ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAHAIAJAKALAMAN
1
PROJECT
REV(1)
2
ADDRESS
O & P
3
Date of Submission
Please confirm/Add price 15.00%
4
Date of plans
Please confirm inclusion in scope
5
Comments
Please go through all the comments and exclusions
6
BASE BID
Changes as per Rev1
7
SR #DWG. NO.DETAIL NO.CSI NO.DESCRIPTIONWASTEQTY. W/ WASTEUNITLABOR/EQUIP. COSTMATERIAL COSTSUBCONTRACTOR COSTTOTAL UNIT COSTTOTAL COSTSUBTOTALSMATERIAL TOTAL
8
1 00 00GENERAL CONDITIONS
9
1GeneralGeneral Requirements
- Mobilization / Demobilization
- Temporary facilities
- Daily & Final clean up
- Close out procedures & Documentation
- Project management & Supervision
- Coordination w/ other trades
- Permit & Fees
Testing of imported fill
- Hydraulic calculations must include a hose allowance
10% 1 LS $ - $ - $ - $ -
10
$ -
11
Sub Total $ - $ -
12
$ -
13
2 00 00EXISTING CONDITIONS $ -
14
SITE DEMOLITION $ -
15
2DWG-4DWG-46.0 CYEncroaching fence to be relocated along the property line 2430% 243 LF $ - $ - $ - $ -
16
3DWG-4DWG-432.3 CYExisting fence to be removed & reinstalled after basin construction 3130% 313 LF $ - $ - $ - $ -
17
4DWG-4DWG-479.0 CYExisting trees to be removed (Typ.) 790% 79 EA $ - $ - $ - $ -
18
5DWG-4DWG-44.5 CYPortion of existing curb to be removed 1640% 164 LF $ - $ - $ - $ -
19
6DWG-4DWG-415.8 CYPortion of existing fence to be removed 1240% 124 LF $ - $ - $ - $ -
20
7DWG-4DWG-414.6 CYPortion of existing guiderail to be removed 1100% 110 LF $ - $ - $ - $ -
21
8DWG-4DWG-419.0 CYPortion of existing wall to be removed 640% 64 LF $ - $ - $ - $ -
22
9DWG-4DWG-42.4 CYRemove 8" sanitary sewer 1280% 128 LF $ - $ - $ - $ -
23
10DWG-4DWG-45.1 CYRemove existing ACP & dispose of with according to the regulations for ACP pipes4060% 406 LF $ - $ - $ - $ -
24
11DWG-4DWG-41.0 CYRemove sanitary manhole30% 3 EA $ - $ - $ - $ -
25
12DWG-6DWG-62.0 CYExisting 4" SDR 35 PVC sanitary sewer to be relocated1100% 110 LF $ - $ - $ - $ -
26
13DWG-4DWG-4Existing lateral to be relocated 10% 1 EA $ - $ - $ - $ -
27
14DWG-5DWG-5Sawcut1580% 158 LF $ - $ - $ - $ -
28
$ -
29
SPOIL HAULAGE $ -
30
15181.8 CYLoads of Spoil to be Hauled Away
-16CY/Loads
110% 11 Loads $ - $ - $ - $ -
31
$ -
32
Sub Total $ - $ -
33
$ -
34
3 00 00CONCRETE $ -
35
PAD FOOTINGS $ -
36
16S100Ftg Sch/S2.1Concrete (5000 PSI)47410% 521 CY $ - $ - $ - $ -
37
17S100Ftg Sch/S2.1Reinforcement3209810% 35,308 LB $ - $ - $ - $ -
38
18S100Ftg Sch/S2.1Formwork263110% 2,894 SFCA $ - $ - $ - $ -
39
19S100Ftg Sch/S2.1Excavation131410% 1,446 CY $ - $ - $ - $ -
40
20S100Ftg Sch/S2.1Backfill84110% 925 CY $ - $ - $ - $ -
41
$ -
42
WALL FOOTINGS $ -
43
21S1001,2,3/S2.1Concrete (5000 PSI)16810% 185 CY $ - $ - $ - $ -
44
22S1001,2,3/S2.1Reinforcement1741910% 19,161 LB $ - $ - $ - $ -
45
23S1001,2,3/S2.1Formwork389110% 4,280 SFCA $ - $ - $ - $ -
46
24S1001,2,3/S2.1Excavation81610% 898 CY $ - $ - $ - $ -
47
25S1001,2,3/S2.1Backfill65110% 716 CY $ - $ - $ - $ -
48
26S1001,2,3/S2.1Slab Steps60% 6 EA $ - $ - $ - $ -
49
$ -
50
CONCRETE COLOMNS & BEAM $ -
51
27S1001,2,3/S2.1Concrete (5000 PSI)8310% 91 CY $ - $ - $ - $ -
52
28S1001,2,3/S2.1Reinforcement3534110% 38,876 LB $ - $ - $ - $ -
53
29S1001,2,3/S2.1Formwork383110% 4,214 SFCA $ - $ - $ - $ -
54
$ -
55
ELEVATOR MATT SLAB $ -
56
30S1001,2,3/S2.111.2 CY16" Thick Elevator Matt Slab (5000 PSI)20610% 227 SF $ - $ - $ - $ -
57
31S1001,2,3/S2.1#5 @ 12" OC Each Way Top & Bottom103110% 1,134 LB $ - $ - $ - $ -
58
32S1001,2,3/S2.1Formwork8310% 91 SFCA $ - $ - $ - $ -
59
$ -
60
SLAB ON GRADE $ -
61
33S100S100739.6 CY5" Thick Concrete Slab on Grade (4000 PSI)4322610% 47,549 SF $ - $ - $ - $ -
62
34S100S100Fiber Mesh Reinforcement 4322610% 47,549 SF $ - $ - $ - $ -
63
35S100S100Vapor Barrier4322610% 47,549 SF $ - $ - $ - $ -
64
36S100S1006" Compacted Aggregate Base80010% 881 CY $ - $ - $ - $ -
65
37S100S100Expansion Joints345810% 3,804 LF $ - $ - $ - $ -
66
38S100S100Control Joints691610% 7,608 LF $ - $ - $ - $ -
67
39S100S1005" Edge Form103010% 1,133 LF $ - $ - $ - $ -
68
40S100S100Compacted Subgrade 4322610% 47,549 SF $ - $ - $ - $ -
69
$ -
70
PATIO SLAB $ -
71
41S100S10015.8 CY5" Thick Patio Slab (4000 PSI)92210% 1,014 SF $ - $ - $ - $ -
72
42S100S100Fiber Mesh Reinforcement 92210% 1,014 SF $ - $ - $ - $ -
73
43S100S1006" Compacted Aggregate Base1710% 19 CY $ - $ - $ - $ -
74
44S100S100Expansion Joints7410% 81 LF $ - $ - $ - $ -
75
45S100S100Control Joints14810% 162 LF $ - $ - $ - $ -
76
46S100S1005" Edge Form12510% 138 LF $ - $ - $ - $ -
77
47S100S100Compacted Subgrade 92210% 1,014 SF $ - $ - $ - $ -
78
$ -
79
14" THICK ELEVATED SLAB $ -
80
48S100S1001630.2 CY14" Thick Elevated Concrete Slab (5000 PSI)3420010% 37,620 SF $ - $ - $ - $ -
81
49S100S100#5 @ 12" OC Each Way Top & Bottom17121910% 188,341 LB $ - $ - $ - $ -
82
50S100S100Perimeter Formwork136310% 1,499 LF $ - $ - $ - $ -
83
51S100S100Under slab Formwork3420010% 37,620 SF $ - $ - $ - $ -
84
52S100S100Shoring/Reshoring 3420010% 37,620 SF $ 5.50 $ 6.33 $ 237,947 $ -
85
$ -
86
16" THICK ELEVATED SLAB $ -
87
53S100S100402.2 CY16" Thick Elevated Concrete Slab (5000 PSI)736710% 8,104 SF $ - $ - $ - $ -
88
54S100S100#5 @ 12" OC Each Way Top & Bottom3688210% 40,570 LB $ - $ - $ - $ -
89
55S100S100Perimeter Formwork136310% 1,499 LF $ - $ - $ - $ -
90
56S100S100Under slab Formwork736710% 8,104 SF $ - $ - $ - $ -
91
57S100S100Shoring/Reshoring 736710% 8,104 SF $ 5.50 $ 6.33 $ 51,256 $ -
92
$ -
93
12" THICK TWO WAY CONCRETE SLAB $ -
94
58S100S100117.9 CY12" Thick Two- Way Concrete Elevated Slab (5000 PSI)289410% 3,183 SF $ - $ - $ - $ -
95
59S100S100#5 @ 12" OC Each Way Top & Bottom1448910% 15,937 LB $ - $ - $ - $ -
96
60S100S100Perimeter Formwork136310% 1,499 LF $ - $ - $ - $ -
97
61S100S100Under slab Formwork289410% 3,183 SF $ - $ - $ - $ -
98
62S100S100Shoring/Reshoring 289410% 3,183 SF $ 5.50 $ 6.33 $ 20,135 $ -
99
$ -
100
ADDITIONAL BARS $ -