CATATAN TAMBAHANDendaRENCANA BAYARCATATAN PROGRESSSTATUSNOMOR KONTRAK / NOMOR SPBNO. PRKSKKIPELAKSANAMATERIAL
(RUMUS)
Type/Varian TerkontrakSATUNIT / VOLUMETOTALKONTRAK
2
PDGBKTSLKPYKUP2DTANGGALStatusNILAI
3
SLO (MON PER PRK BULANAN)
4
PRK 6.001
5
DesemberProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 2.715.642.030
6
JanuariTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 669.561.246
7
FebruariTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 669.561.246
8
MaretTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 479.434.140
9
AprilTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 669.561.246
10
MeiTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 669.561.246
11
JuniTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 669.561.246
12
JuliTerbayar0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 SELESAI 189.565.434
13
AgustusProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 669.561.246
14
SeptemberProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 669.561.246
15
OktoberProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 669.561.246
16
NovemberProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 669.561.246
17
DesemberProses di Vendor0855.BA/DIS.01.01/F0900000/20242024.DSBB.6.001L04PT PLN PUSERTIFSERTIFIKASI (SLO) JTM. JTR. GARDU DISTRIBUSI EKSISTING DAN PDP UID SUMBAR08 Mei 202430 Desember 2026 MASIH BERLAKU 669.561.246
18
19
20
LANJUTAN 2025
21
pajakJanuariPajakTerbayar0420.Pj/DAN.01.01/F09000000/20252025.DSBB.5.003L03PT TRIPUTRA ELECTRIC ABADITRAFO 160 KVA3P 160 kVA YZn5 OD3 Oktober 202516 November 2025 SELESAI 70.545.700
22
Nilai sesuai KR, SPMK done, BG asli diterima 22 DesemberMaretTerbayar0595.Pj/DAN.01.01/F09000000/20252025.DSBB.4.001L02PT DUTA TERANG RUBBERINDOLBS MOTORIZE+RTULBS Motorized + RTU 5 5 15 Desember 202513 Januari 2026 SELESAI 557.575.200
23
Nilai sesuai KR, SPMK doneMaretTerbayar0596.Pj/DAN.01.01/F09000000/20252025.DSBB.4.001L02PT PRIMA MITRAINTI SEJATILBS MOTORIZE+RTULBS Motorized + RTU 2 2 12 Desember 202510 Januari 2026 SELESAI 223.030.080
24
Nilai sesuai KR, SPMK proses, BG asli diterima 24 DesemberMaretTerbayar0556.Pj/DAN.01.01/F09000000/20252025.DSBB.4.001L02PT EGA TEKELINDO PRIMAAir Insulated Switchgear; CBOG Motorized; 24kV; 630A; 16kAAir Insulated Switchgear; CBOG Motorized; 24kV; 630A; 16kASet 12 12 22 Desember 202519 Februari 2026 SELESAI 2.529.990.144
25
Nilai sesuai KR, SPMK proses, BG asli diterima 24 DesemberMaretTerbayar0556.Pj/DAN.01.01/F09000000/20252025.DSBB.4.001L02PT EGA TEKELINDO PRIMAAir Insulated Switchgear; Metering; 24kV; 630A; 16kAAir Insulated Switchgear; Metering; 24kV; 630A; 16kASet 2 2 22 Desember 202519 Februari 2026 SELESAI 165.197.526
26
pajakJanuariPajakTerbayar0468.Pj/DAN.01.01/F09000000/20252025.DSBB.5.003L03PT MASTERGREEN ELECTRICTRAFO 50 KVA3P 50 kVA YZn5 OD 1 2 3 16 Oktober 202529 November 2025 SELESAI 13.567.250
27
pajakJanuariPajakTerbayar0471.Pj/DAN.01.01/F09000000/20252025.DSBB.5.003L03PT TRIPUTRA ELECTRIC ABADITRAFO 100 KVA3P 100 kVA YZn5 OD 3 3 6 20 Oktober 20253 Desember 2025 SELESAI 4.296.668
28
pajakJanuariPajakTerbayar0465.Pj/DAN.01.01/F09000000/20252025.DSBB.5.003L03PT TRAFOINDO PRIMA PERKASATRAFO 160 KVA3P 160 kVA YZn5 OD 3 3 16 Oktober 202529 November 2025 SELESAI 3.174.556
29
pajakJanuariPajakTerbayar0481.Pj/DAN.01.01/F09000000/20252025.DSBB.4.004L02PT AHA KONSTRUKSI JAYAABADILS BOARD 2 JURUSAN 250 APL-250-2-LBS 12 12 29 Oktober 202527 November 2025 SELESAI 21.594.510
30
Nilai sesuai KR, SPMK done, BG asli diterima 21 NovMaretTerbayar0542.Pj/DAN.01.01/F09000000/20252025.DSBB.5.005L03PT MELCOINDAKWH METER 1 PH PRABAYARMeter 1 Fasa Prabayar 5(60) A 1.234 1.390 1.233 1.568 5.425 17 November 202516 Desember 2025 SELESAI 1.848.135.292
31
Nilai sesuai KR, SPMK done, BG asli diterima 26 NovMaretTerbayar0543.Pj/DAN.01.01/F09000000/20252025.DSBB.5.005L03PT SMART METER INDONESIAKWH METER 1 PH PASCABAYAR Meter 1 Fasa Pascabayar 5(40) A 345 296 644 595 1.880 17 November 202516 Desember 2025 SELESAI 642.546.589
32
SPMK DoneAprilTerbayar0606.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SINARINDO WIRANUSA ELEKTRIKFUSE CUT OUTFuse Cut Out, 24 kV 117 117 30-Des-2528-Jan-26 SELESAI 155.584.260
33
SPMK DoneAprilTerbayar0605.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT GUNABANGSA TEKNIK INDUSTRILIGHTNING ARRESTERLA Polymer SIR, 24 kV, 10 kA 17 17 30-Des-2512-Feb-26 SELESAI 12.508.923
34
Nilai Sesuai KR, SPMK On ProgresMaretTerbayar0603.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT POWERINDO PRIMA PERKASALIGHTNING ARRESTERLA Polymer SIR, 24 kV, 10 kA 206 206 30-Des-2512-Feb-26 SELESAI 151.578.714
35
AprilTerbayar0604.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MULTI KENCANA NIAGATAMAA3CS 150 MM2AAAC-S;150MM2; 9.000 9.000 30-Des-2512-Feb-26 SELESAI 296.772.930
36
Nilai Sesuai KR, SPMK Done, BG diterima 02 Feb 2026 soreAprilTerbayar0612.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TIGA PILAR SAKATOTIANG BESI 9 M. 200 DANTiang Baja 9 m / 200 daN 115 121 30 266 20-Jan-2618-Feb-26 SELESAI 1.060.251.182
37
Nilai Sesuai KR, SPMK Done, BG diterima 02 Feb 2026 soreAprilTerbayar0612.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TIGA PILAR SAKATOTIANG BESI 12 M. 200 DANTiang Baja 12 m / 200 daN 84 84 20-Jan-2618-Feb-26 SELESAI 491.118.670
38
MaretTerbayar0608.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT AHA KONSTRUKSI JAYAABADILS BOARD 2 JURUSAN 250 APL-250-2-LBS 1 1 30-Des-2528-Jan-26 SELESAI 15.979.937
39
AprilTerbayar0609.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT RAHMAT KURNIA ABADILS BOARD 2 JURUSAN 400 APL-400-2-LBS 2 2 30-Des-2528-Jan-26 SELESAI 42.283.754
40
MaretTerbayar0610.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT KURNIA ABADI PADANGLS BOARD 4 JURUSAN 400 APL-400-4-LBS 3 3 30-Des-2528-Jan-26 SELESAI 68.700.148
41
MaretTerbayar0611.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT CANNET ELEKTRIK INDONESIAKWH METER 1 PH PRABAYARMeter 1 Fasa Prabayar 5(60) A 300 300 30-Des-2528-Jan-26 SELESAI 102.201.030
42
MaretTerbayar0613.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT ABB SAKTI INDUSTRIMCB 4A (1P)MCB 1 Phase 4A 1.000 1.000 30-Des-2528-Jan-26 SELESAI 42.013.500
43
AprilTerbayar0614.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TWINK INDONESIAPIN ISOLATORPin Post;24kV;12.5kN;Porcelain 304 304 30-Des-2528-Jan-26 SELESAI 90.913.085
44
AprilTerbayar0614.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TWINK INDONESIASUSPENSION ISOLATORString Kap & Pin;24kV;70kN;Porcelain (set) 203 203 30-Des-2528-Jan-26 SELESAI 132.334.056
45
AprilTerbayar0618.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT VOKSEL ELECTRIC TBKNFA2X 3X70 MM2 + 1X70 MM2NFA2X-T;3X70 + 70MM2;0.6/1KV 10.000 1.000 1.000 12.000 05-Jan-2618-Feb-26 SELESAI 804.778.860
46
AprilTerbayar0623.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MAGNAKABEL NUSANTARANFA2X 3X35 MM2 + 1X35 MM2NFA2X-T;3X35 + 35MM2;0.6/1KV 5.000 2.000 7.000 31-Des-2513-Feb-26 SELESAI 277.871.850
47
AprilTerbayar0622.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SURYAKABEL CEMERLANGNFA2X 3X35 MM2 + 1X35 MM2NFA2X-T;3X35 + 35MM2;0.6/1KV 5.000 5.000 31-Des-2513-Feb-26 SELESAI 198.717.750
48
AprilTerbayar0566.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT PRIMA MITRAINTI SEJATIFUSE CUT OUTFuse Cut Out, 24 kV 18 300 3 321 04-Des-2503-Jan-26 SELESAI 426.859.380
49
MaretTerbayar0562.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT CITRA INTERLINDOFUSE CUT OUTFuse Cut Out, 24 kV 300 300 04-Des-252 Januari 2026 SELESAI 398.934.000
50
MaretTerbayar0567.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT PRIMA MITRAINTI SEJATILIGHTNING ARRESTERLA Polymer SIR, 24 kV, 10 kA 300 300 04-Des-2518-Jan-26 SELESAI 220.745.700
51
AprilTerbayar0563.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SINARINDO WIRANUSA ELEKTRIKLIGHTNING ARRESTERLA Polymer SIR, 24 kV, 10 kA 12 300 3 315 05-Des-2505-Des-25 SELESAI 231.782.985
52
MaretTerbayar0571.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT HEXING TECHNOLOGYKWH STATIK ENERGI LISTRIK FASE TIGA PENGUKURAN LANGSUNG KELAS 1MTR;KWH E; 3P;230/400V; 5-80A; 1; 4W 200 100 50 50 400 12-Des-2510 Januari 2026 SELESAI 824.122.275
53
AprilTerbayar0570.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TIGA PILAR SAKATOTIANG BESI 12 M. 200 DANTiang Baja 12 m / 200 daN 66 406 12 16 500 24-Des-2522 Januari 2026 SELESAI 2.938.101.573
54
AprilTerbayar0585.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT BAKRIE PIPE INDUSTRIESTIANG BESI 9 M. 200 DANTiang Baja 9 m / 200 daN 35 35 24 94 29-Des-2527 Januari 2026 SELESAI 432.493.883
55
AprilTerbayar0585.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT BAKRIE PIPE INDUSTRIESTIANG BESI 12 M. 200 DANTiang Baja 12 m / 200 daN 21 21 29-Des-2527 Januari 2026 SELESAI 155.670.031
56
AprilTerbayar0585.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT BAKRIE PIPE INDUSTRIESTIANG BESI 12 M. 350 DANTiang Baja 12 m / 350 daN 14 67 81 29-Des-2527 Januari 2026 SELESAI 702.137.683
57
AprilTerbayar0585.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT BAKRIE PIPE INDUSTRIESTIANG BESI 14 M. 350 DANTiang Baja 14 m / 350 daN 18 18 29-Des-2527 Januari 2026 SELESAI 267.574.458
58
MaretTerbayar0569.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MELCOINDAKWH METER 1 PH PRABAYARMeter 1 Fasa Prabayar 5(60) A 3.000 1.000 500 500 5.000 05-Des-253 Januari 2026 SELESAI 1.703.350.500
59
AprilTerbayar0568.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MELCOINDAKWH METER 1 PH PASCABAYARMeter 1 Fasa Pascabayar 5(40) A 2.021 1.225 685 1.090 5.021 05-Des-253 Januari 2026 SELESAI 1.716.077.883
60
MaretTerbayar0573.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SURYAKABEL CEMERLANGNFA2X 3X35 MM2 + 1X35 MM2NFA2X-T;3X35 + 35MM2;0.6/1KV 5.000 20.000 25.000 08-Des-2521 Januari 2026 SELESAI 995.253.750
61
MaretTerbayar0578.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT JEMBO CABLE COMPANY TBKNFA2X 3X70 MM2 + 1X70 MM2NFA2X-T;3X70 + 70MM2;0.6/1KV 2.000 6.000 8.000 08-Des-2521 Januari 2026 SELESAI 537.160.080
62
AprilTerbayar0593.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT DUTA TERANG RUBBERINDOLBS MOTORIZE+RTULBS Motorized + RTU 5 5 09-Des-257 Januari 2026 SELESAI 557.575.200
63
MaretTerbayar0577.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT VOKSEL ELECTRIC TBKA3CS 70 MM²AAAC-S;70MM2; 48.000 48.000 08-Des-2521 Januari 2026 SELESAI 903.309.120
64
MaretTerbayar0576.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SUPREME CABLE MANUFACTURING AND COMMERCE TBKNFA2X 3X70 MM2 + 1X70 MM2NFA2X-T;3X70 + 70MM2;0.6/1KV 5.000 13.000 1.000 1.000 20.000 10-Des-2523 Januari 2026 SELESAI 1.342.525.020
65
MaretTerbayar0575.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT JEMBO CABLE COMPANY TBKA3CS 150 MM2AAAC-S;150MM2; 3.000 15.000 18.000 08-Des-2521 Januari 2026 SELESAI 594.161.910
66
AprilTerbayar0580.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MEGA KHARISMA MAKMURNFA2X;2X10MM2;0.6/1KV;OHNFA2X;2X10MM2;0.6/1KV;OH 30.000 18.000 9.000 15.000 72.000 08-Des-2507-Jan-26 SELESAI 388.381.230
67
MaretTerbayar0582.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT BICC BERCA CABLESNYY 1 X 70 MM2NYY;1X70MM2;0.6/1KV;Opstig 1.000 1.000 08-Des-2507-Jan-26 SELESAI 132.012.300
68
MaretTerbayar0583.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT KMI WIRE AND CABLE TBKNYY 1 X 150 MM2NYY;1X150MM2;0.6/1KV;Opstig 1.000 1.000 08-Des-2507-Jan-26 SELESAI 294.125.580
69
AprilTerbayar0579.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT OTHO METRONIK INDONESIAKWH METER 1 PH PRABAYARMeter 1 Fasa Prabayar 5(60) A 1.495 459 245 150 2.349 08-Des-256 Januari 2026 SELESAI 800.234.066
70
AprilTerbayar0581.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT CANNET ELEKTRIK INDONESIAKWH METER 1 PH PRABAYARMeter 1 Fasa Prabayar 5(60) A 1.000 500 300 150 1.950 08-Des-256 Januari 2026 SELESAI 664.306.695
71
MaretTerbayar0586.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT ABB SAKTI INDUSTRIMCB 2A (1P)MCB 1 Phase 2A 2.615 1.135 609 657 5.016 08-Des-2507-Jan-26 SELESAI 210.739.718
72
MaretTerbayar0592.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MEGA CIPTA BANGSAMCB 4A (1P)MCB 1 Phase 4A 2.615 1.135 609 657 5.016 09-Des-2523-Jan-26 SELESAI 210.739.719
73
MaretTerbayar0592.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MEGA CIPTA BANGSAMCB 6A (1P)MCB 1 Phase 6A 3.486 1.514 812 876 6.688 09-Des-2523-Jan-26 SELESAI 280.986.287
74
MaretTerbayar0591.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT MAGNAKABEL NUSANTARANFA2X 3X35 MM2 + 1X35 MM2NFA2X-T;3X35 + 35MM2;0.6/1KV 1.000 1.000 2.000 08-Des-2522-Jan-26 SELESAI 79.320.600
75
MaretTerbayar0587.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT AHA KONSTRUKSI JAYAABADILS BOARD 2 JURUSAN 250 APL-250-2-LBS 4 12 2 1 19 08-Des-2507-Jan-26 SELESAI 303.618.811
76
AprilTerbayar0590.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TRAVESINDO MULTI ELEKTRIKLS BOARD 4 JURUSAN 630 APL-630-4-LBS 10 12 3 25 11-Des-259 Januari 2026 SELESAI 786.664.115
77
MaretTerbayar0589.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SINTRA SINARINDO ELEKTRIKTRAFO 50 KVA3P 50 kVA YZn5 OD 3 10 1 14 10-Des-2523 Januari 2026 SELESAI 560.931.840
78
MaretTerbayar0589.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT SINTRA SINARINDO ELEKTRIKTRAFO 100 KVA3P 100 kVA YZn5 OD 5 5 10-Des-2523 Januari 2026 SELESAI 264.572.718
79
AprilTerbayar0588.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TRIPUTRA ELECTRIC ABADITRAFO 160 KVA3P 160 kVA YZn5 OD 2 5 7 17-Des-2530 Januari 2026 SELESAI 547.052.289
80
AprilTerbayar0588.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TRIPUTRA ELECTRIC ABADITRAFO 250 KVA3P 250 kVA DYn5 OD 2 2 17-Des-2530 Januari 2026 SELESAI 185.312.258
81
AprilTerbayar0594.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TWINK INDONESIAPIN ISOLATORPin Post;24kV;12.5kN;Porcelain 196 2.000 15 9 2.220 22-Des-2520 Januari 2026 SELESAI 663.904.764
82
AprilTerbayar0594.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TWINK INDONESIASUSPENSION ISOLATORString Kap & Pin;24kV;70kN;Porcelain (set) 147 1.000 18 12 1.177 22-Des-2520 Januari 2026 SELESAI 767.276.766
83
AprilTerbayar0620.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT CITRA MAHASURYA INDUSTRIESA3CS 70 MM²CONDUCTOR;AAAC-S;70mm2; 10.000 10.000 31-Des-2513-Feb-26 SELESAI 188.056.200
84
AprilTerbayar0619.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT KABELINDO MURNIA3CS 70 MM²CONDUCTOR;AAAC-S;70mm2; 8.000 8.000 31-Des-2513-Feb-26 SELESAI 150.444.960
85
MeiTerbayar0621.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT TRIPUTRA ELECTRIC ABADITRAFO 50 KVA3P 50 kVA YZn5 OD 4 4 31-Des-2513-Feb-26 SELESAI 160.221.840
86
AprilTerbayar0617.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT ASATA UTAMA ELECTRICAL INDUSTRIESTRAFO 250 KVA3P 250 kVA DYn5 OD 2 2 31-Des-2513-Feb-26 SELESAI 185.312.258
87
MaretTerbayar0615.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT JEMBO CABLE COMPANY TBKNFA2X;2X16MM2;0.6/1KV;OHNFA2X;2X16MM2;0.6/1KV;OH 2.000 2.000 30-Des-2512-Feb-26 SELESAI 16.483.500
88
MaretTerbayar0615.Pj/DAN.01.01/F09000000/20252025.DSBB.4.005L02PT JEMBO CABLE COMPANY TBKNFA2X;4X16MM2;0.6/1KV;OHNFA2X;4X16MM2;0.6/1KV;OH 2.000 2.000 30-Des-2512-Feb-26 SELESAI 32.589.600
89
MaretTerbayar0557.Pj/DAN.01.01/F09000000/20252025.DSBB.5.004L03PT JEMBO CABLE COMPANY TBKNFA2X 3X70 MM2 + 1X70 MM2NFA2X-T;3X70 + 70MM2;0.6/1KV 1.000 1.000 1.000 1.000 4.000 03-Des-2516-Jan-26 SELESAI 268.204.860
90
91
SPK
92
SPMK No. 2814.BA/DAN.01.01/F09000000/2025MaretTerbayar0550.PJ/DAN.01.01/F09000000/20252025.DSBB.6.001L04PT PLN ELECTRICITY SERVICESUGB 250 KVAUGB 250 KVAUnit 2 2 1 Desember 202528 Februari 2026 SELESAI 1.345.625.028
93
SPMK No. 1680.BA/DAN.01.01/F09000000/2025JuniTerbayar0390.PJ/DAN.01.03/F09000000/20252025.DSBB.5.001L03PT ARLISCO MANDIRI PERKASAKAPASITOR BANK 3X(100-300KVAR) + JUMPERAN + CONTROLKapasitor TMSet 1 1 2 21 Agustus 202517 Januari 2026 SELESAI 952.380.000
94
SPMK No. 0147.BA/DAN.01.01/F09000000/2026MaretTerbayar0607.PJ/DAN.01.03/F09000000/20252025.DSBB.6.001L04PT PUTERA PERSADA JAYAPERALATAN PDKBPengadaan Peralatan Kerja PDKBSet 2 1 3 20-Jan-202620-Mar-26 SELESAI 397.025.545
95
SPMK No. 0147.BA/DAN.01.01/F09000000/2026AgustusTahap 2 - OpharBASTB0607.PJ/DAN.01.03/F09000000/20252025.DSBB.6.001L04PT PUTERA PERSADA JAYAPERALATAN PDKBPengadaan Peralatan Kerja PDKBSet 2 1 3 20-Jan-202617-Jul-26 TERLAMBAT 1.910.335.697
96
pajakJanuariPajakTerbayar0369.Pj/DAN.01.01/F09000000/20252025.DSBB.6.001L04PT KARYA DELTAMAS ABADIMOBILE CRANEMobile Crane 3 Ton11 Agustus 202523 Desember 2025 SELESAI 351.573.750
97
pajakJanuariPajakTerbayar0389.PJ/DAN.01.01/F09000000/20252025.DSBB.6.001L04PT TRITUNGGAL SWARNAUPS MOBILE 30 KVAUPS Mobile 30 kVAUnit 1 1 1 1 4 4 Agustus 20252 November 2025 SELESAI 117.765.360
98
SPMK No. 2572.BA/DAN.01.01/F09000000/2025MaretasyrafTerbayar0523.PJ/DAN.01.01/F09000000/20252025.DSBB.6.001L04PT ANGKASA DAYA ASKARAPERALATAN UJI KWH 3 PHASAPeralatan Uji Tera Kwh 3 PhasaSet 1 1 17 November 20253 Januari 2026 SELESAI 1.492.950.000
99
pajakJanuariPajakTerbayar0018.SPK/DAN.01.01/F09000000/20252025.DSBB.5.005L03PT HEXING TECHNOLOGYKWH METER 3PH PRABAYARKwh Meter 3 Phasa PrabayarBuah 53 5 58 4 September 20254 Oktober 2025 SELESAI 11.244.314
100
SPMK No. 2572.BA/DAN.01.01/F09000000/2025JuliTerbayar0552.Pj/DAN.01.01/F09000000/20252025.DSBB.4.001L02PT EGA TEKELINDO PRIMAAir Insulated Switchgear; Metering; 24kV; 630A; 25kAAir Insulated Switchgear; Metering; 24kV; 630A; 25kASet 1 1 01-Des-2529-Jan-26 SELESAI 311.545.920