3 | Workshop: | HEAVY DIESEL SHOP | Meeting Supervised By: | Richard Gestro | Date: | 20/11/2026 | |||||||||||||||||
4 | |||||||||||||||||||||||
5 | Schedule Item | Work Briefing | Person Responsible | Critical Risks Today | Risk Controls | ||||||||||||||||||
6 | TD001- Repair leaking final drives, Diagnose travel fault, Yellow card repairs | John D, Riaan j, David B | manual handling | use two person lifts and mechanical aid were needed. | |||||||||||||||||||
7 | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||||
8 | Accessing machine | Three points of contact when climbing. | |||||||||||||||||||||
9 | Jacking and blocking | Use correct jacks and correct blocks in suitable location | |||||||||||||||||||||
10 | High pressure hydraulic testing | use correct PPE, know the system being tested, expected pressures ect. | |||||||||||||||||||||
11 | Hot works- Welding cutting grinding | Use correct PPE, Gloves- safety glasses, Screen off area | |||||||||||||||||||||
12 | |||||||||||||||||||||||
13 | Accessing machine | Three points of contact when climbing. | |||||||||||||||||||||
14 | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||||
15 | manual handling | use two person lifts and mechanical aid were needed. | |||||||||||||||||||||
16 | |||||||||||||||||||||||
17 | DT059- Check over machine for faults, Remove front and rear diff from machine and repair | James G, Geoff H | Jacking and blocking | Use correct jacks and correct blocks in suitable location , make up extra suport stand before lifting second axle | |||||||||||||||||||
18 | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||||
19 | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||||
20 | Accessing machine | Three points of contact when climbing. | |||||||||||||||||||||
21 | pinch points | keep clear of line of fire | |||||||||||||||||||||
22 | manual handling | use two person lifts and mechanical aid were needed. | |||||||||||||||||||||
23 | |||||||||||||||||||||||
24 | |||||||||||||||||||||||
25 | QE001- Repair leaking hydraulic cylinders in jaw crusher | Geoff H, James G | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||
26 | Accessing machine | Three points of contact when climbing, use platform ladder | |||||||||||||||||||||
27 | manual handling | use two person lifts and mechanical aid were needed. | |||||||||||||||||||||
28 | Sharp edges and burs | grind down and jaged edges use suitable gloves when required | |||||||||||||||||||||
29 | Pinch/Crush points | keep clear of line of fire | |||||||||||||||||||||
30 | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||||
31 | Working at heights | set up scafolding, work platforms and edge protection | |||||||||||||||||||||
32 | |||||||||||||||||||||||
33 | MS029- Front diff and engine retarder repairs | Lional G, Lance E, Dave B | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||
34 | Jacking and blocking | Use correct jacks and correct blocks in suitable location | |||||||||||||||||||||
35 | Manual handling | use two person lifts and mechanical aid were required | |||||||||||||||||||||
36 | Accessing machine | Three points of contact when climbing, use correct platform ladder and scafolding were needed | |||||||||||||||||||||
37 | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||||
38 | Hot works- Welding cutting grinding | Use correct PPE, Gloves- safety glasses, Screen off area | |||||||||||||||||||||
39 | |||||||||||||||||||||||
40 | GR014- Mid life repairs and maintanance, Split machine at hitch for repairs | Jacob T, Theo H, | Jacking and blocking | Use correct jacks and correct blocks in suitable location | |||||||||||||||||||
41 | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||||
42 | Machinery movment | use spotter when moving machine into W/S, lower all impliments to the groun | |||||||||||||||||||||
43 | Hot works- Welding cutting grinding | Use correct PPE, Gloves- safety glasses, Screen off area | |||||||||||||||||||||
44 | Manual handling | use two person lifts and mechanical aid were required | |||||||||||||||||||||
45 | pinch points | keep clear of line of fire | |||||||||||||||||||||
46 | |||||||||||||||||||||||
47 | |||||||||||||||||||||||
48 | |||||||||||||||||||||||
49 | EX069, Replace undercarriage and yellow card repairs | Jacob K, Jacob T | Slips trips and falls | Keep work area tidy and clean up spills imediatly | |||||||||||||||||||
50 | Accessing machine | Three points of contact when climbing / use scafolding | |||||||||||||||||||||
51 | Jacking and blocking | Use correct jacks and correct blocks in suitable location | |||||||||||||||||||||
52 | Manual handling | use two person lifts and mechanical aid were required | |||||||||||||||||||||
53 | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||||
54 | Jacking and blocking | Use correct jacks and correct blocks in suitable location | |||||||||||||||||||||
55 | CP006- Repair rear final drive, Engine repairs | Lional G,Lance E, Joe G, Mathew C | Hot works, welding ,grinding | Use suitable screens and correct PPE for task | |||||||||||||||||||
56 | Manual handling | Use mechanical aid, Use two people for lifting | |||||||||||||||||||||
57 | Jacking and blocking | Use correct jacking equipment, Trainned tech | |||||||||||||||||||||
58 | Rigging and slinging | Use correct tagged lifting equipment suitable for task | |||||||||||||||||||||
59 | Manual handling | Use mechanical aid, Use two people for lifting | |||||||||||||||||||||
60 | Cleaning parts | Use correct PPE, Gloves- safety glasses | |||||||||||||||||||||
61 | |||||||||||||||||||||||
62 | |||||||||||||||||||||||
63 | |||||||||||||||||||||||
64 | -Make sure scafold tubes are installed onto main frame from the inside to outside to prevent loading up the locking clips | ||||||||||||||||||||||
65 | -Reminder to Sign toolbox Daily | ||||||||||||||||||||||
66 | -Reminder to ensure lifting eyes are fitted correctly and tight to the mounting faces before lifting, and bolt thread lenths are 1.5 times the diamater | ||||||||||||||||||||||
67 | -Reminder that Hard hats must be worn when using gantry crane in workshop. | ||||||||||||||||||||||
68 | |||||||||||||||||||||||
69 | -All techs to use correct personal lock outs and tag out processes, This includes using Tags to protect machinery. | ||||||||||||||||||||||
70 | |||||||||||||||||||||||
71 | Reviewed: | Date: | |||||||||||||||||||||
72 | |||||||||||||||||||||||
73 | |||||||||||||||||||||||
74 | |||||||||||||||||||||||
75 | |||||||||||||||||||||||
76 | |||||||||||||||||||||||
77 | |||||||||||||||||||||||
78 | |||||||||||||||||||||||
79 | |||||||||||||||||||||||
80 | |||||||||||||||||||||||
81 | |||||||||||||||||||||||
82 | |||||||||||||||||||||||
83 | |||||||||||||||||||||||
84 | |||||||||||||||||||||||
85 | |||||||||||||||||||||||
86 | |||||||||||||||||||||||
87 | |||||||||||||||||||||||
88 | |||||||||||||||||||||||
89 | |||||||||||||||||||||||
90 | |||||||||||||||||||||||
91 | |||||||||||||||||||||||
92 | |||||||||||||||||||||||
93 | |||||||||||||||||||||||
94 | |||||||||||||||||||||||
95 | |||||||||||||||||||||||
96 | |||||||||||||||||||||||
97 | |||||||||||||||||||||||
98 | |||||||||||||||||||||||
99 | |||||||||||||||||||||||
100 | |||||||||||||||||||||||