3 | Tahun | Bulan | Area | BSA-GPU | |||||||||||||||||||||||||||||||
4 | OB Claim | Overcut | Out of Plan (by BA) | OB Pending Claim (Overcut) | Soil Claim | Mud Claim | Average Jarak Waste Removal | Akumulatif Waste Removal | Akumulatif OB Removal Terclaim | CG by TC (tgl 1-31) | CG by TC (tgl 1-31) | CG by Survey (1-31) | Keterangan | ||||||||||||||||||||||
5 | Volume (bcm) | Distance (m) | Volume (bcm) | Volume (bcm) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume to CCP (mt) | Distance to CCP (m) | Volume to ISP (mt) | Distance to ISP (m) | Volume to SBL (mt) | Distance to SBL (m) | Total CG by TC (mt) (per PIT) | Total CG by TC | Volume (bcm) (per PIT) | Total CG by Survey | |||||||||||||||
6 | 2021 | Desember | PIT BSA | 15.802,87 | 226,96 | 15.802,87 | 15.802,87 | Total volume outpit 9073.977 bcm (18-31 des) tidak disetujui Eng GPU | |||||||||||||||||||||||||||
7 | Total YtD | 15.802,87 | 226,96 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 15.802,87 | 15.802,87 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | |||||||||||||
8 | Tahun | Bulan | Area | BSA-GPU | |||||||||||||||||||||||||||||||
9 | OB Claim | Overcut | Out of Plan (by BA) | OB Pending Claim (Overcut) | Soil Claim | Mud Claim | Average Jarak Waste Removal | Akumulatif Waste Removal | Akumulatif OB Removal Terclaim | CG by TC (tgl 1-31) | CG by TC (tgl 1-31) | CG by Survey (1-31) | Keterangan | ||||||||||||||||||||||
10 | Volume (bcm) | Distance (m) | Volume (bcm) | Volume (bcm) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume to CCP (mt) | Distance to CCP (m) | Volume to ISP (mt) | Distance to ISP (m) | Volume to SBL (mt) | Distance to SBL (m) | Total CG by TC (mt) (per PIT) | Total CG by TC | Volume (bcm) (per PIT) | Total CG by Survey | |||||||||||||||
11 | 2022 | Januari | PIT BSA | 83.994,54 | 244,79 | 816,59 | 83.994,54 | 83.994,54 | 9.997,09 | 3.423,91 | 9.997,09 | 9.997,09 | 8.810,16 | 8.810,16 | |||||||||||||||||||||
12 | Februari | PIT BSA | 90.336,89 | 287,22 | 437,79 | 90.336,89 | 90.336,89 | 30.064,49 | 3.493,93 | 30.064,49 | 30.064,49 | 25.664,21 | 25.664,21 | ||||||||||||||||||||||
13 | Maret | PIT BSA | 122.901,72 | 403,50 | 2.683,82 | 122.901,72 | 122.901,72 | 1.026,58 | 3.536,82 | 1.026,58 | 1.026,58 | 710,23 | 710,23 | ||||||||||||||||||||||
14 | April | PIT BSA | 40.286,38 | 490,70 | 33.746,49 | 40.286,38 | 40.286,38 | 6.857,89 | 3.616,27 | 6.857,89 | 6.857,89 | 5.476,02 | 5.476,02 | ||||||||||||||||||||||
15 | Mei | PIT BSA | 89.651,57 | 445,02 | 36.430,31 | 89.651,57 | 89.651,57 | 24.108,07 | 3.498,50 | 24.108,07 | 24.108,07 | 19.566,81 | 19.566,81 | ||||||||||||||||||||||
16 | Juni | PIT BSA | 53.983,13 | 413,80 | 53.983,13 | 53.983,13 | 31.141,04 | 3.555,10 | 31.141,04 | 31.141,04 | 24.236,15 | 24.236,15 | |||||||||||||||||||||||
17 | Juli | PIT BSA | 61.147,92 | 437,75 | 61.147,92 | 61.147,92 | 26.603,91 | 3.587,28 | 26.603,91 | 26.603,91 | 22.414,40 | 22.414,40 | |||||||||||||||||||||||
18 | Agustus | PIT BSA | 100.008,07 | 559,09 | halo | 100.008,07 | 100.008,07 | 12.271,01 | 3.563,84 | 12.271,01 | 12.271,01 | 9.456,18 | 9.456,18 | ||||||||||||||||||||||
19 | September | PIT BSA | 64.103,13 | 443,54 | 64.103,13 | 64.103,13 | 33.558,26 | 3.348,01 | 33.558,26 | 33.558,26 | 26.880,28 | 26.880,28 | |||||||||||||||||||||||
20 | Oktober | PIT BSA | 85.704,84 | 556,81 | 85.704,84 | 85.704,84 | 29.655,95 | 3.469,89 | 29.655,95 | 29.655,95 | 24.857,91 | 24.857,91 | |||||||||||||||||||||||
21 | November | PIT BSA | 52.946,11 | 558,08 | 52.946,11 | 52.946,11 | 41.440,95 | 3.375,26 | 41.440,95 | 41.440,95 | 32.717,84 | 32.717,84 | |||||||||||||||||||||||
22 | Desember | PIT BSA | 55.132,39 | 387,55 | 55.132,39 | 55.132,39 | 35.971,87 | 2.616,17 | 35.971,87 | 35.971,87 | 28.640,02 | 28.640,02 | |||||||||||||||||||||||
23 | Total YtD | 900.196,69 | 435,65 | 0,00 | 74.115,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 0,00 | 900.196,69 | 900.196,69 | 282.697,11 | 3.423,75 | 0,00 | 0,00 | 0,00 | 0,00 | 282.697,11 | 282.697,11 | 229.430,21 | 229.430,21 | |||||||||||
24 | Tahun | Bulan | Area | BSA-GPU | |||||||||||||||||||||||||||||||
25 | OB Claim | Overcut | Out of Plan (by BA) | OB Pending Claim (Overcut) | Soil Claim | Mud Claim | Average Jarak Waste Removal | Akumulatif Waste Removal | Akumulatif OB Removal Terclaim | CG by TC (tgl 1-31) | CG by TC (tgl 1-31) | CG by Survey (1-31) | Keterangan | ||||||||||||||||||||||
26 | Volume (bcm) | Distance (m) | Volume (bcm) | Volume (bcm) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume to CCP (mt) | Distance to CCP (m) | Volume to ISP (mt) | Distance to ISP (m) | Volume to SBL (mt) | Distance to SBL (m) | Total CG by TC (mt) (per PIT) | Total CG by TC | Volume (bcm) (per PIT) | Total CG by Survey | |||||||||||||||
27 | 2023 | Januari | PIT BSA | 49.959,39 | 493,24 | 49.959,39 | 49.959,39 | 2.751,69 | 3.525,44 | 9.590,44 | 12.342,13 | 12.342,13 | 9.752,82 | 9.752,82 | |||||||||||||||||||||
28 | PIT Ex-ACI | 0,00 | |||||||||||||||||||||||||||||||||
29 | Februari | PIT BSA | 2.085,66 | 620,70 | 28.775,73 | 28.089,33 | 3.632,99 | 58.921,44 | 3.632,99 | 3.632,99 | 2.947,67 | 2.947,67 | |||||||||||||||||||||||
30 | PIT Ex-ACI | 26.003,67 | 1.332,53 | 686,40 | 1.379,90 | 1.342,22 | 0,00 | ||||||||||||||||||||||||||||
31 | Maret | PIT BSA | 1.895,04 | 400,82 | 103.010,15 | 103.010,15 | 1.701,93 | 3.329,44 | 6.736,12 | 59.326,00 | 8.438,05 | 8.438,05 | 6.632,23 | 6.632,23 | |||||||||||||||||||||
32 | PIT Ex-ACI | 101.115,11 | 1.152,94 | 0,00 | average jarak ob to be claimed 1000 | ||||||||||||||||||||||||||||||
33 | April | PIT BSA | 15.224,08 | 588,84 | 74.670,45 | 71.440,08 | 1.147,44 | 3.329,44 | 25.365,48 | 59.432,21 | 26.512,92 | 26.512,92 | 21.166,04 | 21.166,04 | |||||||||||||||||||||
34 | PIT Ex-ACI | 56.216,00 | 1.258,12 | 3.230,37 | 1.526,64 | 1.265,64 | 0,00 | average jarak ob to be claimed 1000 | |||||||||||||||||||||||||||
35 | Mei | PIT BSA | 12.823,47 | 659,83 | 77.145,81 | 77.145,81 | 1.147,44 | 3.329,44 | 30.225,05 | 59.064,10 | 226,22 | 31.598,71 | 31.598,71 | 23.185,49 | 23.185,49 | ||||||||||||||||||||
36 | PIT Ex-ACI | 64.322,34 | 1.043,68 | 0,00 | average jarak ob to be claimed 1000 | ||||||||||||||||||||||||||||||
37 | Juni | PIT BSA | 12.570,68 | 508,81 | 85.083,16 | 83.121,27 | 29.919,22 | 3.595,71 | 34.652,95 | 59.109,01 | 64.572,17 | 64.572,17 | 52.302,34 | 52.302,34 | |||||||||||||||||||||
38 | PIT Ex-ACI | 70.550,59 | 1.041,57 | 1.961,89 | 1.459,80 | 1.459,80 | 0,00 | average jarak ob to be claimed 1000 | |||||||||||||||||||||||||||
39 | Juli | PIT BSA | 48.011,07 | 448,62 | 124.866,67 | 124.866,67 | 16.057,38 | 3.493,40 | 32.955,44 | 58.304,11 | 28,22 | 126.300,00 | 49.041,04 | 49.041,04 | 38.981,95 | 38.981,95 | |||||||||||||||||||
40 | PIT Ex-ACI | 76.855,60 | 955,14 | 0,00 | |||||||||||||||||||||||||||||||
41 | Agustus | PIT BSA | 59.686,73 | 478,46 | 15.000,00 | 768,19 | 147,24 | 673,79 | 478,94 | 245.900,54 | 245.753,30 | 488,59 | 59.754,25 | 488,59 | 32.692,53 | 28.708,83 | 29.106,24 | Claim pending overdump dari awal bulan juli-agustus | |||||||||||||||||
42 | PIT Ex-ACI | 171.066,57 | 882,70 | 15.000,00 | 31.737,91 | 59.754,25 | 466,03 | 118.009,03 | 32.203,94 | 397,41 | |||||||||||||||||||||||||
43 | September | PIT BSA | 27.821,21 | 545,87 | 203.087,52 | 203.087,52 | 18.987,44 | 60.127,59 | 18.987,44 | 33.452,79 | 16.398,35 | 27.832,29 | |||||||||||||||||||||||
44 | PIT Ex-ACI | 175.266,31 | 870,43 | 2.000,00 | 181,22 | 3.220,62 | 14.284,13 | 60.127,59 | 14.465,35 | 11.433,94 | |||||||||||||||||||||||||
45 | Oktober | PIT BSA | 1.173,14 | 774,34 | 147.156,70 | 147.156,70 | 7.770,01 | 60.011,01 | 7.770,01 | 19.793,60 | 10.416,76 | 20.186,72 | |||||||||||||||||||||||
46 | PIT Ex-ACI | 143.983,56 | 820,94 | 2.000,00 | 2.000,00 | 2.000,00 | 845,62 | 4.110,40 | 3.790,67 | 7.913,19 | 60.337,72 | 12.023,59 | 9.769,96 | Volume Pending Claim September | |||||||||||||||||||||
47 | November | PIT BSA | 19.075,61 | 740,67 | 158.154,71 | 154.584,71 | 9.831,04 | 59.800,56 | 319,18 | 10.150,22 | 17.278,53 | 7.932,75 | 13.766,43 | ||||||||||||||||||||||
48 | PIT Ex-ACI | 135.509,10 | 840,11 | 1.500,00 | 2.070,00 | 1.349,84 | 847,78 | 7.128,31 | 60.449,69 | 7.128,31 | 5.833,68 | ||||||||||||||||||||||||
49 | Desember | PIT BSA | 8.037,13 | 778,59 | 100.944,95 | 100.944,95 | 12.832,78 | 60.232,61 | 30,61 | 118.009,03 | 12.863,39 | 14.278,33 | 10.307,61 | 11.453,56 | |||||||||||||||||||||
50 | PIT Ex-ACI | 91.407,82 | 771,62 | 500,00 | 1.500,00 | 1.500,00 | 872,03 | 1.414,94 | 60.302,10 | 1.414,94 | 1.145,95 | Volume Pending Claim November | |||||||||||||||||||||||
51 | Total YtD | 1.370.659,88 | 782,98 | 4.500,00 | 20.000,00 | 18.500,00 | 828,61 | 8.095,90 | 1.277,99 | 0,00 | 0,00 | 1.078,88 | 1.398.755,78 | 1.389.159,88 | 57.016,72 | 3.451,77 | 255.546,81 | 59.690,89 | 1.070,26 | 120.772,69 | 313.633,79 | 313.633,79 | 257.313,77 | 257.313,77 | |||||||||||
52 | Tahun | Bulan | Area | BSA-GPU | |||||||||||||||||||||||||||||||
53 | OB Claim | Overcut | Out of Plan (by BA) | OB Pending Claim (Overcut) | Soil Claim | Mud Claim | Average Jarak Waste Removal | Akumulatif Waste Removal | Akumulatif OB Removal Terclaim | CG by TC (tgl 1-31) | CG by TC (tgl 1-31) | CG by Survey (1-31) | Keterangan | ||||||||||||||||||||||
54 | Volume (bcm) | Distance (m) | Volume (bcm) | Volume (bcm) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume to CCP (mt) | Distance to CCP (m) | Volume to ISP (mt) | Distance to ISP (m) | Volume to SBL (mt) | Distance to SBL (m) | Total CG by TC (mt) (per PIT) | Total CG by TC | Volume (bcm) (per PIT) | Total CG by Survey | |||||||||||||||
55 | 2024 | Januari | PIT BSA | 66.416,62 | 892,20 | 2.000,00 | 2.000,00 | 590,69 | 80.235,51 | 82.235,51 | 1.871,66 | 1.643,75 | 18.940,63 | 60.048,13 | 20.812,29 | 20.812,29 | 16.698,69 | 16.698,69 | |||||||||||||||||
56 | PIT Ex-ACI | 13.818,89 | 912,25 | 0,00 | |||||||||||||||||||||||||||||||
57 | Februari | PIT BSA | 39.530,43 | 749,60 | 1.000,00 | 60.026,06 | 60.026,06 | 24.166,96 | 1.761,55 | 8.748,53 | 59.824,27 | 29,67 | 32.945,16 | 34.374,24 | 27.637,30 | 28.775,10 | |||||||||||||||||||
58 | PIT Ex-ACI | 20.495,63 | 731,90 | 1.429,08 | 59.802,95 | 1.429,08 | 1.137,80 | ||||||||||||||||||||||||||||
59 | Maret | PIT BSA | 47.680,89 | 818,79 | 69.876,35 | 69.876,35 | 25.917,73 | 1.664,88 | 22.699,73 | 59777,72 | 48.617,46 | 49.313,62 | 39.528,24 | 39.973,56 | |||||||||||||||||||||
60 | PIT Ex-ACI | 22.195,46 | 638,28 | 102,93 | 2.103,74 | 593,23 | 60.175,84 | 696,16 | 445,32 | ||||||||||||||||||||||||||
61 | April | PIT BSA | 27.850,08 | 848,71 | 4.000,00 | 5.000,00 | 860,90 | 30.631,28 | 35.631,28 | 21.618,94 | 1.747,99 | 13.070,13 | 59.824,72 | 34.689,07 | 34.699,23 | 27.850,08 | 30.631,28 | ||||||||||||||||||
62 | PIT Ex-ACI | 2.781,20 | 899,94 | 10,16 | 59.826,79 | 10,16 | 2.781,20 | ||||||||||||||||||||||||||||
63 | Mei | PIT BSA | 47.738,81 | 884,74 | 5.000,00 | 62.112,51 | 62.112,51 | 10.965,43 | 1.949,06 | 7.314,80 | 59.857,58 | 18.280,23 | 40.623,50 | 17.270,40 | 32.259,44 | ||||||||||||||||||||
64 | PIT Ex-ACI | 14.373,70 | 853,81 | 22.343,27 | 2.091,94 | 22.343,27 | 14.989,04 | ||||||||||||||||||||||||||||
65 | Juni | PIT BSA | 85.421,04 | 839,38 | 100.560,28 | 100.560,28 | 31.144,88 | 1.961,58 | 7.237,48 | 59.867,69 | 38.382,36 | 62.847,96 | 30.302,88 | 50.074,71 | |||||||||||||||||||||
66 | PIT Ex-ACI | 15.139,24 | 841,11 | 5.000,00 | 24.465,60 | 2.160,56 | 24.465,60 | 19.771,83 | |||||||||||||||||||||||||||
67 | Juli | PIT BSA | 67.411,92 | 842,92 | 440,00 | 5.000,00 | 841,11 | 95.661,93 | 100.661,93 | 33.439,94 | 1.868,15 | 33.439,94 | 63.640,04 | 26.233,85 | 50.561,82 | ||||||||||||||||||||
68 | PIT Ex-ACI | 28.250,01 | 765,37 | 30.200,10 | 2.108,06 | 30.200,10 | 24.327,97 | ||||||||||||||||||||||||||||
69 | Agustus | PIT BSA | 112.912,88 | 896,91 | 440,00 | 750,52 | 1.686,51 | 139.322,72 | 128.215,83 | 38.566,98 | 1.970,02 | 38.566,98 | 53.571,02 | 30.240,24 | 42.266,27 | ||||||||||||||||||||
70 | PIT Ex-ACI | 15.302,95 | 753,41 | 9.916,37 | 1.000,00 | 15.004,04 | 2.166,06 | 15.004,04 | 12.026,03 | ||||||||||||||||||||||||||
71 | September | PIT BSA | 98.443,86 | 838,80 | 127.719,39 | 127.719,39 | 44.373,38 | 1.947,09 | 44.373,38 | 56.200,06 | 34.538,37 | 43.367,49 | |||||||||||||||||||||||
72 | PIT Ex-ACI | 29.275,53 | 567,94 | 11.826,68 | 2.135,53 | 11.826,68 | 8.829,12 | ||||||||||||||||||||||||||||
73 | Oktober | PIT BSA | 29.741,81 | 631,03 | 1.129,63 | 54.788,53 | 53.658,90 | 27.291,42 | 1.968,59 | 27.291,42 | 30.779,52 | 27.094,49 | 30.625,86 | Periode 1-21 Oktober | |||||||||||||||||||||
74 | PIT Ex-ACI | 23.917,09 | 754,86 | 3.488,10 | 2.151,34 | 3.488,10 | 3.531,37 | Periode 1-21 Oktober | |||||||||||||||||||||||||||
75 | November | PIT BSA | 82.925,38 | 740,82 | 1.721,27 | 1.129,63 | 631,03 | 89.735,58 | 89.143,94 | 49.287,00 | 2.053,29 | 49.287,00 | 66.086,73 | 33.826,26 | 52.810,72 | Periode Eom berubah menjadi 22-21 | |||||||||||||||||||
76 | PIT Ex-ACI | 5.088,93 | 495,64 | 16.799,73 | 2.094,95 | 16.799,73 | 18.984,46 | Periode Eom berubah menjadi 22-21 | |||||||||||||||||||||||||||
77 | Desember | PIT BSA | 58.152,14 | 598,90 | 889,04 | 591,64 | 431,54 | 1.921,49 | 70.060,81 | 69.331,87 | 22.565,56 | 2.133,62 | 22.565,56 | 58.857,44 | 12.015,58 | 36.622,03 | |||||||||||||||||||
78 | PIT Ex-ACI | 10.588,09 | 574,61 | 36.291,88 | 2.171,97 | 36.291,88 | 24.606,45 | ||||||||||||||||||||||||||||
79 | Total YtD | 965.452,58 | 765,50 | 0,00 | 21.619,94 | 13.721,27 | 730,93 | 1.182,06 | 1.804,00 | 9.916,37 | 1.000,00 | 0,00 | 980.730,95 | 979.173,85 | 491.732,21 | 1.993,03 | 80.043,77 | 59.903,50 | 29,67 | 0,00 | 571.805,65 | 571.805,65 | 454.666,97 | 454.666,97 | |||||||||||
80 | Tahun | Bulan | Area | BSA-GPU | |||||||||||||||||||||||||||||||
81 | OB Claim | Overcut | Out of Plan (by BA) | OB Pending Claim (Overcut) | Soil Claim | Mud Claim | Average Jarak Waste Removal | Akumulatif Waste Removal | Akumulatif OB Removal Terclaim | CG by TC (tgl 1-31) | CG by TC (tgl 1-31) | CG by Survey (22-21) | Keterangan | ||||||||||||||||||||||
82 | Volume (bcm) | Distance (m) | Volume (bcm) | Volume (bcm) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume (bcm) | Distance (m) | Volume to CCP (mt) | Distance to CCP (m) | Volume to ISP (mt) | Distance to ISP (m) | Volume to SBL (mt) | Distance to SBL (m) | Total CG by TC (mt) (per PIT) | Total CG by TC | Volume (bcm) (per PIT) | Total CG by Survey | |||||||||||||||
83 | 2025 | Januari | PIT BSA | 59.085,92 | 651,71 | 97,94 | 395,34 | 297,40 | 598,90 | 79.473,95 | 79.581,83 | 17.826,20 | 2.117,28 | 17.826,20 | 49.806,34 | 14.115,63 | 42.554,18 | ||||||||||||||||||
84 | PIT Ex-ACI | 20.198,51 | 623,93 | 91,58 | 91,58 | 31.980,14 | 2.094,88 | 31.980,14 | 28.438,55 | ||||||||||||||||||||||||||
85 | Februari | PIT BSA | 78.404,01 | 642,65 | 726,87 | 824,81 | 97,94 | 653,58 | 95.592,80 | 94.603,76 | 1.050,76 | 2.451,73 | 1.050,76 | 62.403,92 | 4.550,31 | 60.415,24 | |||||||||||||||||||
86 | PIT Ex-ACI | 16.010,23 | 525,00 | 451,69 | 543,27 | 91,58 | 623,93 | 61.353,16 | 2.020,44 | 61.353,16 | 55.864,93 | ||||||||||||||||||||||||
87 | Maret | PIT BSA | 26.773,62 | 313,37 | 281,47 | 1.008,33 | 726,87 | 642,27 | 2.667,18 | 1.054,74 | 380,54 | 36.581,81 | 34.811,72 | 0,00 | 44.167,46 | 2.071,25 | 29.576,98 | ||||||||||||||||||
88 | PIT Ex-ACI | 6.859,54 | 434,83 | 451,69 | 451,69 | 525,00 | 44.167,46 | 2.218,75 | 44.167,46 | 27.505,73 | |||||||||||||||||||||||||
89 | April | PIT BSA | 31.939,91 | 413,69 | 281,47 | 281,47 | 313,37 | 2.066,96 | 1.141,13 | 457,91 | 60.459,63 | 58.603,97 | 21.231,90 | 2.326,63 | 21.231,90 | 61.595,80 | 20.000,02 | 42.753,85 | |||||||||||||||||
90 | PIT Ex-ACI | 26.382,59 | 458,36 | 70,17 | 70,17 | 40.363,90 | 2.206,30 | 40.363,90 | 22.753,83 | ||||||||||||||||||||||||||
91 | Mei | PIT BSA | 99.057,86 | 453,53 | 7.913,69 | 7.913,69 | 2.580,39 | 1.155,58 | 471,35 | 132.167,92 | 120.762,80 | 53.395,13 | 2.339,43 | 53.395,13 | 79.245,49 | 33.202,80 | 61.324,83 | ||||||||||||||||||
92 | PIT Ex-ACI | 21.634,77 | 391,81 | 981,21 | 1.051,38 | 70,17 | 458,36 | 25.850,36 | 2.207,89 | 25.850,36 | 28.122,03 | Claim Pending 22 Mei -21 April | |||||||||||||||||||||||
93 | Juni | PIT BSA | 200.407,69 | 514,87 | 4.438,00 | 7.913,69 | 7.913,69 | 454,47 | 209.993,86 | 214.450,76 | 67.221,16 | 2.204,98 | 67.221,16 | 85.801,12 | 32.147,35 | 74.359,08 | Claim Pending 22 Mei -21 April | ||||||||||||||||||
94 | PIT Ex-ACI | 5.148,17 | 412,15 | 981,21 | 981,21 | 390,87 | 18.579,96 | 2.218,89 | 18.579,96 | 42.211,73 | Claim Pending 22 Mei -21 April | ||||||||||||||||||||||||
95 | Juli | PIT BSA | 186.854,57 | 858,85 | 1.407,57 | 5.845,55 | 460,09 | 201.929,13 | 200.521,56 | 59.745,12 | 2.260,83 | 59.745,12 | 84.801,18 | 28.034,80 | 72.631,90 | ||||||||||||||||||||
96 | PIT Ex-ACI | 13.666,99 | 394,83 | 25.056,06 | 2.280,07 | 25.056,06 | 44.597,10 | ||||||||||||||||||||||||||||
97 | Agustus | PIT BSA | 161.111,03 | 671,46 | 245,39 | 1.652,96 | 1.407,55 | 858,85 | 172.339,76 | 172.094,35 | 55.629,70 | 2.299,34 | 55.629,70 | 62.631,88 | 35.061,75 | 46.128,19 | |||||||||||||||||||
98 | PIT Ex-ACI | 9.575,77 | 594,26 | 7.002,18 | 2.271,06 | 7.002,18 | 11.066,44 | ||||||||||||||||||||||||||||
99 | September | PIT BSA | 119.972,32 | 589,17 | 890,56 | 1.135,95 | 245,41 | 674,81 | 1.706,54 | 499,06 | 587,90 | 126.171,31 | 123.574,23 | 33.566,38 | 2.268,34 | 33.566,38 | 40.260,72 | 43.444,97 | 49.502,88 | ||||||||||||||||
100 | PIT Ex-ACI | 3.356,50 | 635,73 | 635,73 | 6.694,34 | 2.297,64 | 6.694,34 | 6.057,91 | |||||||||||||||||||||||||||