Sr. No.Particular QuantityPer Day
2
Sq mCu.mSq.ftCu.ftSkilled Male helperFemale HelperBhisti
3
1Excavation in soil upto 1.5 M 310011
4
2Excavation in morrum upto 1.5 M 27511
5
3Excavation in Hard Rock13510.5
6
4Cement concrete work 1:2:451751264
7
5R.C.C. Work 31251263.5
8
6Brick Work in foundation1.25451120.25
9
7
Brick in superstructure 230 mm -9"
1351130.25
10
8Half brick wall partition5501130.25
11
9Uncoarsed rubble masonry 1351130.25
12
1012 mm thick Plastering ceiling 880113
13
12 mm thick Plastering wall15150113
14
11Pointing ( flush )12.512510.52
15
12Flooring
16
mm tiles40400113
17
Kota10100113
18
13Dado
19
6" x 6"1515011
20
4" x 8" , 6" x 8" 1010011
21
14White wash 1 coat 20011
22
15White wash 3 coat 7011
23
16Distemper 1 coat3511
24
17Oil painting 2511
25
18Timber framing sal / teak wood 0.072.511
26
19Door / window shutter Panelled0.70.711
27
20No. of brick laid by Mason in brick work upto 3 m 600 Nos. per Mason
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100