Filing requirement
2
Standards & zoning criteria
3
Site Suitability Standards
4
5
6
7
8
9
Submitted by Michael DeChiara, ShutesburySTATATORY MANDATE TYPE
WHEN APPLIED
REGULATORY BODY
SUGGESTED CRITERIA OR STANDARD / REFERENCES
10
Pre- FilingWith ApplicationPrior/During ConstructionPost ConstructionDOER standardLocal Standard
11
DOCUMENTATION & SUBMISSIONS
12
General Information:
13
Name and contact info of landowner, operator, developer/agent, and onsite emergency contactFiling requirementXX
14
Community Interaction:
15
Community engagement plan Filing requirementXXRequires meetings within the borders of the municipality at times of day accessible to residents with broad and adequate notification via multiple methods
16
Proof of community engagement – at least two public meetings within the municipality at times that are accessible to the residents.Filing requirementXX
17
Substantive documentation of responses from public meetings and any submitted materials from the publicFiling requirementXXVerbatim or detailed responses reflecting community input to inform regulatory review
18
Documentation of outreach materials planned or usedFiling requirementXX
19
Documentation of meeting with the permit authorities prior to a application Filing requirementXXMeeting to informally present plans and get pre-application feedback
20
Project notification to abuttersFiling requirementXXRequired by Mass. law
21
Project notification for Historic and Cultural Mitigation to state and local historic preservation, state and federally recognized Indigenous tribal governments or organizationsFiling requirementXXAt least 45-60 days allowed for responses
22
Proof of notificationsFiling requirementXX
23
Copies of responses from recipients of notificationsFiling requirementXXTo inform regulatory review
24
Project Design and Specs:
25
Plans, blueprints drawings, and maps prepared, stamped and signed by professional Civil Engineer licensed to practice in Mass.Filing requirementXX
26
Site survey signed by Professional Land SurveyorFiling requirementXX
27
Proposed changes resulting in disturbance or alteration of land and natural resourcesFiling requirementXX
28
Electrical schematics (including one or three line diagrams)Filing requirementXXalso to be submitted for review by Fire Dept
29
Wattage rating of proposed systemFiling requirementXX
30
List of offsite electrical upgrades required/plannedFiling requirementXX
31
Technical specs of all large systems to be installedFiling requirementXX
32
Location and details of security measuresFiling requirementXX
33
Operations plan descriptionFiling requirementXX
34
Visualization of post-construction developmentFiling requirementXX
35
Statement Regarding Mitigation Hierarchy including why development is neededFiling requirementXXTo determine why site is being proposed and documentation of mitigation hierarchy actions
36
Documentation from utility allowing for interconnection (not actual approval)Filing requirementXX
37
Stormwater management plan Filing requirementXX
38
Mapping and delineation of wetlands; approvals by Conservation Commission
Filing requirementXXMA DEPWPA Form 4a – Abbreviated Notice of Resource Area Delineation (ANDRAD)
39
List of chemicals and hazardous materials to be used in construction and operationFiling requirementXX
40
Material data sheets including for cleaning, maintenance and operationFiling requirementXX
41
Description of anticipated earthwork operationsFiling requirementXX
42
Proof of site controlFiling requirementXX
43
Operation and maintenance planFiling requirementXX
44
Energy Storage System design specificationsFiling requirementX
45
Safety and Emergency Management:
46
Emergency response plan including project summaryFiling requirementXX
47
Approvals of emergency plan by local emergency responders- Fire, Police and Emergency Management.Filing requirementXX
48
Provision of adequate water source for fire protection (primarily in case of ESS fire)Filing requirementXX
49
Finances and Insurance:
50
Proof of liability insutranceFiling requirementXX
51
Surety depositFiling requirementX
52
Assessments/Reports:
53
Pre Construction photos from right of way and abuttersFiling requirementXX
54
Existing conditions report including mapping and descriptions of locations of natural and cultural resources ( agricultural, wetlands, water systems, Biomap, Natural Heritage and Endangered Species Program, Estimated and Priority Habitats, Scenic Roads and Byways, indigenous sacred landscapes, Historical and cultural resources)Filing requirementXX
55
Inventory of trails and recreational areas effected or abuttingFiling requirementXX
56
Documentation of tree cover – height, location, etcFiling requirementXX
57
Documentation of soil typesFiling requirementXX
58
Hydrogeology Assessment including groundwater recharge analysis; hydrologic and hydraulic design calculationsFiling requirementXX
59
Noise assessment from an acoustical engineerFiling requirementXX
60
A Cumulative Impact AssessmentFiling requirementXXClean energy Law line 111
61
Cultural Resource Management Plan (CRMP) or a Historic Properties Management Plan (HPMP) Filing requirementXUS DOE example for reference
62
A Phase I Cultural Resource Survey ReportFiling requirementXXDescription from NY State for background information
63
Climate Sequestration Rating (per clean energy law)Filing requirementXClean Energy Law line 120
64
Energy Storage Hazard Mitigation AnalysisFiling requirementXArticle for reference
65
Glare analysisFiling requirementXXArticle for reference
66
Reporting
67
Annual Report to Permit granting authorityFiling requirementXX
68
Annual or As Needed Updates to Public Safety officialsFiling requirementXXContact info will change with changing operators and owners
69
Annual Report to DOER (for publicly accessible website)Filing requirementXXWith data for posting to public website
70
Annual or As Need Contact information Filing requirementXX
71
Transfer of Ownership or Operations
72
Document of assumed obligations of applicantFiling requirementXX
73
Abandonment or DeCommissioning
74
Removal requirements and guidelinesStandards & zoning criteriaXX
75
Restoration of site requirements and guidelinesStandards & zoning criteriaXX
76
77
DESIGN AND PERFORMANCE STANDARDS
78
Proof of compliance with local, state and federal lawsStandards & zoning criteriaXX
79
•                  Mass. Endangered Species Act (MESA)Standards & zoning criteriaXXReference
80
•                  Mass. Wetlands Protection Act (WPA) Standards & zoning criteriaXXReference
81
•                  Mass. Environmental Policy Act (MEPA) Standards & zoning criteriaXXReference
82
•                  Mass. Forest Cutting Practices Regulations Standards & zoning criteriaXXReference
83
•                  State or local Wetlands Protection (whichever is determinant) Standards & zoning criteriaXXReference
84
•                  U.S. Endangered Species ActStandards & zoning criteriaXXReference
85
•                  National Historic Preservation Protection Act (NHPA)Standards & zoning criteriaXXReference
86
Setbacks (min, max)- front, back and sideStandards & zoning criteriaXXReasonable might be 100-500 feet
87
Driveway Lengths and widthsStandards & zoning criteriaXXLengths consistent with local zoning; widths to support emergency or maintenance vehicle access
88
Road FrontageStandards & zoning criteriaXXConsisten t with local zoning
89
Project Component HeightsStandards & zoning criteriaXXConsisten t with local zoning
90
Percentage of Lot Acreage Set asides for mitigation of sequestration and ecosystem servicesStandards & zoning criteriaXXSet aside acreage for life of project; not permanent
91
Project LightingStandards & zoning criteriaXXMinimal or no lighting preferrable
92
Project SignageStandards & zoning criteriaXX
93
Posting of Emergency Contact Information at Site EntranceStandards & zoning criteriaXXEssential!
94
Guidance to Minimize Visual ImpactsStandards & zoning criteriaXX
95
Guidelines re: Grading and Earth Removal; Top Soil Protection; Erosion preventionStandards & zoning criteriaXX
96
Construction Access Guidelines (roads, etc)Standards & zoning criteriaXXIn rural areas, restrict access via dirt roads or make provisions for road repair
97
Perimeter fencing, screening and plantingsStandards & zoning criteriaXXpreferrably dark fencing, native planting
98
Wetlands BufferStandards & zoning criteriaXXat least 100 feet
99
Control of vegetation and re-vegetationStandards & zoning criteriaXXOnly state can restrict pesticides and herbicides; manual maintenance preferrable
100
Pollinator friendly practicesStandards & zoning criteriaXXconsistent with Mass. initiatives