LA JOLLA CIP PRIORITIES FOR CD1 BUDGET HEARINGS FOR FY22
2
Background: This list was compiled from CIP priority requests sent from La Jolla Community Planning Association, La Jolla
3
Shores Association and La Jolla Parks and Beaches to CD1 in October 2020. Projects are categorized, though not prioritized.
4
5
Capital Improvement Projects currently funded and proceeding through City process are:
6
1. Scripps Park Comfort Station project ("E B Scripps Park Comfort Station Replacement, CIP Ref. S15035"). It is under
7
construction with anticipted completion in Fall 2021.
8
2. Drain repairs at the La Jolla Shores North Comfort Station ("Kellogg Comfort Station Improvements, CIP Ref. B20120").
9
Construction has not begun.
10
11
ITEMDESCRIPTIONCATEGORY
12
13
1Add handrail to ocean access walk at south end of the Marine Room (Spindrift)Safety
14
2Additional steps at bottom of staircase to Cove beachSafety
15
3Bring Black’s Beach Overlook fence into compliance (no permit, no gate, fence at 6 ft. not 42 in., blocks view)Safety
16
4Kellogg Park gates locked nightly and enforcement of parking violationsSafety
17
5Kellogg Park Security and Code Enforcement Safety
18
6La Jolla Shores comfort stations increased cleaning and sanitationSafety
19
7Repair handrails & steps for ocean access at Camino de la Costa Viewpoint (5990 Camino de la Costa)Safety
20
8Repair ocean access steps at Marine StreetSafety
21
9Trash pick up and added cans in Kellogg ParkSafety
22
10Rehab Coast Walk Bridge; repair temporary patch to hole in Coast Walk (FO Coast Walk) Maintenance
23
11Repair deteriorating sidewalks, curbs and guttersMaintenance
24
12Repair water drainage issue and dip in road at Forward Street & La Jolla Blvd (road sinking on east side)Maintenance
25
13Repair La Jolla Shores boardwalk crumbling wallsMaintenance
26
14Repair sidewalk near Scripps Park Comfort Station projectMaintenance
27
15Repave Neptune w/ concrete; Re-allocate ROW: Widen sidewalk; Add bike laneMaintenance
28
16Replace rusted BBQ and upgrade picnic areas in Scripps ParkMaintenance
29
17Upgrade or install planters along walkway near Scripps Park Comfort Station projectMaintenance
30
18La Jolla Shores Boardwalk complete resurfacing due to uneven and dangerous conditionCIP
31
19Landscape and Street tree plan and implementation throughout La JollaCIP
32
20Rehabilitate Children’s Pool Seawall, Beach Access Stair/Retaining Wall, add ADA accessCIP
33
21Reparation and restoration of La Jolla Hermosa Park (5780 Chelsea Avenue)CIP
34
22Street Lighting throughout La JollaCIP
35
23Trees Replaced in Kellogg Park CIP
36
24La Jolla Village Streetscape PlanCIP (Self Funded)
37
25Conduct comprehensive traffic study at ThroatTraffic
38
26Construct Traffic Calming & Streetscape Enhancement on Prospect in front of Rec. CenterTraffic
39
27Diagonal parking with bulb-outs at key locationsTraffic
40
28Mid-block crossingsTraffic
41
29Roundabouts in key intersections and thoroughfares through out all of La JollaTraffic
42
30Traffic calming measures at dangerous road segmentsTraffic
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100