2 | CHECKLIST FOR SHUTTERING WORK | |||||||||||||||||||||||||
3 | Name of the Project: | Date of inspection: | ||||||||||||||||||||||||
4 | Name of the building: | Project manager: | ||||||||||||||||||||||||
5 | Location of inspection in the building: | Report no: | ||||||||||||||||||||||||
6 | ||||||||||||||||||||||||||
7 | CHECKLIST FOR SHUTTERING WORK | |||||||||||||||||||||||||
8 | SL. NO | CHECK ITEM | Reference | YES | NO | NA | Engineer | Comments | ||||||||||||||||||
9 | 1st Level Checked | 2nd Level Checked | ||||||||||||||||||||||||
10 | 1 | Material, type of shuttering: | ||||||||||||||||||||||||
11 | 1) | Shuttering materials are proper (steel) | ||||||||||||||||||||||||
12 | 2) | Forms are cleaned with steel scraper or steel brush to make it free of rust, mortar encrustations or other foreign material. | ||||||||||||||||||||||||
13 | 3) | No scrapped/ deformed shutter is used. | ||||||||||||||||||||||||
14 | 4) | Gaps/holes in the form are closed with paper, putty or with thin metal steels to prevent leakage of cement grout. | ||||||||||||||||||||||||
15 | 2 | Support, props: | ||||||||||||||||||||||||
16 | 1) | Quality of prop is proper. (steel piles) | ||||||||||||||||||||||||
17 | 2) | Interval of props are saficfactory. (maximum 2.5ft) | ||||||||||||||||||||||||
18 | 3) | Proper struts are used to separate the foundation formworks. | ||||||||||||||||||||||||
19 | 4) | Props at both ends are tighten. | ||||||||||||||||||||||||
20 | 5) | Measures are taken to prevent settlement of props at ground level | ||||||||||||||||||||||||
21 | 6) | Loose props/defective props are removed. | ||||||||||||||||||||||||
22 | 7) | Proper packing are ensured to check leakage. | ||||||||||||||||||||||||
23 | 3 | Shuttering planning: | ||||||||||||||||||||||||
24 | 1 | Turn bolt are fixed properly. | ||||||||||||||||||||||||
25 | 2 | Nuts and bolt are fixed properly. | ||||||||||||||||||||||||
26 | 3 | Electric conduits are set properly before casting. | ||||||||||||||||||||||||
27 | 4 | Provision of sanitaly ducts are provided properly | ||||||||||||||||||||||||
28 | 5 | Watertightness is ensured in the formwork. | ||||||||||||||||||||||||
29 | 6 | Clear cover is set properly (saline & none-saline zone considered) | ||||||||||||||||||||||||
30 | 7 | All unused poltythine sheets are removed. | ||||||||||||||||||||||||
31 | 8 | Level of shuttering is proper. | ||||||||||||||||||||||||
32 | 9 | Horizontal alighment of shuttering is proper. | ||||||||||||||||||||||||
33 | 10 | Vertical alighment of shuttering is proper. | ||||||||||||||||||||||||
34 | 4 | Special check for pile casting: | ||||||||||||||||||||||||
35 | 1 | Pile casting platform is perfectly is plane. | ||||||||||||||||||||||||
36 | 2 | Pile form works are placed straight and size of each pile is ensured. | ||||||||||||||||||||||||
37 | 3 | Vertical alighment of pile shuttering is proper. | ||||||||||||||||||||||||
38 | 4 | Measures are taken for Water tighthness to ensure quality of concrete | ||||||||||||||||||||||||
39 | 5 | Aggregate measuring box, sand filter are present at the site. | ||||||||||||||||||||||||
40 | 6 | Slump testing aparatus is present at site | ||||||||||||||||||||||||
41 | 5 | Special check for Footings/ Pile Caps: | ||||||||||||||||||||||||
42 | 1 | Proper struts are used to separate foundation frameworks. | ||||||||||||||||||||||||
43 | 2 | Cork sheets are used to separate very adjacent footing foundation. | ||||||||||||||||||||||||
44 | 6 | Special check for columns: | ||||||||||||||||||||||||
45 | 1 | Use of wooden shutter for column is strictly prohibited, therefore no wooden shutter is used. | ||||||||||||||||||||||||
46 | 2 | Forms made of 16 SWG steel sheet and angles with holes for fixing and tightening are prepared. | ||||||||||||||||||||||||
47 | 3 | Height of form is within 5’-6”. | ||||||||||||||||||||||||
48 | 4 | Column form are tighten with nuts and bolts at every hole with T-Bolts by putting jute/ foam gaskit in the overlapped surface of the the two shutters. | ||||||||||||||||||||||||
49 | 5 | In addition to turn Bolt and T-Bolt fixing in the column shutter, props as struts in inclined are used. | ||||||||||||||||||||||||
50 | 6 | Uniform lateral supports are ensured. | ||||||||||||||||||||||||
51 | 7 | Column shutter is found 100% vertical. | ||||||||||||||||||||||||
52 | 8 | When location of shuttering height exceeds 12 feet, special type of scaffolding with cross bracing is used. | ||||||||||||||||||||||||
53 | 9 | Scaffolding is set for safety where it is necessary. | ||||||||||||||||||||||||
54 | 7 | Special check for slab and beams: | ||||||||||||||||||||||||
55 | 1 | Steel shutter for beams are prepared made of 16 SWG steel sheets with necessary holes and clamps and strong MS Angle Frame. | ||||||||||||||||||||||||
56 | 2 | Free end of platform sheet of slab is is fixed with beam shutter. | ||||||||||||||||||||||||
57 | 3 | Special strut bolts are used in the middle of deep beam to prevent fattening. | ||||||||||||||||||||||||
58 | 4 | Special Measures are taken to retail the alignment of edge beams and slabs. | ||||||||||||||||||||||||
59 | 5 | Steel props are placed @ 2’-6’’ C/C are used for slab. | ||||||||||||||||||||||||
60 | 6 | Support for each prop is OK to check against deflection (in case of ground floor slab). | ||||||||||||||||||||||||
61 | 7 | Form of slab is found leveled properly. | ||||||||||||||||||||||||
62 | 8 | In case of double height of slab of beam, scaffolding is done as per approved design from concerned Design Division. | ||||||||||||||||||||||||
63 | 9 | Camber is done (if any) | ||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | COMPANY ENGINEER | CLIENT ENIGNEERR | ||||||||||||||||||||||||
66 | Name: | Name: | ||||||||||||||||||||||||
67 | Sign | Sign | ||||||||||||||||||||||||
68 | Date: | Date: | ||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||