ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
Create professional Gantt charts in GanttPRO in a few clicks
3
4
Construction Project Timeline4/8/2025
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING7/9/20259/10/202503680000
7
1.1Land Use7/9/20259/9/2025036000OpenMedium00
8
1.2Easements, Set Backs7/12/20259/10/2025036000OpenMedium00
9
1.3Access, Street Improvements7/12/20259/10/2025036000OpenMedium00
10
1.4Utilities Available7/12/20259/10/2025036000OpenMedium00
11
2HOUSE PLANS7/14/20259/17/202503840000
12
2.1Purchase Standard Plans7/14/20259/14/2025036000OpenMedium00
13
2.2Architect Original Drawings7/15/20259/15/2025036000OpenMedium00
14
2.3Specifications7/16/20259/16/2025036000OpenMedium00
15
2.4Architect Manage Job7/19/20259/17/2025036000OpenMedium00
16
2.5Engineer-Loads & Spans7/19/20259/17/2025036000OpenMedium00
17
2.6Draftsman7/19/20259/17/2025036000OpenMedium00
18
3LOT SURVEY7/21/20259/24/202503840000
19
3.1House & Driveway7/21/20259/21/2025036000OpenMedium00
20
3.2Well Locaton7/22/20259/22/2025036000OpenMedium00
21
3.3Septic Location7/23/20259/23/2025036000OpenMedium00
22
3.4Fire Hydrant & Truck Access7/26/20259/24/2025036000OpenMedium00
23
3.5Plot Plan7/26/20259/24/2025036000OpenMedium00
24
4FINANCIAL - LOAN7/27/20259/30/202503840000
25
4.1Land Cost7/27/20259/27/2025036000OpenMedium00
26
4.2Interest on Land7/28/20259/28/2025036000OpenMedium00
27
4.3Interest on Const. Loan7/29/20259/29/2025036000OpenMedium00
28
4.4Points, Etc.7/30/20259/30/2025036000OpenMedium00
29
5SEWER & WATER HOOKUP8/2/202510/1/2025036000OpenMedium00
30
6HEALTH PERMIT8/2/202510/5/202503760000
31
6.1Fees8/2/202510/1/2025036000OpenMedium00
32
6.2Percolation Test8/3/202510/4/2025036000OpenMedium00
33
6.3Soils Engineer8/4/202510/5/2025036000OpenMedium00
34
7INSURANCE8/5/202510/6/2025036000OpenMedium00
35
8LOT CLOSING COSTS8/6/202510/7/2025036000OpenMedium00
36
9BUILDING PERMITS8/9/202510/8/202503600000
37
9.1Fees8/9/202510/8/2025036000OpenMedium00
38
9.2Inspection Schedule8/9/202510/8/2025036000OpenMedium00
39
10PRELIMINARY LIST ONLY8/10/202510/11/2025036000OpenMedium00
40
11BUILD PHASE8/11/202510/12/2025036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS8/13/202510/15/202503680000
42
12.1Rough Hardware, Misc.8/13/202510/14/2025036000OpenMedium00
43
12.2Lolly Columns8/16/202510/15/2025036000OpenMedium00
44
12.3Steel Beams8/16/202510/15/2025036000OpenMedium00
45
12.4Rough Lumber, Trusses8/16/202510/15/2025036000OpenMedium00
46
13WINDOWS/OPENINGS8/18/202510/21/202503760000
47
13.1Windows, Grills, Screens8/18/202510/19/2025036000OpenMedium00
48
13.2Exterior Doors,Screens8/19/202510/20/2025036000OpenMedium00
49
13.3Skylights and Light Tubes8/20/202510/21/2025036000OpenMedium00
50
14DEMOLITION8/23/202510/22/2025036000OpenMedium00
51
15LOT CLEARING8/23/202510/26/202503760000
52
15.1Debris Removal & Clearing8/23/202510/22/2025036000OpenMedium00
53
15.2Dump Fee8/24/202510/25/2025036000OpenMedium00
54
15.3Bury Stumps, etc.8/25/202510/26/2025036000OpenMedium00
55
16DRIVEWAY, rough8/27/202510/29/202503680000
56
16.1Grade8/27/202510/28/2025036000OpenMedium00
57
16.2Base Rock, Culverts8/30/202510/29/2025036000OpenMedium00
58
17UTILITIES8/30/202511/1/202503680000
59
17.1Temporary at startup8/30/202510/29/2025036000OpenMedium00
60
17.2Transfer to permanent8/31/202511/1/2025036000OpenMedium00
61
18WELL or PUBLIC WATER9/1/202511/2/2025036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER9/2/202511/3/2025036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT9/6/202511/5/202503600000
64
20.1Establish Finish Floor Height9/6/202511/5/2025036000OpenMedium00
65
20.2Set Back Distances9/6/202511/5/2025036000OpenMedium00
66
21DIG FOUNDATION9/6/202511/5/2025036000OpenMedium00
67
22ROCK PROBLEM9/7/202511/8/2025036000OpenMedium00
68
23PREPARE FOR FOOTINGS9/9/202511/11/202503680000
69
23.1Lay out and excavate9/9/202511/10/2025036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs9/10/202511/11/2025036000OpenMedium00
71
24POUR FOOTINGS & PADS9/13/202511/12/202503600000
72
24.1Yds. of Concrete9/13/202511/12/2025036000OpenMedium00
73
25SET BRICK POINTS9/13/202511/12/2025036000OpenMedium00
74
26TERMITE TREATMENT9/14/202511/15/2025036000OpenMedium00
75
27RADON CONTROL9/15/202511/16/2025036000OpenMedium00
76
28FOUNDATION WALLS9/17/202511/23/202503840000
77
28.1Block/Course9/17/202511/18/2025036000OpenMedium00
78
28.2Piers9/20/202511/19/2025036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete9/20/202511/19/2025036000OpenMedium00
80
28.4Lintels, Rebar9/20/202511/19/2025036000OpenMedium00
81
28.5Parging9/21/202511/22/2025036000OpenMedium00
82
28.6Cement, Sand, etc.9/22/202511/23/2025036000OpenMedium00
83
29WATERPROOF FOUNDATION.9/23/202511/24/2025036000OpenMedium00
84
30COLUMNS/BEAMS SET9/24/202511/25/2025036000OpenMedium00
85
31UNDERGROUND PLUMBING9/27/202511/26/2025036000OpenMedium00
86
32BRICK/STONE, to finish grade9/27/202511/26/2025036000OpenMedium00
87
33GARAGE DOORS9/28/202511/30/202503680000
88
33.1Openers9/28/202511/29/2025036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip9/29/202511/30/2025036000OpenMedium00
90
34DRAIN TILE9/30/202512/1/2025036000OpenMedium00
91
35FIRE PLACE - INTERIOR10/4/202512/3/202503600000
92
35.1Pour Hearth10/4/202512/3/2025036000OpenMedium00
93
35.2Firebox, or Set Prefab10/4/202512/3/2025036000OpenMedium00
94
35.3Brick or Stone Facing10/4/202512/3/2025036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.10/6/202512/10/202503840000
96
36.1Gravel, Wire, Poly, Grade Stakes10/6/202512/7/2025036000OpenMedium00
97
36.2Labor to Prepare for Slab10/7/202512/8/2025036000OpenMedium00
98
36.3Rebar, Wire, form boards10/8/202512/9/2025036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
10/11/202512/10/2025036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
10/11/202512/10/2025036000OpenMedium00