Row Labels Sum of System - Replacement Cost
4
DC Public Charter Schools $ 1,173,582,983
5
Achievement Preparatory Academy at Draper School $ 40,515,802
6
908 WAHLER PLACE SE $ 40,515,802
7
AST-1786 $ 40,515,802
8
A1010 Substructure-Foundations (Generic Parametric $ 741,511
9
A1030 Substructure-Foundations (Generic Parametric $ 803,502
10
A2010 Substructure-Basement Construction (Generic $ 45,301
11
Acoustical Tile Ceiling - New building $ 111,340
12
Acoustical Tile Ceiling -Existing Building $ 177,062
13
Aesthetic CBF panel wall- New building $ 216,149
14
All plumbing fixtures - New Building $ 296,444
15
All plumbing fixtures- Existing Building $ 399,882
16
Aluminum Exterior Doors - New building $ 10,786
17
Aluminum Exterior Doors- Existing Building $ 8,988
18
Asphalt Paved Parking Lot $ 52,290
19
B1010 Shell-Superstructure (Generic Parametric) $ 153,786
20
B1020 Shell-Superstructure (Generic Parametric) $ 1,502,096
21
B2010 Shell-Exterior Enclosure (Generic Parametric $ 883,376
22
B2020 Shell-Exterior Enclosure (Generic Parametric $ 882,184
23
B2030 Shell-Exterior Enclosure (Generic Parametric $ 95,371
24
B3010 Shell-Roofing (Generic Parametric) $ 935,830
25
B3020 Shell-Roofing (Generic Parametric) $ 33,380
26
Booster Pump System - New Building $ 12,080
27
Branch Wiring Devices - Existing Building $ 223,856
28
Branch Wiring Devices - New Building $ 301,966
29
Brick Veneer, Exterior - Existing Building $ 559,005
30
Brick Veneer, Exterior - New building $ 406,521
31
C1010 Interiors-Interior Construction (Generic Par $ 408,904
32
C1020 Interiors-Interior Construction (Generic Par $ 240,812
33
C1030 Interiors-Interior Construction (Generic Par $ 174,052
34
C3010 Interiors-Interior Finishes (Generic Paramet $ 268,232
35
C3020 Interiors-Interior Finishes (Generic Paramet $ 1,069,350
36
C3030 Interiors-Interior Finishes (Generic Paramet $ 1,037,162
37
Card Reader without Keypad - Existing Building $ 8,713
38
Card Reader without Keypad - New Building $ 15,247
39
Carpeting - Existing Building $ 7,343
40
Carpeting - New building $ 3,222
41
Ceramic Tile Flooring - Existing Building $ 47,642
42
Ceramic Tile Flooring - New building $ 31,692
43
Ceramic Wall Finish - New building $ 40,039
44
Ceramic Wall Finish -Existing Building $ 12,072
45
Commercial Grade Kitchen Sink - Existing Building $ 11,261
46
Concrete Block Wall - Existing Building $ 83,232
47
Concrete Flooring -Existing Building $ 2,750
48
Concrete Painted Wall- Existing Building $ 101,803
49
Concrete, Exterior Stairs $ 64,915
50
Concrete, Interior Stairs- New building $ 16,435
51
D2010 Services-Plumbing (Generic Parametric) $ 953,712
52
D2020 Services-Plumbing (Generic Parametric) $ 104,908
53
D2040 Services-Plumbing (Generic Parametric) $ 153,786
54
D3010 Services-HVAC (Generic Parametric) $ 1,524,747
55
D3050 Services-HVAC (Generic Parametric) $ 1,810,861
56
D4010 Services-Fire Protection (Generic Parametric $ 410,096
57
D4020 Services-Fire Protection (Generic Parametric $ 64,376
58
D5010 Services-Electrical (Generic Parametric) $ 154,978
59
D5020 Services-Electrical (Generic Parametric) $ 1,604,620
60
D5030 Services-Electrical (Generic Parametric) $ 549,577
61
D5090 Services-Electrical (Generic Parametric) $ 14,306
62
Domestic Hot Water Heater - Existing Building $ 7,500
63
Domestic Hot Water Storage Tank - Existing Building $ 7,352
64
Domestic Hot Water Storage Tank - New Building $ 4,942
65
Domestic Water Heater, Gas-fired - Existing Building $ 11,297
66
Domestic Water Heater, Gas-fired - New Building $ 11,297
67
Domestic Water Piping - Existing Building $ 364,276
68
Domestic Water Piping - New Building $ 270,049
69
Drinking Fountains - Existing Building $ 16,434
70
Drinking Fountains - New Building $ 12,183
71
Ductwork - New Building $ 271,064
72
E1020 Equipment and Furnishings-Equipment (Generic $ 29,804
73
Elevator- Existing Building $ 365,672
74
Elevator- New Building $ 365,672
75
Emergency Lights - Existing Building $ 57,868
76
Emergency Lights - New Building $ 78,059
77
Exhaust System - New Building $ 86,801
78
Exhaust System- Existing Building $ 117,089
79
Exit Lighting Fixture - Existing Building $ 36,548
80
Exit Lighting Fixture - New Building $ 49,301
81
Exterior Glazing - New building $ 610,910
82
Exterior Ramp $ 160,827
83
Fan Coil Unit, Ceiling Recessed - Existing Building $ 552,577
84
Fan Coil Unit, Ceiling recessed - New Building $ 409,641
85
Fan Coil Unit, Wall mounted - Existing Building $ 17,635
86
Fan Coil Unit, Wall mounted - New Building $ 17,635
87
Fence, 10' Chain Link $ 29,159
88
Fence, 6' Chain Link $ 4,572
89
Fence, Metal $ 33,174
90
Fire Alarm Systems - Existing Building $ 240,100
91
Fire Alarm Systems - New Building $ 323,877
92
Fire Doors - Existing Building $ 53,676
93
Fire Doors - New building $ 9,759
94
Fire extinguishers - New Building $ 28,934
95
Fire extinguishers- Existing Building $ 39,030
96
Fixed Window - New building $ 41,300
97
Fixed Window 24 SF-Existing Building $ 123,900
98
Flood Light, Exterior - Existing Building $ 16,772
99
Flood Light, Exterior - New Building $ 18,246
100
Floor Finish Wood- New building $ 169,697