QUFSD - Remediation Plan for Water Testing Locations Where Results for Lead were above 15 ppb Threshold Levels
2
High School Bldg Sample #Sample LocationResultsShort Term Remediation PlanLong Term Remediation PlanTarget Date for CompletionActual Date Completed
3
HS-021Shop Room 14820.0Install temporary signage, Use Sink/Faucet for handwashing ONLYPost permannt signs and address as necessary in Legacy Project since this area will be renovated. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
4
HS-031Faculty Bath by Main Office16.2Install temporary signage, Use Sink/Faucet for handwashing ONLY Post permannt signs and address as necessary in Legacy Project since this area will be renovated. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
5
HS-039Nurse Office Sink33.1Install temporary signage, Replace Fixture and re-test, provide bottled water until sink is replaced, Post permannt signs and replce fixture. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; Replace faucet by the end of December and retest results.
6
HS-066Boys Locker Coach Sink230Install temporary signage, Use Sink/Faucet for handwashing ONLYPost permannt signs and address as necessary in Legacy Project since this area will be renovated. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
7
HS-068Girls Locker Sink 120.3Install temporary signage, Use Sink/Faucet for handwashing ONLY Post permannt signs and address as necessary in Legacy Project since this area will be renovated. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
8
HS-075Students by 25624.8Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage - Address in Legacy Project. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
9
HS-083Exterior Hose Bib: West Side419Install temporary signage, Use for non-potable water useage only - replace - Access requires special tool to turn on waterInstall permanent signage - Address in Legacy Project. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
10
HS-084Exterior Hose Bib: East Side1,900Install temporary signage, Use for non-potable water useage only - replace - Access requires special tool to turn on waterInstall permanent signage - Address in Legacy Project. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
11
HS-085Exterior Hose Bib: North Side75.9Install temporary signage, Use for non-potable water useage only - replace - Access requires special tool to turn on waterInstall permanent signage - Address in Legacy Project. Re-test results identified lead levels less than threshold. This indicates that the fixture is the cause of the problem. Post permanent signs by end of December 2016; remove or replace fixture during Capital Project
12
13
Concession Bldg Sample #Sample LocationResultsShort Term Remediation PlanLong Term Remediation PlanTarget Date for CompletionActual Date Completed
14
CS-21Exterior Hose Bib: NW Corner79.5Use for non-potable water useage only - install permanent signageInstall permanent signage; use only as non-potable water source. By end of December 2016
15
16
17
Elementary School Bldg Sample #Sample LocationResultsShort Term Remediation PlanLong Term Remediation PlanTarget Date for CompletionActual Date Completed
18
ES-033Kitchen - West Hand Washing Sink45Use for non-potable waterInstall permanent signage; re-test and base remediation efforts on the results of re-testing. Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
19
20
21
Middle School Bldg Sample #Sample LocationResultsShort Term Remediation PlanLong Term Remediation PlanTarget Date for CompletionActual Date Completed
22
MS-0061st Floor West Wing Boys Room Right Sink25Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage; re-test and base remediation efforts on the results of re-testing. Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
23
MS-026Girl's Coach's Office Bathroom Sink310Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage; re-test and base remediation efforts on the results of re-testing. Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
24
MS-046Tech Wing Hall Girls Bathroom17Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage; re-test and base remediation efforts on the results of re-testing. Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
25
MS-004Room 121 Front Desk23Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage - this is a Lab faucet/sink and these are not to be used for potable water.Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
26
MS-013Room 216 Front Desk Sink28Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage - this is a Lab faucet/sink and these are not to be used for potable water.Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
27
MS-032Room 123 Front Desk Sink30Install temporary signage, Use Sink/Faucet for handwashing ONLYInstall permanent signage - this is a Lab faucet/sink and these are not to be used for potable water.Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
28
MS-050Basement Tech Break Room26Install temporary signage, Use Sink/Faucet for handwashing ONLY; sink is used for dringing water source - provide bottled water for drinking purposes. Install permanent signage; re-test and base remediation efforts on the results of re-testing. Post permanent signs until faucet is replaced - post signs by end of December 2016.
Update plan as follow-up testing dictates.
29
MS-0326th Grade Phys. Ed. Sink15Results areabove the 15 ppm threshold for remediationNo remediation required. Does not exceed threshold limit. NA
30
31
32
Intermediate School Bldg Sample #Sample LocationResultsShort Term Remediation PlanLong Term Remediation PlanTarget Date for CompletionActual Date Completed
33
ALL SAMPLES TESTED WERE BELOW 15 ppb THRESHOLD LIMITALL SAMPLES TESTED WERE BELOW 15 ppb THRESHOLD LIMIT - No remediation plan requiredALL SAMPLES TESTED WERE BELOW 15 ppb THRESHOLD LIMIT - No remediation plan requiredNA
34
35
36
37
NYSDOH Action Level for Lead of 15 ppb
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
Main menu