ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAFAGAH
1
2
3
TahunBulanAreaBSA-GPU
4
OB ClaimOvercutOut of Plan (by BA)OB Pending Claim (Overcut)Soil ClaimMud ClaimAverage Jarak Waste RemovalAkumulatif Waste RemovalAkumulatif OB Removal TerclaimCG by TC (tgl 1-31)CG by TC (tgl 1-31)CG by Survey (1-31)Keterangan
5
Volume (bcm)Distance (m)Volume (bcm)Volume (bcm)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume to CCP (mt)Distance to CCP (m)Volume to ISP (mt)Distance to ISP (m)Volume to SBL (mt)Distance to SBL (m)Total CG by TC (mt) (per PIT)Total CG by TCVolume (bcm) (per PIT)Total CG by Survey
6
2021DesemberPIT BSA15.802,87226,9615.802,8715.802,87Total volume outpit 9073.977 bcm (18-31 des) tidak disetujui Eng GPU
7
Total YtD15.802,87226,960,000,000,000,000,000,000,000,000,0015.802,8715.802,870,000,000,000,000,000,000,000,00
8
TahunBulanAreaBSA-GPU
9
OB ClaimOvercutOut of Plan (by BA)OB Pending Claim (Overcut)Soil ClaimMud ClaimAverage Jarak Waste RemovalAkumulatif Waste RemovalAkumulatif OB Removal TerclaimCG by TC (tgl 1-31)CG by TC (tgl 1-31)CG by Survey (1-31)Keterangan
10
Volume (bcm)Distance (m)Volume (bcm)Volume (bcm)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume to CCP (mt)Distance to CCP (m)Volume to ISP (mt)Distance to ISP (m)Volume to SBL (mt)Distance to SBL (m)Total CG by TC (mt) (per PIT)Total CG by TCVolume (bcm) (per PIT)Total CG by Survey
11
2022JanuariPIT BSA83.994,54244,79816,5983.994,5483.994,549.997,093.423,919.997,099.997,098.810,168.810,16
12
FebruariPIT BSA90.336,89287,22437,7990.336,8990.336,8930.064,493.493,9330.064,4930.064,4925.664,2125.664,21
13
MaretPIT BSA122.901,72403,502.683,82122.901,72122.901,721.026,583.536,821.026,581.026,58710,23710,23
14
AprilPIT BSA40.286,38490,7033.746,4940.286,3840.286,386.857,893.616,276.857,896.857,895.476,025.476,02
15
MeiPIT BSA89.651,57445,0236.430,3189.651,5789.651,5724.108,073.498,5024.108,0724.108,0719.566,8119.566,81
16
JuniPIT BSA53.983,13413,8053.983,1353.983,1331.141,043.555,1031.141,0431.141,0424.236,1524.236,15
17
JuliPIT BSA61.147,92437,7561.147,9261.147,9226.603,913.587,2826.603,9126.603,9122.414,4022.414,40
18
AgustusPIT BSA100.008,07559,09halo100.008,07100.008,0712.271,013.563,8412.271,0112.271,019.456,189.456,18
19
SeptemberPIT BSA64.103,13443,5464.103,1364.103,1333.558,263.348,0133.558,2633.558,2626.880,2826.880,28
20
OktoberPIT BSA85.704,84556,8185.704,8485.704,8429.655,953.469,8929.655,9529.655,9524.857,9124.857,91
21
NovemberPIT BSA52.946,11558,0852.946,1152.946,1141.440,953.375,2641.440,9541.440,9532.717,8432.717,84
22
DesemberPIT BSA55.132,39387,5555.132,3955.132,3935.971,872.616,1735.971,8735.971,8728.640,0228.640,02
23
Total YtD900.196,69435,650,0074.115,000,000,000,000,000,000,000,00900.196,69900.196,69282.697,113.423,750,000,000,000,00282.697,11282.697,11229.430,21229.430,21
24
TahunBulanAreaBSA-GPU
25
OB ClaimOvercutOut of Plan (by BA)OB Pending Claim (Overcut)Soil ClaimMud ClaimAverage Jarak Waste RemovalAkumulatif Waste RemovalAkumulatif OB Removal TerclaimCG by TC (tgl 1-31)CG by TC (tgl 1-31)CG by Survey (1-31)Keterangan
26
Volume (bcm)Distance (m)Volume (bcm)Volume (bcm)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume to CCP (mt)Distance to CCP (m)Volume to ISP (mt)Distance to ISP (m)Volume to SBL (mt)Distance to SBL (m)Total CG by TC (mt) (per PIT)Total CG by TCVolume (bcm) (per PIT)Total CG by Survey
27
2023JanuariPIT BSA49.959,39493,2449.959,3949.959,392.751,693.525,449.590,4412.342,1312.342,139.752,829.752,82
28
PIT Ex-ACI0,00
29
FebruariPIT BSA2.085,66620,7028.775,7328.089,333.632,9958.921,443.632,993.632,992.947,672.947,67
30
PIT Ex-ACI26.003,671.332,53686,401.379,901.342,220,00
31
MaretPIT BSA1.895,04400,82103.010,15103.010,151.701,933.329,446.736,1259.326,008.438,058.438,056.632,236.632,23
32
PIT Ex-ACI101.115,111.152,940,00average jarak ob to be claimed 1000
33
AprilPIT BSA15.224,08588,8474.670,4571.440,081.147,443.329,4425.365,4859.432,2126.512,9226.512,9221.166,0421.166,04
34
PIT Ex-ACI56.216,001.258,123.230,371.526,641.265,640,00average jarak ob to be claimed 1000
35
MeiPIT BSA12.823,47659,8377.145,8177.145,811.147,443.329,4430.225,0559.064,10226,2231.598,7131.598,7123.185,4923.185,49
36
PIT Ex-ACI64.322,341.043,680,00average jarak ob to be claimed 1000
37
JuniPIT BSA12.570,68508,8185.083,1683.121,2729.919,223.595,7134.652,9559.109,0164.572,1764.572,1752.302,3452.302,34
38
PIT Ex-ACI70.550,591.041,571.961,891.459,801.459,800,00average jarak ob to be claimed 1000
39
JuliPIT BSA48.011,07448,62124.866,67124.866,6716.057,383.493,4032.955,4458.304,1128,22126.300,0049.041,0449.041,0438.981,9538.981,95
40
PIT Ex-ACI76.855,60955,140,00
41
AgustusPIT BSA59.686,73478,4615.000,00768,19147,24673,79478,94245.900,54245.753,30488,5959.754,25488,5932.692,5328.708,8329.106,24Claim pending overdump dari awal bulan juli-agustus
42
PIT Ex-ACI171.066,57882,7015.000,0031.737,9159.754,25466,03118.009,0332.203,94397,41
43
SeptemberPIT BSA27.821,21545,87203.087,52203.087,5218.987,4460.127,5918.987,4433.452,7916.398,3527.832,29
44
PIT Ex-ACI175.266,31870,432.000,00181,223.220,6214.284,1360.127,5914.465,3511.433,94
45
OktoberPIT BSA1.173,14774,34147.156,70147.156,707.770,0160.011,017.770,0119.793,6010.416,7620.186,72
46
PIT Ex-ACI143.983,56820,942.000,002.000,002.000,00845,624.110,403.790,677.913,1960.337,7212.023,599.769,96Volume Pending Claim September
47
NovemberPIT BSA19.075,61740,67158.154,71154.584,719.831,0459.800,56319,1810.150,2217.278,537.932,7513.766,43
48
PIT Ex-ACI135.509,10840,111.500,002.070,001.349,84847,787.128,3160.449,697.128,315.833,68
49
DesemberPIT BSA8.037,13778,59100.944,95100.944,9512.832,7860.232,6130,61118.009,0312.863,3914.278,3310.307,6111.453,56
50
PIT Ex-ACI91.407,82771,62500,001.500,001.500,00872,031.414,9460.302,101.414,941.145,95Volume Pending Claim November
51
Total YtD1.370.659,88782,984.500,0020.000,0018.500,00828,618.095,901.277,990,000,001.078,881.398.755,781.389.159,8857.016,723.451,77255.546,8159.690,891.070,26120.772,69313.633,79313.633,79257.313,77257.313,77
52
TahunBulanAreaBSA-GPU
53
OB ClaimOvercutOut of Plan (by BA)OB Pending Claim (Overcut)Soil ClaimMud ClaimAverage Jarak Waste RemovalAkumulatif Waste RemovalAkumulatif OB Removal TerclaimCG by TC (tgl 1-31)CG by TC (tgl 1-31)CG by Survey (1-31)Keterangan
54
Volume (bcm)Distance (m)Volume (bcm)Volume (bcm)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume to CCP (mt)Distance to CCP (m)Volume to ISP (mt)Distance to ISP (m)Volume to SBL (mt)Distance to SBL (m)Total CG by TC (mt) (per PIT)Total CG by TCVolume (bcm) (per PIT)Total CG by Survey
55
2024JanuariPIT BSA66.416,62892,202.000,002.000,00590,6980.235,5182.235,511.871,661.643,7518.940,6360.048,1320.812,2920.812,2916.698,6916.698,69
56
PIT Ex-ACI13.818,89912,250,00
57
FebruariPIT BSA39.530,43749,601.000,0060.026,0660.026,0624.166,961.761,558.748,5359.824,2729,6732.945,1634.374,2427.637,3028.775,10
58
PIT Ex-ACI20.495,63731,901.429,0859.802,951.429,081.137,80
59
MaretPIT BSA47.680,89818,7969.876,3569.876,3525.917,731.664,8822.699,7359777,7248.617,4649.313,6239.528,2439.973,56
60
PIT Ex-ACI22.195,46638,28102,932.103,74593,2360.175,84696,16445,32
61
AprilPIT BSA27.850,08848,714.000,005.000,00860,9030.631,2835.631,2821.618,941.747,9913.070,1359.824,7234.689,0734.699,2327.850,0830.631,28
62
PIT Ex-ACI2.781,20899,9410,1659.826,7910,162.781,20
63
MeiPIT BSA47.738,81884,745.000,0062.112,5162.112,5110.965,431.949,067.314,8059.857,5818.280,2340.623,5017.270,4032.259,44
64
PIT Ex-ACI14.373,70853,8122.343,272.091,9422.343,2714.989,04
65
JuniPIT BSA85.421,04839,38100.560,28100.560,2831.144,881.961,587.237,4859.867,6938.382,3662.847,9630.302,8850.074,71
66
PIT Ex-ACI15.139,24841,115.000,0024.465,602.160,5624.465,6019.771,83
67
JuliPIT BSA67.411,92842,92440,005.000,00841,1195.661,93100.661,9333.439,941.868,1533.439,9463.640,0426.233,8550.561,82
68
PIT Ex-ACI28.250,01765,3730.200,102.108,0630.200,1024.327,97
69
AgustusPIT BSA112.912,88896,91440,00750,521.686,51139.322,72128.215,8338.566,981.970,0238.566,9853.571,0230.240,2442.266,27
70
PIT Ex-ACI15.302,95753,419.916,371.000,0015.004,042.166,0615.004,0412.026,03
71
SeptemberPIT BSA98.443,86838,80127.719,39127.719,3944.373,381.947,0944.373,3856.200,0634.538,3743.367,49
72
PIT Ex-ACI29.275,53567,9411.826,682.135,5311.826,688.829,12
73
OktoberPIT BSA29.741,81631,031.129,6354.788,5353.658,9027.291,421.968,5927.291,4230.779,5227.094,4930.625,86Periode 1-21 Oktober
74
PIT Ex-ACI23.917,09754,863.488,102.151,343.488,103.531,37Periode 1-21 Oktober
75
NovemberPIT BSA82.925,38740,821.721,271.129,63631,0389.735,5889.143,9449.287,002.053,2949.287,0066.086,7333.826,2652.810,72Periode Eom berubah menjadi 22-21
76
PIT Ex-ACI5.088,93495,6416.799,732.094,9516.799,7318.984,46Periode Eom berubah menjadi 22-21
77
DesemberPIT BSA58.152,14598,90889,04591,64431,541.921,4970.060,8169.331,8722.565,562.133,6222.565,5658.857,4412.015,5836.622,03
78
PIT Ex-ACI10.588,09574,6136.291,882.171,9736.291,8824.606,45
79
Total YtD965.452,58765,500,0021.619,9413.721,27730,931.182,061.804,009.916,371.000,000,00980.730,95979.173,85491.732,211.993,0380.043,7759.903,5029,670,00571.805,65571.805,65454.666,97454.666,97
80
TahunBulanAreaBSA-GPU
81
OB ClaimOvercutOut of Plan (by BA)OB Pending Claim (Overcut)Soil ClaimMud ClaimAverage Jarak Waste RemovalAkumulatif Waste RemovalAkumulatif OB Removal TerclaimCG by TC (tgl 1-31)CG by TC (tgl 1-31)CG by Survey (22-21)Keterangan
82
Volume (bcm)Distance (m)Volume (bcm)Volume (bcm)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume (bcm)Distance (m)Volume to CCP (mt)Distance to CCP (m)Volume to ISP (mt)Distance to ISP (m)Volume to SBL (mt)Distance to SBL (m)Total CG by TC (mt) (per PIT)Total CG by TCVolume (bcm) (per PIT)Total CG by Survey
83
2025JanuariPIT BSA59.085,92651,7197,94395,34297,40598,9079.473,9579.581,8317.826,202.117,2817.826,2049.806,3414.115,6342.554,18
84
PIT Ex-ACI20.198,51623,9391,5891,5831.980,142.094,8831.980,1428.438,55
85
FebruariPIT BSA78.404,01642,65726,87824,8197,94653,5895.592,8094.603,761.050,762.451,731.050,7662.403,924.550,3160.415,24
86
PIT Ex-ACI16.010,23525,00451,69543,2791,58623,9361.353,162.020,4461.353,1655.864,93
87
MaretPIT BSA26.773,62313,37281,471.008,33726,87642,272.667,181.054,74380,5436.581,8134.811,720,0044.167,462.071,2529.576,98
88
PIT Ex-ACI6.859,54434,83451,69451,69525,0044.167,462.218,7544.167,4627.505,73
89
AprilPIT BSA31.939,91413,69281,47281,47313,372.066,961.141,13457,9160.459,6358.603,9721.231,902.326,6321.231,9061.595,8020.000,0242.753,85
90
PIT Ex-ACI26.382,59458,3670,1770,1740.363,902.206,3040.363,9022.753,83
91
MeiPIT BSA99.057,86453,537.913,697.913,692.580,391.155,58471,35132.167,92120.762,8053.395,132.339,4353.395,1379.245,4933.202,8061.324,83
92
PIT Ex-ACI21.634,77391,81981,211.051,3870,17458,3625.850,362.207,8925.850,3628.122,03Claim Pending 22 Mei -21 April
93
JuniPIT BSA200.407,69514,874.438,007.913,697.913,69454,47209.993,86214.450,7667.221,162.204,9867.221,1685.801,1232.147,3574.359,08Claim Pending 22 Mei -21 April
94
PIT Ex-ACI5.148,17412,15981,21981,21390,8718.579,962.218,8918.579,9642.211,73Claim Pending 22 Mei -21 April
95
JuliPIT BSA186.854,57858,851.407,575.845,55460,09201.929,13200.521,5659.745,122.260,8359.745,1284.801,1828.034,8072.631,90
96
PIT Ex-ACI13.666,99394,8325.056,062.280,0725.056,0644.597,10
97
AgustusPIT BSA161.111,03671,46245,391.652,961.407,55858,85172.339,76172.094,3555.629,702.299,3455.629,7062.631,8835.061,7546.128,19
98
PIT Ex-ACI9.575,77594,267.002,182.271,067.002,1811.066,44
99
SeptemberPIT BSA119.972,32589,17890,561.135,95245,41674,811.706,54499,06587,90126.171,31123.574,2333.566,382.268,3433.566,3840.260,7243.444,9749.502,88
100
PIT Ex-ACI3.356,50635,73635,736.694,342.297,646.694,346.057,91