ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
3
03-54, 5 Soon Lee Street, Pioneer Point Singapore - 627607
4
www.raaonegroup.com & raaone77@gmail.com Tel No. : 65389517
5
QUOTATION
6
7
To,
Mr. Thomas Lim
VinJoe Engineering & Construction Pte Ltd
18, wodland industrial park E6
SINGAPORE (757796)
Date 27/1/2025
8
Q Ref No RAA/20245/0012
9
ProjectBLK 8004 Changi East
10
11
Quotation For To supply labour and Tools for the below items
12
S.NoItem DescriptionUnitQtyUnit Price ($)
Total Price ($)
13
1FCU U-drop piping and insulation c/w PU and support (Support brackets, Paint, jacketing) - Installation & Connection of full set accessoriesNos13 SGD 2,120.00 SGD 27,560.00
14
2AHU Installation & Connection of full set accessories and joints insulation c/w PU and GI Sheet (include main pipe joints PU insulation, Support brackets, Paint, Jacketing)Nos3 SGD 4,400.00 SGD 13,200.00
15
3Installation of 25mm CHWP S/R (with PU Jacketing)Mtr51 SGD 29.00 SGD 1,479.00
16
4Installation of 32mm CHWP S/R (with PU Jacketing)Mtr64 SGD 35.00 SGD 2,240.00
17
5Installation of 50mm CHWP S/R (with PU Jacketing)Mtr34 SGD 44.00 SGD 1,496.00
18
6Installation of 65mm CHWP S/R (with PU Jacketing)Mtr18 SGD 70.00 SGD 1,260.00
19
7Installation of 100mm CHWP S/R (with PU Jacketing)Mtr195 SGD 100.00 SGD 19,500.00
20
8Installation of 150mm CHWP S/R (with PU Jacketing)Mtr20 SGD 120.00 SGD 2,400.00
21
9Installation of 25mm CDP uPVC Pipe (With armaflex Insulation)Mtr8 SGD 20.00 SGD 160.00
22
10Installation of 32mm CDP uPVC Pipe (With armaflex Insulation)Mtr18 SGD 25.00 SGD 450.00
23
11Installation of 40mm CDP uPVC Pipe (With armaflex Insulation)Mtr13 SGD 25.00 SGD 325.00
24
12Installation of 50mm CDP uPVC Pipe (With armaflex Insulation)Mtr71 SGD 30.00 SGD 2,130.00
25
13Installation of 150mm CDP uPVC Pipe (With armaflex Insulation)Mtr70 SGD 40.00 SGD 2,800.00
26
SGD 75,000.00
27
Terms and Conditions
28
1. Variations works not included in the above, shall be quoted/billed separately.
2. This Quotation validity is 30 days.
3. Above Quotation doesn't include GST.
4. Utilities comprising, but not limited to, water and electricity shall be provided free of charge throughout the entire work period.
5. Equipment & materials (includes pipe, fittings, armaflex) provided by maincon.
6. Any kind of Hoisting, Mobilization , Transportation is not under this qoutation.
7. Work at Hieght above 4m access and platform will provide by maincon.
8. Payment will be cleared after 15 days of invoice date.
9. This qoutation includes coupling, fittings above 50mm pipe.
29
30
Yours faithfully;
31
RAA-ONE CONSTRUCTION & ENGINEERING PTE LTD
32
(This is a computer generated quote, signature not required)
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100