Customer NameIndustryRecord RetentionQuality Agreement SignedQuality Assurance Clauses, Manual, TermsPurchase Order
T & C's
AS9100ISO 9001ISO 1348521-CFR-820
QMS standards
21-CFR part 11SFDCLChange NotificationCriteria for ChangeChange Notification TimelineGCM Notes/Comments
6
Abbott (Thoratec)Medical10 yearsby PSP in 2021N/AMar-23XXXApproval/Validation RequiredMaterial substance change/% composition change,
Change in process and/or sampling methods,
Inspection methods,
Location,
ISO/Regulatory status,
Significant QMS change,
QMS/Management Change that affects component,
Change in suppliers,
Change in process that can affect Environment,
Component availability/obsolescence
10 days or 180 days. Email into VN to request clarification.Customer requires validation of product in order to manufacture in the new facility. Customer did not state that manufacturing at the new facility without our iso 13485 cert there was unacceptable.
7
Ad-Tech Medical15 years or (end of life of product)Both in 2013N/AN/AXXApproval/Validation RequiredAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
8
Aerojet Rocketdyne (L3Harris)Aerospace6 years N/AQA-01.1XXEmail Notification of ChangeThe Supplier is required to have a change management system to manage any changes in material, items, services, and processes. The Supplier and its suppliers and subcontractors are prohibited from making any design, manufacturing, or location changes during or between purchase order changes or incorporating any alterations without written notification and approval from L3Harris’ procurement representative. Design or manufacturing changes are defined as anything that alters or may alter form, fit, function, safety, reliability, maintainability, or weight of the item or processes (processes include but not limited to design, fabrication, assembling, machining, finishes, testing, marking, storage, firmware, software, programming, packaging, or delivery).
2.2.2 Prior to manufacturing or delivering any items incorporating a change as defined above, the Supplier shall provide advance notice to L3Harris in sufficient time to reasonably evaluate the proposed change and, if necessary, to place an end-of-life order for the unchanged items. The Supplier shall provide a notice a minimum of 30 calendar days prior to the change.

Supplier shall notify L3Harris in writing promptly, if there are any changes in the Supplier’s quality management system. These are inclusive of the following:
2.2.4.1 Quality System: Changes in Supplier’s registration and/or quality system status resulting from update, loss, suspension, probation, disapproval, withdrawal of 3rd party registrar’s certification from actions resulting from the Government, Federal or Civil Aviation, Defense, or any other regulatory agencies.
2.2.4.2 Relocation: A change in Supplier’s name, ownership, transfer of manufacturing operation or facility location may subject the supplier’s system and processes to reevaluation by L3Harris. If required by L3Harris, Supplier shall submit a validation and contingency plan inclusive of open orders, open POs, items, material on hand, etc. for all items affecting all L3Harris’s item and facilities. The Supplier shall provide the procurement representative with the change plan in writing at a minimum of 60 days prior to the change occurring.
2.2.4.3 Work Transfer: A work transfer risk mitigation plan must be submitted via SCR by the Supplier for approval by L3Harris a minimum of 60 days prior to the change. Supplier shall not proceed with work transition without written approval from L3Harris. In the event of a relocation and/or work transition, requalification may be required.
Supplier shall notify L3Harris in writing promptly, if there are any changes in the Supplier’s quality management system. These are inclusive of the following:
2.2.4.1 Quality System: Changes in Supplier’s registration and/or quality system status resulting from update, loss, suspension, probation, disapproval, withdrawal of 3rd party registrar’s certification from actions resulting from the Government, Federal or Civil Aviation, Defense, or any other regulatory agencies.
2.2.4.2 Relocation: A change in Supplier’s name, ownership, transfer of manufacturing operation or facility location may subject the supplier’s system and processes to reevaluation by L3Harris. If required by L3Harris, Supplier shall submit a validation and contingency plan inclusive of open orders, open POs, items, material on hand, etc. for all items affecting all L3Harris’s item and facilities. The Supplier shall provide the procurement representative with the change plan in writing at a minimum of 60 days prior to the change occurring.
2.2.4.3 Work Transfer: A work transfer risk mitigation plan must be submitted via SCR by the Supplier for approval by L3Harris a minimum of 60 days prior to the change. Supplier shall not proceed with work transition without written approval from L3Harris. In the event of a relocation and/or work transition, requalification may be required.
9
AlconMedical15 yearsN/AVersion 10XXEmail Notification of ChangeAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
10
AllvarIndustrial Currently Allvar does not have any setup
11
American Machining SolutionsIndustrial
12
AmphenolAerospace10 yearsN/ARev 34Rev 14XEmail Notification of ChangeAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
13
ArcherAerospace15 yearsN/ARev CNo rev but Copyright 2024XX
14
Art RobbinsMedical15 yearsN/AN/AStandardXAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
15
ArthrexMedical• 5 years for hand instruments and components
• 10 years for sterile instruments
• 20 years for metallic and non-metallic implants
• Sterilization Validations: Permanent
YesN/AOn POs - No revXEmail Notification of ChangeProduct / Process Changes For ARTHREX Design Devices manufactured by SUPPLIER to ARTHREX specifications, if changes from approved manufacturing processes, drawing specifications, written specifications and/or purchase order specifications are desired, changes must be submitted to ARTHREX for written approval. This request should be directed to ARTHREX, Inc. Quality Engineering. Changes should be submitted prior to the completion of product to avoid loss of time and possibly scrapping of product. If the SUPPLIER is at any time unsure as to how to proceed, SUPPLIER shall immediately contact the ARTHREX, Inc. Supply Chain Representative and/or Quality Engineer assigned to the product affected prior to proceeding. When contacting Arthrex regarding a proposed change, the following initial information shall be made available to Arthrex:
1. The specific material or process that will not conform.
2. The specification(s) that will not be met and the reason(s) for the nonconformance.
3. The effective dates or batch/serial numbers to which the Deviation applies.
4. The purchase or production order numbers involved.
For product manufactured by SUPPLIER to ARTHREX specifications, no changes in special processes are permitted unless the process has been re-validated and the revalidation approved by ARTHREX, Inc. The efficacy of cleaning validations and the safe performance of ARTHREX products, together with those distributed by ARTHREX, rely heavily on the assurance that materials of construction and materials which come into contact with product and components do not change since the initial product manufacturing and/or cleaning validations were performed and qualified. For product manufactured by SUPPLIER to ARTHREX specifications, ARTHREX is requiring that the SUPPLIER contact and obtain the written consent of ARTHREX prior to implementing any changes affecting the composition, design, performance, cleanliness, bioburden or safety of the supplied component. Such changes include, but are not limited to, changes in materials of construction, cleaning procedures, and chemicals used in production (for example, cleaning fluids, solvents and cutting oils). ARTHREX also requests notification of changes that may not be immediately obvious but may affect the performance of the device. For example, substantial equipment/method changes, cleaning processes, etc. For Design devices manufactured by SUPPLIER to ARTHREX specifications, FORM- 000122063, “Supplier Proposed Process Change (SPPC) Form” is to be used to notify ARTHREX prior to changes in the production process by emailing the aforementioned form to SPPC@Arthrex.com. The change is not to be implemented without prior written approval of ARTHREX. If any change as defined above involves proprietary processes, it does not relieve the SUPPLIER of the obligation to provide prior notification to ARTHREX regarding a proposed change.
Such changes include, but are not limited to, changes in materials of construction, cleaning procedures, and chemicals used in production (for example, cleaning fluids, solvents and cutting oils). ARTHREX also requests notification of changes that may not be immediately obvious but may affect the performance of the device. For example, substantial equipment/method changes, cleaning processes, etc. For Design devices manufactured by SUPPLIER to ARTHREX specifications, FORM- 000122063, “Supplier Proposed Process Change (SPPC) Form” is to be used to notify ARTHREX prior to changes in the production process by emailing the aforementioned form to SPPC@Arthrex.com. The change is not to be implemented without prior written approval of ARTHREX. If any change as defined above involves proprietary processes, it does not relieve the SUPPLIER of the obligation to provide prior notification to ARTHREX regarding a proposed change.

16
Atec SpineMedical15 yearsYesN/ANo rev XXXChange Okay
17
Avanos Medical (Haylard)Medical15 yearsN/AN/AVersion 1XEmail Notification of ChangeAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
18
Benchmark ElectronicsMedical15 yearsN/ARev L2019-0923XApproval/Validation RequiredCustomer requires validation of product before sending production parts in. Customer did not state that manufacturing at the new facility without our iso 13485 cert there was unacceptable.
19
Bio-RadMedical5 yearsN/AN/A9/5/2015XX
20
Boston ScientficMedical15 yearsN/AN/AOn PO's, No RevXApproval/Validation RequiredCustomer email for expansion: We will need to onboard any new manufacturing facility and re-qualify material from that location before being able to receive product from that location for production use.Website is very limited on info
21
Calmax TechnologyOther15 yearsN/ASupplier Requirements Manual: QP8-002, Rev 3last updated 07/23/13XApproval/Validation RequiredChanges include but in limited to: (Requires a one (1) year notification)
4.8.1. Supplier sub-tier sourcing change
4.8.2. Facility relocation (moving to new physical address Includes: Different Street, City, Country
4.8.3. Facility expansion (new building, expansion of existing building
Must complete the QF8-006 Supplier Notification Request Form
22
Cardiva MedicalMedical15 yearsN/AN/AN/AXAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
23
CelesticaOther15 yearsOnly signed by PSP in 2019QSPECS listed on website https://www.celestica.com/suppliersOn POs: Form # CLSCORP-STDPOT&C (10-21)XX
24
CepheidMedical15 yearsN/AN/AOn PO's, No RevXXApproval/Validation RequiredAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
25
Cera-MetAerospace10 yearsN/AN/AOn website, no revisionXXApproval/Validation Required
26
ConMedMedical15 years8/15/2018N/ARev AXXApproval/Validation RequiredAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
Quality agreement says meet 21-CFR-820 or ISO 13485. PSP meets both requirements
27
CovalAerospace
28
Crane AerospaceAerospace10 yearsN/ANEWOct-22XXApproval/Validation RequiredQMS changes, required certficationsCrane will require a list of PN's requesting to be moved, they want FAI's on all those PN's, list of any new vendors being used, and they want to conduct a quality audit.Website is very limited on info
29
Dolphin Data CaptureMedical15 yearsN/AN/ASee CepheidX
30
Donaldson CompanyAerospace15 years7/8/2021May 2021, Rev 24On PO's, No Rev but dated 2021XXApproval/Validation Required
31
Duqueine Aerospace15 yearsN/AN/AOn PO's (but in French)XXCan't find a way to translate their T&C to English
32
ECA Medical InstrumentsMedical15 yearsSigned by both in 2019N/AOn PO'sXEmail Notification of ChangeAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
33
Edwards LifesciencesMedical15 yearsby both in 2020N/AOn PO's, No RevXApproval/Validation RequiredAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit. Requested NOC for Inner Nut and Edwards Knobs and that is in process, PSP completing runs and sending to Edwards per their request during conference call for validation of product in NC.
Customer stated in
34
Embraer Aero Seating Tech.Aerospace5 yearsN/ARev LOn PO's, No RevXEmail Notification of ChangeWant to check on their portal and see if there are updated QMS
35
Emcore CorporationAerospace10 yearsN/AN/ALast updated 04/27/21, Purchasing T&C on PO, Rev LXXApproval/Validation Required
36
Esterline MasonAerospace10 yearsN/ARev E 02/01/2110/07/20 Rev DXXApproval/Validation Required
37
Fabrication SpecialtyAerospace10 yearsN/ARev H.02Rev 01/2023XEmail Notification of Change
38
Flextronics Int. MechanicalsSemi Conductor7 yearsN/ARev DOn PO's Rev PXXEmail Notification of Change
39
Flir Systems IncIndustrial15 yearsN/ARev ERev EXXApproval/Validation Required
40
General DynamicsAerospace7 yearsN/AGeneral Dynamics Mission System Quality Codes- 04-17-232023XXEmail Notification of ChangeReference QA019, QA 020, QA021 in Quality Codes manual
41
Inficon AGSemi Conductor15 yearsN/AN/ARev 08/03XXApproval/Validation RequiredFor non critical parts, you can make the change without approvals.Arben responded to email sent for notification of new site with "all good". From my understanding this means no validation required but we will want to see what Lam's process is as it would most likely be the same.
42
Intuitive SurgicalMedicalN/AN/ARev 6XEmail Notification of Change
43
Henry Servin (Hsands)Semi ConductorN/AN/ARev BOn file, no revXEmail Notification of Change
44
JabilSemi Conductor10 yearsSupplier Manual (RO-RG60-00006, Rev P)Rev 05/2018Email Notification of Change
45
Joby AviationAerospace10 yearsN/AQuality Ts&Cs Rev GRev 8/15/22XXEmail Notification of ChangeDefined in Quality Terms36 hours
46
KapstoneMedical15 yearsSigned by PSP 09/18/23 N/AN/AXXXXEmail Notification of ChangeExamples requiring notification and FAI resubmission/process validation:
o Material change or new material supplier
o Special process change including heat treatment: cleaning, coating, etc.
o New or modified production tooling
o Relocating equipment within a site
o MFG location change
o New sub-supplier or sub-supplier process change
Must use FORM-2033 and submit to Kapstone supply chain management
47
Karl Storz Imaging, Inc.Medical15 yearsSigned by both in 2020M528 Rev IOn PO, No RevXXEmail Notification of ChangeEmail the notifiation of change and document in correspondence folder
48
KLA Semi Conductor15 yearsN/ANANAXEmail Notification of Change
49
Lam Research CorporationSemi Conductor15 yearsN/A2013 Rev 4Apr 2024XApproval/Validation RequiredFor non critical parts, you can make the change without approvals.9 months
50
Magnetic Component Eng. Inc.Aerospace7 yearsN/AN/ASPOCs Rev 20 XXApproval/Validation RequiredNot defined on T&C 90 days in the event of relocation.
51
Medical Instrument Dev. Lab (MidLabs)Medical15 yearsSigned by PSP 12/16/19N/AOn PO, Rev DXXApproval/Validation RequiredMidlabs said they would need and audit to evaluation the new location.
52
Medshape, IncMedical7 yearsSigned by both in 2017N/AN/AXXApproval/Validation Required
53
MedtronicMedical15 years NAOn PO, Quality Clauses version B
Supplier Quality Manual 019-G034 Rev C
Supplier Quality Agreement Doc# D01095330 Rev A
D00006149 Version DXXXApproval/Validation RequiredQuality clauses are listed on T&C but there is also a Quality Manual
54
Meggitt Sensing SystemsAerospace15 yearsN/ARev ADDated 10/07/2020XXApproval/Validation Required
55
Microsoft HoloLensSemi Conductor4 yearsN/AN/ADated 01/2020XEmail Notification of Change
56
MPS MicrosystemsMedical20 yearsN/AN/ANo dateXXChange Okay
57
OEM Systems Co., LtdMedical15 yearsN/AN/AN/AXApproval/Validation RequiredAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
No T&C, no qaulity statement, they also don't have a website
58
Pacific Aerospace & ElectronicsAerospace10 yearsN/ARev NCRev BXXApproval/Validation RequiredPAC Initiated Changes: The Supplier shall incorporate, at the specified and agreed upon effectivity points, all changes initiated by PAC and communicated to the Supplier through a formal Contract change and/or amendment. Such changes may be in the form of revised drawings, specifications, tests, inspection or machining methods, etc., and may apply to products as well as to the Supplier's management and administrative systems. The Supplier's business management system shall include appropriate controls and records, including controls at the Supplier's sub-tier sources, which provide objective evidence that changes were incorporated as required by the Contract. Objective evidence may be in the form of date, lot, serial number, revision letter, or other positive identification. Such records are subject to on-site verification by PAC at the Supplier's facilities or the facilities of the Supplier's sub-tier sources.

Supplier Initiated Changes: The Supplier may not make any changes in product design, drawings, performance specifications, materials or processes without specific approval by PAC in writing prior to making such changes in products or data. When applicable, the Supplier shall flow-down this requirement to the Supplier's sub-tier sources. The Supplier shall furnish a copy of the change prior to the initial delivery of products to PAC, so that PAC can verify that the change does not violate the above requirements.
59
Pacific ScientificAerospace7 yearsN/A842BJ 12/21Listed on POsXApproval/Validation RequiredA change is identified as any changes in company ownership, materials, configuration, process, sub-tier suppliers, inspection testing methods, techniques and/ or facility changes prior to the start of fabrication (notification is defined as a minimum of ninety (90) calendar days prior to change). Such changes or events may negate all previous PacSci EMC supplier qualifications, certifications, approval status, and may require re-qualification or re-submittal of a First Article. Supplier requests are to be submitted on PacSci EMC form #2030, Vendor Information Request (VIR), available on the web at psemc.com.90 days
60
Parker HannafinAerospace15 yearsN/APH-SQRM Ver. 8/22Dated 07/23XEmail Notification of ChangeSuppliers shall not make changes to their processes, location, facilities, equipment, material, product
design ( or any change which may affect productdesign orfunction )withoutwritten approval from the
Parker Buyer for:
• Correction of a discrepancy on a previously submitted part;
• Product modified by an engineering change to design records, specifications, or materials; or
• Any planned changes bythe Suppliertothedesign, process, or manufacturing location, such as:
o Use of other material than was used in previously approved part or product
o Production from new, additional, replacement or modified tools, dies, molds, patterns,
etc.
o Production following upgrade or rearrangement of existing tooling or equipment
o Production from tooling and equipmenttransferred to a different plant site or from an
additional plant
o Change of sub-tier Supplierfor parts, nonequivalent materials, or services ( e.g. heat
treating, plating, etc.)
o Product produced after tooling has been inactive for production for 12 months or more
o Change to test/inspection method-new technique (no effect on acceptance criteria)
o For bulk materials: new source of raw material from new or existing Supplier, or change
in product appearance attributes, etc.
o Use of any non-conventional manufacturing methods such as electro-discharge
machining (EDM), electro-chemical machining (ECM), laserorabrasivewaterjet metal
cutting, flame spray coatings, etc.
Before submitting to Parker a requestfora permanent change to a Supplier-controlled design, the
Supplier shall review the FM EA and Control Plan, as applicable, to ensure that all process-related issues
have been addressed and resolved. Parker may require the Supplierto su bmitan updated FM EA and
Control Plan prior to approval of such permanent changes. Parker may also require other portions, or all,
ofthe related qualification process to be repeated. In some cases, Parker may electto review Supplier
proposed permanent changes at the Supplier's facility.
61
PentaxMedicalOn file, not signed by anyoneNo Rev, on websiteCustomer informed us they are not required to provide us any information such as ISO certs, Quality Agreements, T&C, etc. for our files
62
Polymicro/Molex Industrial15 yearsN/ARev DRev DEmail Notification of ChangeMolex acquired Polymicro
63
Porvair Filtration GroupAerospace15 yearsN/AN/AOn PO, No RevXXApproval/Validation Required
64
Propel OrthodonticsMedical15 yearsN/AN/AN/AXChange OkayAlerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
65
Protonex LLC (PNI Corp) Aerospace15 yearsN/AN/AN/ACan't find their customer folder in the O: Drive
66
QuallionAerospace10 yearsN/ARev E20-MayXXApproval/Validation RequiredA Material Safety Data Sheet as specified in 29 C.F.R. 1910.1200 must accompany each
67
Redwire (Deployable Space Systems)Aerospace7 yearsN/AQA-049 Rev UN/AX
68
RH USA, Inc.Aerospace/
Industrial
10 years8/25/2021N/AN/AXXChange Okayshipment or be available online.
69
Richard Johnson ManufacturingIndustrial15 yearsN/AN/AN/AWe have zero info on this company. No T&C, no qaulity statement, no webiste. Are they still in business? 10/03/22 - web search shows they are premanently closed.
70
Sanmina CorporationMedical3 yearsN/ARev VRev 05.10.18XApproval/Validation RequiredSupplier shall notify Sanmina of all proposed changes that impact the form, fit, function, quality, reliability,
process, product, services or status of the Material with regard to environmental legislation such as (by
way of example and not limitation) the EU Directive 2011/65/EC on the restriction of the use of certain
hazardous substances (collectively all environmental legislation to be referred to herein as “ROHS”).
Notification shall be provided via an engineering and/or process change request per J-STD-046.
Changes affecting a significant amount of parts defined as greater than fifteen part numbers shall be
accompanied with an Excel file listing those affected part numbers. All Supplier notifications shall be sent
to Sanmina via email to the following Sanmina address: pcn.eol@sanmina.com. The types of changes,
as an example, requiring notification include, but are not limited to:
 Changes in components (die shrink, etc.)
 Reduced inspection and/or testing
 Manufacture site changes
 Deviations from the MT&Q plan
 Changes in packing, shipping and labeling of Product or containers
 Product discontinuance
 Changes in Supplier or Manufacturer part number or name
 Changes to software or firmware
 Work transfer from the organization to an external provider, or from an external provider to another
external provider
90 Days prior to any changes Alerted customer of the expansion. No response or no issues noted with manufacturing prior to ISO 13485 extended scope audit.
71
Semi Mechatronics (Refer to Lam requirements)Industrial
72
Senior Aerospace Metal BellowsAerospace7 yearsN/ARev YOn PO, Rev C XApproval/Validation RequiredThey only had ISO 14001 and 18001 cert on their website
73
Talus (Refer to Lam requirements)
74
Therm-XSemi Conductor7 yearsN/ARev 1On PO, No RevXXApproval/Validation RequiredI just found that "Machine Shop" was an interesting work code industry in E2.
75
ThermOmegaTechAerospace10 yearsN/AN/AR6.5 Rev: 004XXEmail Notification of Change
76
True Digital SurgeryMedical
77
Trust AutomationAerospace7 yearsN/AN/ANo Rev, date is 05/08/22XEmail Notification of Change
78
Vacuum Process Engineering, Inc.Aerospace7 yearsN/ARev MRev CXXApproval/Validation Required
79
Viper NorthwestSemi Conductor7 yearsN/ARev 7.009/3/2019XEmail Notification of Change
80
Worth ProductsIndustrial
81
ZoetisMedical15 yearsN/AN/AVersion 2N/AN/AWebsite has very limited information
82
Zoll CirculationMedical2 yearsN/AN/AOn PO, No RevXApproval/Validation RequiredPer quality agreement, PSP must meet the requirements of ISO 13485, ISO 9001 or 21 CFR 820
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100