Field Validation Checklist
2
Project Name:
3
Location/Zone:
4
Inspector:
5
Date:
6
7
8
1. Architectural Elements
9
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
10
Wall locations & dimensionsMatches plan within ±10mmTape measure reading, photo
11
Door type, size, and swingMatches schedule & swing directionPhoto, door tag
12
Window installationCorrect size, height, and glazing typePhoto from interior & exterior
13
Floor finish typeMatches spec (e.g., tile, carpet)Material photo
14
Ceiling height & tile gridHeight consistent with designLaser measure + photo
15
16
2. Structural Elements
17
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
18
Column positionsWithin ±15mm of designTotal station/laser scan data
19
Beam size & placementMatches structural drawingPhoto + tag
20
Slab thicknessTolerances as per code/specCore sample/photo
21
Opening locations (slabs/walls)As per coordination drawingsPhoto + marked-up plan
22
23
3. MEP Systems
24
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
25
Duct routing & sizeMatches coordinated modelMeasuring tape + photo
26
Pipe insulation typeMatches spec (e.g., acoustic/thermal)Label photo
27
Fixture location (toilets, sinks)Within design tolerancesPhoto + tape measure
28
Cable tray height & alignmentWithin specified clearanceLevel tool + photo
29
HVAC equipment placementMatches shop drawingPhoto from multiple angles
30
31
4. Fire Safety Systems
32
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
33
Sprinkler head spacingMatches NFPA/local codePhoto + plan markup
34
Fire alarm devicesProper mounting & labelingDevice ID photo
35
Fire-rated wall penetration sealsSealed per UL-listed assembliesClose-up photo
36
37
5. Material Verification
38
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
39
Material submittals approvedAll materials match approved submittalsCopy of submittal or label photo
40
Batch numbers or tagsVisible and documented for traceabilityTag photo
41
42
6. Documentation & Closeout
43
Item to ValidateCriteriaRequired EvidenceDone (Y/N)
44
As-built markups completedAll deviations from design recordedRedline plans or digital markup
45
Punch list items verifiedAll previous issues resolvedBefore/after photos
46
Sign-off from responsible partiesInspector, subcontractor, supervisor signedSigned checklist or digital log
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100