STAIRCASE PRESSURIZATION CALCULATION
2
PROJECT
3
Structural componentsheight ft
Length ft
width ftArea Average Leakage Ratio AL/A
Average Leakage Ratio AL/A
Total leakage Area ft^2
4
Wall1217.58.56240.11x10^-30.000110.06864
5
Floor17.58.5297.50.52x10^-40.0000520.01547
6
Ceiling17.58.5297.50.52x10^-40.0000520.01547
7
Door Frame7320Door crack0.0060.12
8
Total leakage Area /Floor0.21958
9
10
∆P (inch w.g)0.37
11
12
Air Flow through construction gap/cracks
13
Q1=2610x0.100Leakage Area ft^2)0.6∆P (inch w.g)158cfm
14
15
Air Flow through door gaps
16
Q2=2610x0.12Leakage Area ft^2)0.2∆P (inch w.g)63cfm
17
18
Total flow rate per floor
19
No of floor25221cfm
20
Total flow for Staircase 5518cfm
21
22
height ft
Length ft
width ftArea
No of door open during evacuation
23
Open Area Across Door single Leaf73211
24
Open Area Across Door double Leaf76421
25
Q3=Vmax xAE
Effective area Area ft^2)
26
27
Where, Vmax is the maximum air velocity considered through an open door and is 200 fpm (IBC 909. 7.2)
28
29
Q3=12600cfm
30
31
QT Total Air flow rate=18118cfm
32
Factor of safety10%
33
QT Total Air flow rate=19930cfm
34
35
Relief Air requirements=14412cfm
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100