CHECKLIST FOR SHUTTERING WORK
3
Name of the Project:Date of inspection:
4
Name of the building:Project manager:
5
Location of inspection in the building:Report no:
6
7
CHECKLIST FOR SHUTTERING WORK
8
SL.
NO
CHECK ITEMReferenceYESNONAEngineerComments
9
1st Level
Checked
2nd Level
Checked
10
1Material, type of shuttering:
11
1)Shuttering materials are proper (steel)
12
2)Forms are cleaned with steel scraper or steel brush to make it free of rust, mortar encrustations or other foreign material.
13
3)No scrapped/ deformed shutter is used.
14
4)Gaps/holes in the form are closed with paper, putty or with thin metal steels to prevent leakage of cement grout.
15
2Support, props:
16
1)Quality of prop is proper. (steel piles)
17
2)Interval of props are saficfactory. (maximum 2.5ft)
18
3)Proper struts are used to separate the foundation formworks.
19
4)Props at both ends are tighten.
20
5)Measures are taken to prevent settlement of props at ground level
21
6)Loose props/defective props are removed.
22
7)Proper packing are ensured to check leakage.
23
3Shuttering planning:
24
1Turn bolt are fixed properly.
25
2Nuts and bolt are fixed properly.
26
3Electric conduits are set properly before casting.
27
4Provision of sanitaly ducts are provided properly
28
5Watertightness is ensured in the formwork.
29
6Clear cover is set properly (saline & none-saline
zone considered)
30
7All unused poltythine sheets are removed.
31
8Level of shuttering is proper.
32
9Horizontal alighment of shuttering is proper.
33
10Vertical alighment of shuttering is proper.
34
4Special check for pile casting:
35
1Pile casting platform is perfectly is plane.
36
2Pile form works are placed straight and size of each
pile is ensured.
37
3Vertical alighment of pile shuttering is proper.
38
4Measures are taken for Water tighthness to ensure
quality of concrete
39
5Aggregate measuring box, sand filter are present at the site.
40
6Slump testing aparatus is present at site
41
5Special check for Footings/ Pile Caps:
42
1Proper struts are used to separate foundation
frameworks.
43
2Cork sheets are used to separate very adjacent
footing foundation.
44
6Special check for columns:
45
1Use of wooden shutter for column is strictly
prohibited, therefore no wooden shutter is used.
46
2Forms made of 16 SWG steel sheet and angles with holes for fixing and tightening are prepared.
47
3Height of form is within 5’-6”.
48
4Column form are tighten with nuts and bolts at every hole with T-Bolts by putting jute/ foam gaskit in the overlapped surface of the the two shutters.
49
5In addition to turn Bolt and T-Bolt fixing in the column shutter, props as struts in inclined are used.
50
6Uniform lateral supports are ensured.
51
7Column shutter is found 100% vertical.
52
8When location of shuttering height exceeds 12 feet, special type of scaffolding with cross bracing is used.
53
9Scaffolding is set for safety where it is necessary.
54
7Special check for slab and beams:
55
1Steel shutter for beams are prepared made of 16 SWG steel sheets with necessary holes and
clamps and strong MS Angle Frame.
56
2Free end of platform sheet of slab is is fixed with
beam shutter.
57
3Special strut bolts are used in the middle of deep
beam to prevent fattening.
58
4Special Measures are taken to retail the alignment
of edge beams and slabs.
59
5Steel props are placed @ 2’-6’’ C/C are used for
slab.
60
6Support for each prop is OK to check against
deflection (in case of ground floor slab).
61
7Form of slab is found leveled properly.
62
8In case of double height of slab of beam, scaffolding is done as per approved design from
concerned Design Division.
63
9Camber is done (if any)
64
65
COMPANY ENGINEERCLIENT ENIGNEERR
66
Name:Name:
67
SignSign
68
Date:Date:
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100