ABCDEFGHIJKLMNOPQRSTUVWXYZAA
1
報修時間
(Report time)
報修項目
(Repair Item)
說明
(Detail)
地點
(Location)
處理進度
(Reparing Progress)
處理日期
(Reparing Date)
完成
(Completion)
完成日期
(Completion date)
2
8/25/2025 8:42:36印表機(Printer)Cyan ink is low or running out on Color network printer in HR Teachers' Office
Elementary HR Teachers' Office
checked8/27/2025replaced08/27/2025
3
8/27/2025 8:18:54其他,請詳述於說明部分(Others, please write it in the "detail" field)I have a laptop that was loaned to me by the school. Microsoft Office needs to be updated, as the laptop cannot open Word, Excel, or PowerPoint files. I would also like the language on the laptop changed to English if possible.
5B classroom. On a desk next to the classroom computer at the front of the room.
checked8/27/2025repaired08/27/2025
4
9/4/2025 8:03:03其他,請詳述於說明部分(Others, please write it in the "detail" field)Class Keyboard1B
5
9/8/2025 11:28:54ChromebookCart 6 book 7 (OS not operating) 6Achecked9/10repaired9/10
6
9/11/2025 9:22:19其他,請詳述於說明部分(Others, please write it in the "detail" field)7B教室 侯驊宸學生椅子歪斜 需要更換7B教室
7
9/15/2025 10:35:50其他,請詳述於說明部分(Others, please write it in the "detail" field)冷氣機漏水,週末有關冷氣,週一一早發現教室櫃子牆壁都是水6A
8
9/15/2025 12:54:52教室電腦(Classroom computer)Wireless keyboard battery corroded and computer power goes off randomly. I suspect we need a new surge protector.1B
9
9/18/2025 14:51:58其他,請詳述於說明部分(Others, please write it in the "detail" field)7B有兩個學生反應椅子損壞或歪斜要請幫忙更換 一個是侯驊宸 一個是平松真依 再麻煩盡速幫忙處理7B教室
10
9/19/2025 8:11:24密碼鎖儲物櫃(Metal locker with password)19號儲物櫃的鉸鏈從門上脫落了。Cubby #19, the hinge of the door has come unscrewed 7A homeroom
11
9/23/2025 15:37:50其他,請詳述於說明部分(Others, please write it in the "detail" field)數學二教室門上的玻璃碎裂數學二教室
12
9/26/2025 14:09:03其他,請詳述於說明部分(Others, please write it in the "detail" field)冷氣機空氣濾網
(1) ESOL 教室 (2)資源資源教室 (Learning Support Classrooo教室教室 (Learning Support Classroo
13
9/30/2025 13:41:07音響(Audio system)No audio from laptop to projector and audio system5Bchecked9/30done9/30
14
10/9/2025 11:27:51其他,請詳述於說明部分(Others, please write it in the "detail" field)A/C - the airconditioner (above cubbies 13-15) is leaking a lot of water.
7A classroom - SAO building
15
10/13/2025 15:21:19其他,請詳述於說明部分(Others, please write it in the "detail" field)7B教室旁邊的水槽 最右邊的排水口堵塞不通7B教室旁邊的水槽 最右邊的排水口堵塞不通
16
10/14/2025 8:18:21印表機(Printer)black ink is low for the black and white printerelementary officechecked10/16replaced10/16
17
10/14/2025 8:24:10印表機(Printer)black ink very low in color printer tooelementary officechecked10/16replaced10/16
18
10/16/2025 7:19:24印表機(Printer)BOTH printers in the Elementary HomeRoom Teachers' Office are very low on black ink
Elementary HR Teachers' Office
checked10/16replaced10/16
19
10/20/2025 15:29:36其他,請詳述於說明部分(Others, please write it in the "detail" field)The drain is clogging up with leaves and sediment and the balcony is beginning to flood. I removed some of the sediment from the drain cover, but the gutters will need to be cleaned out thouroughly before the library floods and 4B gets flooded from what seeps through our ceiling.
Drain in Balcony of Small Library (4th Floor, Elementar Building)
20
10/21/2025 15:27:13其他,請詳述於說明部分(Others, please write it in the "detail" field)Door Hinge is OUT of the door and jagged screws are sticking out.4B Locker door.
21
10/22/2025 11:26:17其他,請詳述於說明部分(Others, please write it in the "detail" field)Door Handle is stripped so it will not stay attached to the screw affixing it
4B Classroom, Locker (the same locker the door is falling off of)
22
10/27/2025 14:58:42教室電腦(Classroom computer)we are unable to follow links from lesson slides -it reports server not found or server unavailable4B
23
12/9/2025 15:41:40Chromebookscreen of the #18 chromebook in cart 4 has been broken when we opened to use it.IBSHchecked12/10
24
12/16/2025 15:33:24Chromebookscreen of #13 in cart 4 was broken when we have it IBSHchecked12/16
25
12/23/2025 8:53:25其他,請詳述於說明部分(Others, please write it in the "detail" field)電子白板無畫面12Achecked12/23fixed12/23
26
12/24/2025 15:11:10其他,請詳述於說明部分(Others, please write it in the "detail" field)Door lock 門鎖6A
27
1/6/2026 15:33:33其他,請詳述於說明部分(Others, please write it in the "detail" field)Classroom cupboards/lockers: Broken5B
28
1/12/2026 13:58:57印表機(Printer)右邊印表機無法列印或煤炭法2F Big Office
29
1/14/2026 13:42:03投影機(Projector)The projector was overheating yesterday and needed to be shut down. The color is off now (it is extremely blue.).4B Homeroom
30
1/14/2026 13:43:39其他,請詳述於說明部分(Others, please write it in the "detail" field)Cupboard door is totally broken off and the part of the door that holds the hinge ihas fallen apart.4B homeroom
31
1/14/2026 13:56:39其他,請詳述於說明部分(Others, please write it in the "detail" field)Ceiling Fan: Ceiling fan has a short in the wiring. History: when we turned it on, sparks flew from the gears. They tested it out and replaced the fan. the next time it was turned on, it spun extremely slowly and make worring noises and then started to smoke. We turned it off and have not used it since. the electrical short imust be in the wired connecting the fan, not the fan iteself.4B Homeroom Class
32
1/15/2026 8:25:36其他,請詳述於說明部分(Others, please write it in the "detail" field)Can you please remove the metal filing cabinet from the classroom? It is broken (bottom 2 drawers do not work) and it is not needed. If it is not possible to remove it, can you please seal the top 2 drawers shut so that students cannot put anything in there? I am worried that food dropped in there is impossible to get out and will attract bugs. It would be best if it can be removed since 7A is relocating to a new classroom next week. Thank you for your help. 7A classroom
33
1/23/2026 8:03:45印表機(Printer)Color printer has very low ink for cyanelementary office
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100