WUHSD Geotech/DSA Lab/Special Inspection Services RFQ 2026 - Materials Testing/Special Inspection Cost Worksheet
2
3
SAMPLE SHADE STRUCTURE PROJECTInstructions: Fill in yellow-highlighted cells as applicable
4
5
TASK DESCRIPTION/POSITION TITLERATEUNITSCOST
6
7
Project Setup (if applicable)
8
Project Engineer
Flat rate or hourly10
9
SUBTOTAL
0
10
11
Onsite/Shop Work (Prevailing Wage) [Fill in Title of Position Performing Work]
12
Post Grading Operations
/ hour240
13
Shop Welding/ hour120
14
Concrete (Field)/ hour60
15
Concrete (Batch Plant)/ hour60
16
HS Bolts/ hour80
17
Vehicle Usage (if applicable)
total
18
SUBTOTAL
0
19
20
Laboratory Testing
21
Pick-up and delivery (weekdays)
/ each20
22
Modified Proctor compaction 6" mold (Method C ASTM D1557)
/ each10
23
Particle size - Sieve only 1 1/2" to #200 (ASTM D6913/CTM 202)
/ each10
24
Concrete cylinders compression (ASTM C39 6" X 12")
/ each60
25
SUBTOTAL
0
26
27
Report Preparation, Materials Management, DSA 291/292/293 as required, Other
28
Principal/ hour0
29
Project Engineer
/ hour0
30
Staff Geologist
/ hour0
31
Dispatcher
/ hour0
32
Project Administrator/Word Processor
/ hour0
33
Other:0
34
Other:0
35
SUBTOTAL
0
36
37
TOTAL ESTIMATED COST
0
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100