A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Conduct a mobile audit with Safesite. | |||||||||||||||||||||||||
2 | iOS | Google Play | Desktop Browser | |||||||||||||||||||||||
3 | Language | English | ||||||||||||||||||||||||
4 | Author | Safesite | ||||||||||||||||||||||||
5 | Industry | General Industry | ||||||||||||||||||||||||
6 | Description | An OSHA-compliant LOTO (lockout/tagout or lock-tag-try) program is essential for ensuring employees involved in the control of hazardous energy are protected during maintenance, installation, grain work, and other tasks. | ||||||||||||||||||||||||
7 | Jurisdiction | USA Federal OSHA | ||||||||||||||||||||||||
8 | Publish Date | 11/13/2019 | ||||||||||||||||||||||||
9 | Name | Lockout/Tagout/Try (LOTO) | ||||||||||||||||||||||||
10 | Item Number | Question Text | Yes | No | N/A | Comments | ||||||||||||||||||||
11 | 1 | Is all machinery or equipment capable of movement, required to be de-energized or disengaged and locked out during cleaning, servicing, adjusting or setting up operations, whenever required? | ||||||||||||||||||||||||
12 | 2 | Does the organization have a written Control of Hazardous Energy (Lock-Tag-Try) Program? | ||||||||||||||||||||||||
13 | 3 | Are all workers who use locks and tags been trained on proper procedures, and has awareness training been provided to other workers? | ||||||||||||||||||||||||
14 | 4 | Do all workers who perform lockout-tagout have appropriate locks, tags and lockout devices? | ||||||||||||||||||||||||
15 | 5 | Do Lockout procedures include energy from suspended loads or potential energy (such as compressed springs, hydraulics, or jacks) to control hazards? | ||||||||||||||||||||||||
16 | 6 | Are specific lockout locks required to be used only for lockout, not for securing toolboxes or lockers? | ||||||||||||||||||||||||
17 | 7 | Have proper lockout locations been identified? (Ie. disconnect main or circuit power sources, not on/off switches, interlocks, emergency stops or selector switches.) | ||||||||||||||||||||||||
18 | 8 | Is there a means provided to identify employees who are working on locked-out equipment by their locks or accompanying tags? | ||||||||||||||||||||||||
19 | 9 | Are appropriate employees provided with individually keyed personal safety locks? | ||||||||||||||||||||||||
20 | 10 | Are correct lockout/tagout procedures available and in use for each piece of equipment with multiple sources of hazardous energy? | ||||||||||||||||||||||||
21 | 11 | Do employees authorized to do electrical lockouts confirm by voltage test (or equivalent means) that isolation and de-energizing have been accomplished before starting work on machines or equipment? | ||||||||||||||||||||||||
22 | 12 | Does the company have Group Lockout procedures available and in use? | ||||||||||||||||||||||||
23 | 13 | Are lockout trained employees provided with individually keyed personal safety locks? | ||||||||||||||||||||||||
24 | 14 | Is there a program to assess and update as necessary lockout procedures annually? | ||||||||||||||||||||||||
25 | 15 | Is there a program in place to assess lockout tagout trained workers' performance of lockout procedures annually? | ||||||||||||||||||||||||
26 | 16 | Is there a program in place to manage outside Contractors who must perform lockout tagout at the site? | ||||||||||||||||||||||||
27 | 17 | Are nearby workers affected by the lockout notified of the application and removal of lockout-tagout devices by either a contractor or an authorized employee? | ||||||||||||||||||||||||
28 | Text | Write Comments or Remarks here: | ||||||||||||||||||||||||
29 | ||||||||||||||||||||||||||
30 | ||||||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | ||||||||||||||||||||||||||
33 | ||||||||||||||||||||||||||
34 | ||||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |