On Zoning Ordinances
2
Q:Is there a solar zoning best practice guide or model we could reference?
3
A:
Yes! The Minnesota Association of County Planning Zoning Administrators has published the Minnesota Grow Solar Local Government Solar Toolkit to their website: http://www.macpza.org/MinnesotaToolkitJune2017.pdf
4
In case it comes up... there's a wind one, too: http://www.macpza.org/2017WindModelOrdinanceFinal.pdf. Both were developed by Brian Ross.
5
6
On Pollinators:
7
Q: What is an appropriate seed mix?
8
A:
The Board of Soil Water and Restoration has established appropriate seed mixes for Minnesota: http://www.bwsr.state.mn.us/native_vegetation/seed_mixes/index.html
9
10
Specific Solar-for-Pollinator seed mixes for three Minnesota regions include:
11
http://www.bwsr.state.mn.us/native_vegetation/seed_mixes/Low_Growing_Solar_Array_Mix_South_West.pdf
12
http://www.bwsr.state.mn.us/native_vegetation/seed_mixes/Low_Growing_Solar_Array_Mix_NE.pdf
13
http://www.bwsr.state.mn.us/native_vegetation/seed_mixes/Low_Growing_Solar_Array_Moist_Soils_South.pdf
14
15
16
Q:What kinds of questions should landowners ask of developers around establishing pollinator plantings?
17
A:Landowners should have something about developers being responsible for establishing and maintaining the pollinator habitat over X time period / until it's established. What happens when developers are forced to plant in the wrong season though? AF - I am getting questions about needing fire to maintain natural habitat - does that hurt the solar intall?
18
19
Q:What about Palmer Amaranth in seed mixes?
20
A: Seed mixes should be locally sourced from Minnesota providers. Palmer Amaranth is considered a noxious weed and is on the Minnesota eradicate list.
21
More information: https://extension.umn.edu/weed-identification/preventing-palmer-amaranth-minnesota
22
23
24
On Solar Decommissioning/Hazardous Waste
25
Q:Does our county need to think about mitigating solar as a hazardous waste at the time of decommissioning?
26
A: Some resources here (first question): https://docs.google.com/document/d/1DuyP2d39Gi0OeJhCn6aUyDxJWjYCbdUbVUrLQ2x1dfA/edit
27
28
Q:What about Panel Recycling?
29
A:Some resource here: https://docs.google.com/document/d/1DuyP2d39Gi0OeJhCn6aUyDxJWjYCbdUbVUrLQ2x1dfA/edit
30
31
Q:Did the MN Public Utilities Commission and Department of Commerce examine solar and wind decommissioning?
32
A:Yes, yes they did. There's a full Report with REcommendations on Decommissioning Plans
33
file:///C:/Users/ebing007/Downloads/Solar%20and%20Wind%20decommissioning%20work%20group%20report%2008-2018.pdf
34
35
QIs there any official state guidance on decommissioning?
36
AIn August 2018 a workgroup submitted an official Solar and Wind Decommissioning Working Group Report and Recommendations Report to the Minnesota Public Utilities Commission as part of Docket 17-123. That report can be found here: https://www.edockets.state.mn.us/EFiling/edockets/searchDocuments.do?method=showPoup&documentId={F0DC9065-0000-C734-8DCC-76C867A06CD8}&documentTitle=20188-146145-02
37
On Glare
38
Q:What about solar and glare, particularly around airports?
39
A: Minnesota has airport zoning laws to, amongst other things, protect airports from incompatible land uses near the airport. These laws require local communities with an airport to adopt airport zoning in order to be eligible for state and federal funding sources. Part of the standards for this zoning is “Zone C” which has a 5,000 or 10,000 foot radius from runway and has these restrictions:
40
No use shall be made of any land in any of the safety zones which creates or causes interference with the operation of radio or electronic facilities on the airport or with radio or electronic communications between the airport and aircraft, makes it difficult for pilots to distinguish between airport lights and other lights, results in glare in the eyes of pilots using the airport, impairs visibility in the vicinity of the airport, or otherwise endangers the landing, taking off, or maneuvering of aircraft. (MN Rules 8800.2400 Subp. 6)
41
The concern with solar facilities near airports is the glare they can cause and they are generally restricted by airport zoning adopted at a local level. MnDOT acts as a technical resource to these communities by providing guidance on the use of the SGHAT to meet the federal policies in the link above. We don’t have a formal approval process, but will assist communities in how to use their airport zoning, and the Solar Glare Hazard Analysis Tool (SGHAT) to ensure that proposed facilities are compatible with the airport. The FAA “strongly encourages” use of the tool in the area around the regulated airport lands but does not require it.
42
This document explains the FAA criteria for determining if a proposed facility is compatible using the SGHAT tool. It is found here:
43
https://www.federalregister.gov/articles/2013/10/23/2013-24729/interim-policy-faa-review-of-solar-energy-system-projects-on-federally-obligated-airports
44
45
Resource person: Rylan Juran, MnDOT Aeronautics, 651-234-7190 or rylan.juran@state.mn.us
46
47
FAA Technical Guidance for Solar Technologies & Glare
48
FAA Form 7460-1
49
Solar Glare Hazard Analysis Tool for filing with Form 7460-1 for solar fields
50
MN DOT's Airport Land Use - Compatibility Manual
51
52
On Life Cycle Emissions
53
Q: What are the lifecycle emissions for solar?
54
A:Anyone have a good source?
55
http://www.anthropocenemagazine.org/2016/12/solar-panel-life-cycle-analysis/
56
57
On Stray Voltage
58
Q:What about solar causing stray voltage?
59
A:
We (CERTs) put togehter a blog post about the Stray Voltage Guide: https://www.cleanenergyresourceteams.org/blog/stray-voltage-resources-minnesota-farmers-local-governments-and-utilities
60
Direct link to the Stray Voltage Guide is here: http://www.minnesotastrayvoltageguide.com/wp-content/uploads/2015/10/MN_StrayVoltageGuide_HR.pdf
61
62
On Property Values
63
QDo solar arrays decrease surrounding property values?
64
A
From what we understand, NREL says there has not been a national study on property values to surrounding properties. There is a study for Chisago County here:
65
http://www.chisagocountypress.com/main.asp?SectionID=1&SubSectionID=1&ArticleID=23693
66
Lawrence Berkeley National Lab (LBL). The report, titled “Selling into the sun: Price premium analysis of a multi-state dataset of solar homes“,: https://emp.lbl.gov/publications/selling-sun-price-premium-analysis
67
LBL Student Paper titled: An Exploration of Property-Value Impacts Near Utility-Scale Solar Installations
68
69
On Solar Leases
70
QAre there model solar leases?
71
AUMN Law School Guide to CSG Leases:
72
http://energytransition.umn.edu/wp-content/uploads/2016/07/A-guide-to-sample-community-solar-garden-contracts.pdf
73
74
On Siting Rules
75
Q: How do solar and wind siting rules differ?
76
A:Solar and wind differ in siting rules and which level of government has jurisdiction. Only 15% of all permitting for solar is local. If a wind project is less than 5 MW it is local and 25 MW and greater is state; between 5 MW and 25 MW, the county can assert jurisdiction by becoming a wind delegated County. For solar, under 50MW is local and 50 MW and over is regulated by the state energy permitting process. (Minn. Stat. 216E.01, subd. 5 and 216E.03, subd. 1
77
If a large-scale solar energy facility is larger than 50 MW, then the project developer must apply to and receive from the PUC a site permit. If the solar energy facility is smaller than 50 MW, then it may apply to the appropriate local unit of government (the county and/or city) for a site permit. Minn.Stat. Sec. 216E.03-.05 (2018). Solar projects between 25 and 50 MW require preparation of an Env. Assessment Worksheet by the Env. Quality Board. Projects between 5 and 25 MW are subject to discretionary EAW at the request of the application, localg government or a citizen petition process. (Minn. Rules 4410.4500; 4410.4600, Subp. 3. An EAW is also required for land conversion projects that convert more than 80 acres of ag land, native prairie, forest, or naturally vegetated land. (Minn. Rule 4410.1100).
78
Q:How does a county assert jurisdiction and become a delegated county?
79
A:A delegated county must have a minimum of the state permitting standards though they may be stricter. AND, the state needs to approve them being delegated. A county can’t just be delegated without an approval process through the state. See page 4: https://www.revisor.mn.gov/statutes/cite/216F/pdf
80
81
Q:Is there a current list of counties who have become delegated counties? this would be for wind - not solar.....
82
A:Annette Fiedler has been working to update a list of these counties. To date (10/9/2018) we know that these counties are delegated counties: Jackson, Lyon, Murray, Pipestone, Stearns, Lincoln; letter from PUC said they needed to meet min state setbacks, they amended their ordinance - so they are in complience. 01-15-2019 - Sent information to Tricia at the PUC for Freeborn and Meeker counties, asking what needs to be done to complete the process.- update - Tricia said Meeker had the letter - so they are good. Information of what Freeborn County needs to do was supplied to Freeborn County ZA, it is in their court now.
83
84
On Storm Water
Q:How does utility-scale solar affect storm water run-off?
85
A:The MPCA requires that all construction projects that disturb 1 or more acres of land apply for a Minnesota NPDES/SDS Construction Stormwater General Permit. Solar projects must follow the permanent stormwater management rules and regulations of the permit. However, because solar farms—particularly the panels— have unique characteristics, not like building a building or road, the MPCA allows for the use of the “disconnected impervious credit method”, which often results in a reduction in treatment volume required. The design of the permanent stormwater management system must first try to utilize volume reduction practices such as infiltration. If it is determined that volume reduction cannot be accomplished due to prohibitions found in the permit, other types of permanent stormwater management such as wet sedimentation basins or filtration systems (e.g. sand filters) must be constructed
86
Water Volume Credit to Solar Projects with Vegetation: Solar projects that use traditional elevated solar panels are unique because they contain an impervious surface (elevated solar panel) that often have a pervious surface (vegetation) underneath the panel. It should be noted that this volume credit for solar sites is only available to those site that are vegetated beneath and between panels and excludes sites that have rock bases. This configuration raises challenges when addressing stormwater runoff and the design and construction of a permanent stormwater management system due to the relationship with the solar panel and underlying surface. Since the standard calculation for the water quality volume (1 inch times the impervious surface) required by the permit does not recognize the vegetated surface left in place under the panels, the water quality volume calculation may be done using the disconnected impervious credit method located from the Solar Panel Calculator on the MPCA's Information for determining stormwater management impacts for solar projects webpage. The disconnected impervious credit method uses an Excel spreadsheet to calculate 1) the total water volume required credited and 2) the remaining water quality volume to be treated.
87
https://stormwater.pca.state.mn.us/index.php?title=Stormwater_and_landscape_guidance_for_solar_farms_and_solar_projects
88