1 | NO | List_Material_KHS | SAT | HARGA SATUAN ( Rp ) | NO | List_Jasa_Pasang | SAT | HARGA SATUAN ( Rp ) | NO | List_Jasa_Bongkar | SAT | HARGA SATUAN ( Rp ) | NO | List_JPROC_Pusat | SAT | HARGA SATUAN ( Rp ) | NO | List_JPROC_Regional | SAT | HARGA SATUAN ( Rp ) | NO | List_Transportasi | SAT | HARGA SATUAN ( Rp ) | |||||
2 | 1 | Single Top Ties ; AAAC ; 70 mm² | Buah | 44.912 | 93575 | 1 | Pasang Tiang Besi 7 m 100 daN | Btg | 190.707 | 1 | Bongkar Tiang Besi 7 m 100 daN | Btg | 114.424 | 1 | AAAC 70 mm2 | meter | 13.300 | 1 | Fault Indicator (FIOHL) 3bh + Panel RTU (include Instalasi) | set | 35.800.000 | 1 | Dari Kuala Kapuas ke Seputar Kuala Kapuas dan Selat (Kec) | T/m3 | 528.897 | ||||
3 | 2 | Single Top Ties ; AAAC ; 150 mm² | Buah | 51.178 | 131005 | 2 | Pasang Tiang Besi 9 m 100 daN | Btg | 212.497 | 2 | Bongkar Tiang Besi 9 m 100 daN | Btg | 127.498 | 2 | AAAC 150 mm2 | meter | 23.500 | 2 | Box APP 2 Pintu 53kVA (+ Transport ke UP3 Banjarmasin) | Unit | 10.596.000 | 2 | Dari Kuala Kapuas ke Basarang (Kec) | T/m3 | 528.897 | ||||
4 | 3 | Single Top Ties ; AAAC ; 240 mm² | Buah | 59.012 | 139870 | 3 | Pasang Tiang Besi 9 m 200 daN | Btg | 251.777 | 3 | Bongkar Tiang Besi 9 m 200 daN | Btg | 151.066 | 3 | AAAC 240 mm2 | meter | 34.400 | 3 | Box APP 2 Pintu 66kVA (+ Transport ke UP3 Banjarmasin) | Unit | 10.596.000 | 3 | Dari Kuala Kapuas ke Dadahup (Kec) Dadahup | T/m3 | 794.454 | ||||
5 | 4 | Single Side Ties ; AAAC ; 70 mm² | Buah | 44.912 | 187150 | 4 | Pasang Tiang Besi 9 m 350 daN | Btg | 275.549 | 4 | Bongkar Tiang Besi 9 m 350 daN | Btg | 165.329 | 4 | AAAC-S 70 mm2 | meter | 27.000 | 4 | Box APP 2 Pintu 82,5kVA (+ Transport ke UP3 Banjarmasin) | Unit | 11.096.000 | 4 | Dari Kuala Kapuas ke Kuala Kapuas Barat (Kec) | T/m3 | 593.274 | ||||
6 | 5 | Single Side Ties ; AAAC ; 150 mm² | Buah | 51.178 | 280725 | 5 | Pasang Tiang Besi 11 m 156 daN | Btg | 337.678 | 5 | Bongkar Tiang Besi 11 m 156 daN | Btg | 202.607 | 5 | AAAC-S 150 mm2 | meter | 26.140 | 5 | Box APP 2 Pintu 105kVA (+ Transport ke UP3 Banjarmasin) | Unit | 11.096.000 | 5 | Dari Kuala Kapuas ke Kuala Kapuas Hilir (Kec) | T/m3 | 528.897 | ||||
7 | 6 | Single Side Ties ; AAAC ; 240 mm² | Buah | 59.012 | 374300 | 6 | Pasang Tiang Besi 11 m 200 daN | Btg | 462.360 | 6 | Bongkar Tiang Besi 11 m 200 daN | Btg | 277.416 | 6 | AAAC-S 240 mm2 | meter | 41.400 | 6 | Box APP 2 Pintu 131kVA (+ Transport ke UP3 Banjarmasin) | Unit | 11.321.000 | 6 | Dari Kuala Kapuas ke Kuala Kapuas Hulu (Kec) Sei Hanyo | T/m3 | 3.160.326 | ||||
8 | 7 | Double Top Ties ; AAAC ; 70 mm² | Buah | 87.733 | 18715 | 7 | Pasang Tiang Besi 12 m 200 daN | Btg | 491.415 | 7 | Bongkar Tiang Besi 12 m 200 daN | Btg | 294.849 | 7 | CT TM Indoor Blocked - rasio 10/5-5 s/d 1000/5-5 | unit | 4.000.000 | 7 | Box APP 2 Pintu 147kVA (+ Transport ke UP3 Banjarmasin) | Unit | 11.321.000 | 7 | Dari Kuala Kapuas ke Kuala Kapuas Kuala (Kec) Lupak | T/m3 | 882.973 | ||||
9 | 8 | Double Top Ties ; AAAC ; 150 mm² | Buah | 100.268 | 27580 | 8 | Pasang Tiang Besi 12 m 350 daN | Btg | 520.155 | 8 | Bongkar Tiang Besi 12 m 350 daN | Btg | 312.093 | 8 | CT TM Indoor Ring - rasio 10/5-5 sd 100/5-5 | unit | 4.400.000 | 8 | Box APP 2 Pintu 164kVA (+ Transport ke UP3 Banjarmasin) | Unit | 11.321.000 | 8 | Dari Kuala Kapuas ke Kuala Kapuas Murung (Kec) | T/m3 | 609.369 | ||||
10 | 9 | Double Top Ties ; AAAC ; 240 mm² | Buah | 114.891 | 37430 | 9 | Pasang Tiang Besi 13 m 200 daN | Btg | 520.155 | 9 | Bongkar Tiang Besi 13 m 200 daN | Btg | 312.093 | 9 | CT TM Outdoor Blocked - rasio 10/5 sd 1000/5 | unit | 7.400.000 | 9 | Box APP 2 Pintu 197kVA (+ Transport ke UP3 Banjarmasin) | Unit | 12.221.000 | 9 | Dari Kuala Kapuas ke Kuala Kapuas Tengah (Kec) Pujon | T/m3 | 2.436.079 | ||||
11 | 10 | Double Side Ties ; AAAC ; 70 mm² | Buah | 87.733 | 56145 | 10 | Pasang Tiang Besi 13 m 350 daN | Btg | 706.529 | 10 | Bongkar Tiang Besi 13 m 350 daN | Btg | 423.917 | 10 | Fully Gas Insulated Switchgear; LBS Manual; 24kV; 630A; 16kA | Cell | 10 | Box APP 2 Pintu 53kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.172.800 | 10 | Dari Kuala Kapuas ke Kuala Kapuas Timur (Kec) | T/m3 | 577.180 | |||||
12 | 11 | Double Side Ties ; AAAC ; 150 mm² | Buah | 100.268 | 74860 | 11 | Pasang Tiang Besi 13 m 500 daN | Btg | 781.239 | 11 | Bongkar Tiang Besi 13 m 500 daN | Btg | 468.744 | 11 | Fully Gas Insulated Switchgear; TP; 24kV; 630A; 16kA | Cell | 11 | Box APP 2 Pintu 66kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.172.800 | 11 | Dari Kuala Kapuas ke Mantangai (Kec) Via Dadahup | T/m3 | 1.076.106 | |||||
13 | 12 | Double Side Ties ; AAAC ; 240 mm² | Buah | 114.891 | 37430 | 12 | Pasang Tiang Besi 14 m 350 daN | Btg | 824.283 | 12 | Bongkar Tiang Besi 14 m 350 daN | Btg | 494.570 | 12 | Fully Gas Insulated Switchgear; LBS Motorized; 24kV; 630A; 16kA | Cell | 12 | Box APP 2 Pintu 82,5kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.672.800 | 12 | Dari Kuala Kapuas ke Pulau Petak (Kec) | T/m3 | 536.944 | |||||
14 | 13 | Single Top Ties ; Semiconductive ; AAAC-S ; 70 mm² | Buah | 83.561 | 56145 | 13 | Pasang Tiang Besi 17 m 350 daN | Btg | 1.317.687 | 13 | Bongkar Tiang Besi 17 m 350 daN | Btg | 790.612 | 13 | Fully Gas Insulated Switchgear; CBOG Motorized + Metering; 24kV; 630A; 16kA | Cell | 13 | Box APP 2 Pintu 105kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.672.800 | 13 | Dari Kuala Kapuas ke Tamban Catur (Kec) Catur | T/m3 | 786.407 | |||||
15 | 14 | Single Top Ties ; Semiconductive ; AAAC-S ; 150 mm² | Buah | 93.017 | 74860 | 14 | Pasang Tiang Besi 21 m 500 daN | Btg | 1.844.761 | 14 | Bongkar Tiang Besi 21 m 500 daN | Btg | 1.106.856 | 14 | Fully Gas Insulated Switchgear; CBOG Motorized; 24kV; 630A; 16kA | Cell | 14 | Box APP 2 Pintu 131kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.897.800 | 14 | Dari Kuala Kapuas ke Timpah | T/m3 | 2.138.334 | |||||
16 | 15 | Single Top Ties ; Semiconductive ; AAAC-S ; 240 mm² | Buah | 103.031 | 112290 | 15 | Pasang Tiang Besi 27 m 350 daN | Btg | 2.619.711 | 15 | Bongkar Tiang Besi 27 m 350 daN | Btg | 1.571.827 | 15 | Fully Gas Insulated Switchgear; Metering; 24kV; 630A; 16kA | Cell | 15 | Box APP 2 Pintu 147kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.897.800 | 15 | Dari Kuala Kapuas ke Pasak Talawang | T/m3 | 3.063.760 | |||||
17 | 16 | Single Side Ties ; Semiconductive ; AAAC-S ; 70 mm² | Buah | 81.263 | 149720 | 16 | Pasang Tiang Besi 27 m 500 daN | Btg | 3.929.567 | 16 | Bongkar Tiang Besi 27 m 500 daN | Btg | 2.357.740 | 16 | Air Insulated Switchgear; CBOG Motorized + Metering; 24kV; 630A; 16kA | Cell | 16 | Box APP 2 Pintu 164kVA (+ Transport ke UP3 Palangkaraya) | Unit | 11.897.800 | 16 | Dari Kuala Kapuas ke Mandau Talawang | T/m3 | 3.289.081 | |||||
18 | 17 | Single Side Ties ; Semiconductive ; AAAC-S ; 150 mm² | Buah | 89.734 | 180058 | 17 | Pasang Tiang Beton 7 m 100 daN | Btg | 343.300 | 17 | Bongkar Tiang Beton 7 m 100 daN | Btg | 205.980 | 17 | Air Insulated Switchgear; LBS Motorized; 24kV; 630A; 16kA | Cell | 17 | Box APP 2 Pintu 197kVA (+ Transport ke UP3 Palangkaraya) | Unit | 12.797.800 | 17 | Dari Kuala Kapuas ke Pulang Pisau | T/m3 | 762.265 | |||||
19 | 18 | Single Side Ties ; Semiconductive ; AAAC-S ; 240 mm² | Buah | 96.464 | 270087 | 18 | Pasang Tiang Beton 9 m 200 daN | Btg | 687.593 | 18 | Bongkar Tiang Beton 9 m 200 daN | Btg | 412.555 | 18 | Air Insulated Switchgear; LBS Manual; 24kV; 630A; 16kA | Cell | 18 | Box APP 2 Pintu 53kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.037.500 | 18 | Dari Kuala Kapuas ke Banama Tingang (Kec) | T/m3 | 2.162.476 | |||||
20 | 19 | Double Top Ties ; Semiconductive ; AAAC-S ; 70 mm² | Buah | 164.594 | 360116 | 19 | Pasang Tiang Beton 11 m 200 daN | Btg | 859.492 | 19 | Bongkar Tiang Beton 11 m 200 daN | Btg | 515.696 | 19 | Air Insulated Switchgear; TP; 24kV; 630A; 16kA | Cell | 19 | Box APP 2 Pintu 66kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.037.500 | 19 | Dari Kuala Kapuas ke Jabiren Raya (Kec) | T/m3 | 1.092.200 | |||||
21 | 20 | Double Top Ties ; Semiconductive ; AAAC-S ; 150 mm² | Buah | 179.533 | 540174 | 20 | Pasang Tiang Beton 12 m 200 daN | Btg | 859.492 | 20 | Bongkar Tiang Beton 12 m 200 daN | Btg | 515.696 | 20 | Metalclad; Outgoing; 20kV; 630A; 25kA | Cell | 170.000.000 | 20 | Box APP 2 Pintu 82,5kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.537.500 | 20 | Dari Kuala Kapuas ke Kahayan Hilir (Kec) | T/m3 | 762.265 | ||||
22 | 21 | Double Top Ties ; Semiconductive ; AAAC-S ; 240 mm² | Buah | 191.911 | 720232 | 21 | Pasang Tiang Beton 12 m 350 daN | Btg | 982.276 | 21 | Bongkar Tiang Beton 12 m 350 daN | Btg | 589.366 | 21 | Metalclad; Couple; 20kV; 2000A; 25kA | Cell | 250.000.000 | 21 | Box APP 2 Pintu 105kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.537.500 | 21 | Dari Kuala Kapuas ke Kahayan Kuala (Kec) | T/m3 | 1.542.842 | ||||
23 | 22 | Double Side Ties ; Semiconductive ; AAAC-S ; 70 mm² | Buah | 164.594 | 37824 | 22 | Pasang Tiang Beton 13 m 350 daN | Btg | 982.276 | 22 | Bongkar Tiang Beton 13 m 350 daN | Btg | 589.366 | 22 | FCO 24 kV;6-100 A;10kA;125 kV; Polimer SIR | buah | 22 | Box APP 2 Pintu 131kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.762.500 | 22 | Dari Kuala Kapuas ke Kahayan Tengah (Kec) | T/m3 | 1.679.645 | |||||
24 | 23 | Double Side Ties ; Semiconductive ; AAAC-S ; 150 mm² | Buah | 179.533 | 39006 | 23 | Pasang Tiang Beton 14 m 350 daN | Btg | 982.276 | 23 | Bongkar Tiang Beton 14 m 350 daN | Btg | 589.366 | 23 | Line Post; 24kV; 12,5kN; Polimer SIR | buah | 23 | Box APP 2 Pintu 147kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.762.500 | 23 | Dari Kuala Kapuas ke Maliku (Kec) | T/m3 | 1.124.388 | |||||
25 | 24 | Double Side Ties ; Semiconductive ; AAAC-S ; 240 mm² | Buah | 191.911 | 40188 | 24 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 9 M | Btg | 151.500 | 24 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 9 M | Btg | - | 24 | Dead End; 24kV; 70kN; Polimer SIR | buah | 24 | Box APP 2 Pintu 164kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 11.762.500 | 24 | Dari Kuala Kapuas ke Pandih Batu (Kec) | T/m3 | 1.341.663 | |||||
26 | 25 | Single Top Ties ; Non Conductive ; AAAC-S ; 70 mm² | Buah | 79.194 | 41370 | 25 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 11 M | Btg | 242.401 | 25 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 11 M | Btg | - | 25 | String Rod / Strain Kap & Pin; Porcelain | buah | 25 | Box APP 2 Pintu 197kVA (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 12.662.500 | 25 | Dari Kuala Kapuas ke Tamiyang Layang | T/m3 | 3.771.913 | |||||
27 | 26 | Single Top Ties ; Non Conductive ; AAAC-S ; 150 mm² | Buah | 88.453 | 42552 | 26 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 12 M | Btg | 275.455 | 26 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 12 M | Btg | - | 26 | Pin Post / Line Post; Porcelain | buah | 26 | Box APP 1 Pintu (+ Transport ke UP3 Banjarmasin) | Unit | 2.910.000 | 26 | Dari Kuala Kapuas ke Awang (Kec) | T/m3 | 2.822.345 | |||||
28 | 27 | Single Top Ties ; Non Conductive ; AAAC-S ; 240 mm² | Buah | 96.629 | 43734 | 27 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 13 M | Btg | 288.572 | 27 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 13 M | Btg | - | 27 | kWh Meter 3 Phase Pengukuran tidak langsung kelas 0,5 | buah | 27 | Box APP 1 Pintu (+ Transport ke UP3 Palangkaraya) | Unit | 2.973.500 | 27 | Dari Kuala Kapuas ke Banua Lima (Kec) | T/m3 | 3.880.549 | |||||
29 | 28 | Single Side Ties ; Non Conductive ; AAAC-S ; 70 mm² | Buah | 76.732 | 44916 | 28 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 14 M | Btg | 318.948 | 28 | Perbaikan Tiang Miring ( T. Beton & T. Besi ) 14 M | Btg | - | 28 | kWh Meter 3 Phase Pengukuran tidak langsung kelas 1 | buah | 28 | Box APP 1 Pintu (+ Transport ke UP3 Barabai / Kuala Kapuas / Kotabaru) | Unit | 3.165.000 | 28 | Dari Kuala Kapuas ke Dusun Tengah (Kec) Ampah | T/m3 | 3.421.859 | |||||
30 | 29 | Single Side Ties ; Non Conductive ; AAAC-S ; 150 mm² | Buah | 85.991 | 46098 | 29 | Pengecatan Tiang Besi 9 M | Btg | 32.644 | 29 | Pemotongan untuk Pembongkaran Tiang Besi | Btg | - | 29 | kWh Meter 3 Phase Pengukuran langsung kelas 1 | buah | 29 | CT - TR 100/5 A, Class 0,5s | Unit | 643.000 | 29 | Dari Kuala Kapuas ke Dusun Timur (Kec) Tly | T/m3 | 3.771.913 | |||||
31 | 30 | Single Side Ties ; Non Conductive ; AAAC-S ; 240 mm² | Buah | 94.166 | 47280 | 30 | Pengecatan Tiang Besi 11 M | Btg | 35.007 | 30 | Pengelasan Tiang Besi untuk Modifikasi | Btg | - | 30 | LA 21 kV; 10kA; Polimer SIR | buah | 30 | CT - TR 150/5 A, Class 0,5s | Unit | 712.000 | 30 | Dari Kuala Kapuas ke Karusen Janang (Kec) Dayu | T/m3 | 3.606.945 | |||||
32 | 31 | Double Top Ties ; Non Conductive ; AAAC-S ; 70 mm² | Buah | 168.731 | 48462 | 31 | Pengecatan Tiang Besi 12 M | Btg | 38.692 | 31 | Bongkar Travers Biasa Tanpa Arm Tie | Bh | 104.357 | 31 | LA 24 kV; 10kA; Polimer SIR | buah | 31 | CT - TR 200/5 A, Class 0,5s | Unit | 695.000 | 31 | Dari Kuala Kapuas ke Paju Epat (Kec) Telang Baru | T/m3 | 4.093.800 | |||||
33 | 32 | Double Top Ties ; Non Conductive ; AAAC-S ; 150 mm² | Buah | 181.831 | 50826 | 32 | Pengecatan Tiang Besi 13 M | Btg | 40.841 | 32 | Bongkar Travers SP/DT tanpa Arm Tie | Bh | 187.841 | 32 | LBS Motorized with RTU | unit | 32 | CT - TR 250/5 A, Class 0,5s | Unit | 695.000 | 32 | Dari Kuala Kapuas ke Patangkep Tutui (Kec) Bentot | T/m3 | 3.329.318 | |||||
34 | 33 | Double Top Ties ; Non Conductive ; AAAC-S ; 240 mm² | Buah | 194.932 | 52008 | 33 | Pengecatan Tiang Besi 14 M | Btg | 49.009 | 33 | Bongkar Travers Biasa Lkp Arm Tie | Bh | 144.494 | 33 | LBS Motorized non RTU | unit | 33 | CT - TR 300/5 A, Class 0,5s | Unit | 695.000 | 33 | Dari Kuala Kapuas ke Pematang Karau (Kec) M.Plantau | T/m3 | 3.510.379 | |||||
35 | 34 | Double Side Ties ; Non Conductive ; AAAC-S ; 70 mm² | Buah | 168.731 | 53190 | 34 | Pengecatan Tiang Besi 17 M | Btg | 58.811 | 34 | Bongkar Travers SP/DT Lkp Arm Tie | Bh | 234.802 | 34 | MCB 1 Phase (2 A s/d 50 A) | buah | 33.900 | 34 | kWh Meter Pasca Bayar 1 Phase 230 V 5/40 A | Buah | 193.000 | 34 | Dari Kuala Kapuas ke Raren Batuah (Kec) Unsum | T/m3 | 3.534.521 | ||||
36 | 35 | Double Side Ties ; Non Conductive ; AAAC-S ; 150 mm² | Buah | 181.831 | 54372 | 35 | Pengecatan Tiang Besi 21 M | Btg | 66.830 | 35 | Perbaikan Travers Miring | Bh | - | 35 | MCB 3 Phase (10 A s/d 35 A) | buah | 154.000 | 35 | MCCB 63A | Unit | 791.600 | 35 | Dari Kuala Kapuas ke Paku | T/m3 | 3.506.356 | ||||
37 | 36 | Double Side Ties ; Non Conductive ; AAAC-S ; 240 mm² | Buah | 194.932 | 55554 | 36 | Pengecatan Tiang Besi 27 M | Btg | 81.682 | 36 | Bongkar Arm Tie | Bh | 46.146 | 36 | PHBTR PL-250-2-LBS | unit | 36 | MCCB 80A | Unit | 856.300 | 36 | Dari Kuala Kapuas ke Buntok | T/m3 | 3.023.524 | |||||
38 | 37 | Tree Guard ; 70 mm² | Buah | 213.604 | 56736 | 37 | Penomoran Tiang | Btg | 10.554 | 37 | Bongkar Isolator Tumpu / Buah | Bh | 16.328 | 37 | PHBTR PL-250-2-MCCB | unit | 37 | MCCB 100A | Unit | 856.300 | 37 | Dari Kuala Kapuas ke Dusun Selatan (Kec) Buntok | T/m3 | 3.023.524 | |||||
39 | 38 | Tree Guard ; 150 - 240 mm² | Buah | 263.873 | 57918 | 38 | Pemotongan untuk Pembongkaran Tiang Besi | Btg | 150.246 | 38 | Bongkar Isolator Tarik ( 1 Set 2 Piringan ) | Set | 50.541 | 38 | PHBTR PL-400-2-LBS | unit | 38 | MCCB 125A | Unit | 1.415.960 | 38 | Dari Kuala Kapuas ke Gunung Bintang Awai (Kec) Tabak Kanilan | T/m3 | 3.425.883 | |||||
40 | 39 | Tekep Isolator Tumpu ( Polimer ) ; Silicon | Buah | 83.153 | 59100 | 39 | Pengelasan Tiang Besi untuk Modifikasi | Btg | 145.281 | 39 | Pembongkaran AAAC 35 mm² | Gwg | 111.378 | 39 | PHBTR PL-400-4-LBS | unit | 39 | MCCB 160A | Unit | 1.454.960 | 39 | Dari Kuala Kapuas ke Dusun Utara (Kec) Pendang | T/m3 | 3.079.855 | |||||
41 | 40 | Tekep Isolator Tumpu ( Polimer ) ; PVC | Buah | 47.516 | 60282 | 40 | Pasang Travers Biasa Tanpa Arm Tie | Bh | 173.927 | 40 | Pembongkaran AAAC 50 mm² | Gwg | 125.135 | 40 | PHBTR PL-630-4-LBS | unit | 40 | MCCB 200A | Unit | 1.531.960 | 40 | Dari Kuala Kapuas ke Muara Teweh | T/m3 | 4.174.271 | |||||
42 | 41 | Tekep Isolator Lurus ; Tipe YS ; 70 mm² | Buah | 78.995 | 61464 | 41 | Pasang Travers SP/DT tanpa Arm Tie | Bh | 313.069 | 41 | Pembongkaran AAAC 70 mm² | Gwg | 142.823 | 41 | PHBTR PD-1000-6-LBS | unit | 41 | MCCB 225A | Unit | 1.531.960 | 41 | Dari Kuala Kapuas ke Gunung Timang (Kec) Kandui/Baturaya | T/m3 | 3.779.959 | |||||
43 | 42 | Tekep Isolator Lurus ; Tipe YS ; 150 mm² | Buah | 78.995 | 62646 | 42 | Pasang Travers Biasa Lkp Arm Tie | Bh | 240.823 | 42 | Pembongkaran AAAC 95 mm² | Gwg | 153.708 | 42 | NFA2X;2X10mm2;0,6/1kV;OH | meter | 42 | MCCB 250A | Unit | 1.531.960 | 42 | Dari Kuala Kapuas ke Gunung Purei (Kec) Lampeong | T/m3 | 5.300.878 | |||||
44 | 43 | Tekep Isolator Lurus ; Tipe YS ; 240 mm² | Buah | 91.112 | 63828 | 43 | Pasang Travers SP/DT Lkp Arm Tie | Bh | 391.337 | 43 | Pembongkaran AAAC 120 mm² | Gwg | 181.414 | 43 | NFA2X;2X16mm2;0,6/1kV;OH | meter | 43 | MCCB 300A | Unit | 3.314.960 | 43 | Dari Kuala Kapuas ke Montallat (Kec) Montalat | T/m3 | 3.441.978 | |||||
45 | 44 | Tekep Isolator Belokan ; Tipe YS ; 70 mm² | Buah | 128.886 | 65010 | 44 | Perbaikan Travers Miring | Bh | 136.072 | 44 | Pembongkaran AAAC 150 mm² | Gwg | 181.414 | 44 | NFA2X;4X16mm2;0,6/1kV;OH | meter | 44 | Modem AMR | Unit | 1.185.000 | 44 | Dari Kuala Kapuas ke Teweh Baru (Kec) Sabuh | T/m3 | 4.166.225 | |||||
46 | 45 | Tekep Isolator Belokan ; Tipe YS ; 150 mm² | Buah | 128.886 | 52008 | 45 | Pasang Arm Tie | Bh | 76.910 | 45 | Pembongkaran AAAC 240 mm² | Gwg | 211.126 | 45 | NFA2X-T;3X35+1X35;0,6/1kV;OH | meter | 45 | LBS Three Ways 24kV | set | 327.000.000 | 45 | Dari Kuala Kapuas ke Teweh Selatan (Kec) Bintang Ninggi | T/m3 | 4.077.706 | |||||
47 | 46 | Tekep Isolator Belokan ; Tipe YS ; 240 mm² | Buah | 138.034 | 53190 | 46 | Pasang Isolator Tumpu / Buah | Bh | 27.215 | 46 | Pembongkaran AAACS 70 mm² | Gwg | 166.407 | 46 | NFA2X-T;3X70+1X70;0,6/1kV;OH | meter | 46 | Cubicle Incoming ATS CB | set | 502.190.000 | 46 | Dari Kuala Kapuas ke Teweh Tengah (Kec) Lemo | T/m3 | 4.632.961 | |||||
48 | 47 | Tekep Isolator Extention ; Tipe YS ; 150 ; mm² | Buah | 24.351 | 54372 | 47 | Pasang Isolator Tarik ( 1 Set 2 Piringan ) | Set | 84.235 | 47 | Pembongkaran AAACS 150 mm² | Gwg | 232.106 | 47 | NYY;1X70mm2;0,6/1kV;Opstig | meter | 47 | Cubicle Incoming ATS LBS | set | 293.532.000 | 47 | Dari Kuala Kapuas ke Teweh Timur (Kec) Benangin | T/m3 | 5.099.698 | |||||
49 | 48 | Material Support Selubung Slope TS2G ( 7" ) / Tiang Beton 9 M | Buah | 2.673.808 | 55554 | 48 | Penarikan AAAC 35 mm² | Gwg | 185.630 | 48 | Pembongkaran AAACS 240 mm² | Gwg | 257.749 | 48 | NYY;1X95mm2;0,6/1kV;Opstig | meter | 48 | Recloser 24kV | Unit | 166.990.000 | 48 | Dari Kuala Kapuas ke Lahei | T/m3 | 5.123.840 | |||||
50 | 49 | Material Support Selubung Slope TS2G ( 8" ) / Tiang Beton 12 - 14 M | Buah | 2.987.144 | 56736 | 49 | Penarikan AAAC 50 mm² | Gwg | 208.559 | 49 | Pembongkaran AAAC 35 mm² dgn Pemadaman | Gwg | 166.834 | 49 | NYY;1X150mm2;0,6/1kV;Opstig | meter | 49 | 49 | Dari Kuala Kapuas ke Lahei Barat | T/m3 | 4.544.442 | ||||||||
51 | 50 | Strain Clamp ; 70 - 150 mm | Buah | 85.750 | 57918 | 50 | Penarikan AAAC 70 mm² | Gwg | 238.038 | 50 | Pembongkaran AAAC 50 mm² dgn Pemadaman | Gwg | 190.637 | 50 | NYY;1X240mm2;0,6/1kV;Opstig | meter | 50 | 50 | Dari Kuala Kapuas ke Puruk Cahu | T/m3 | 4.858.282 | ||||||||
52 | 51 | Strain Clamp ; 150 - 240 mm | Buah | 132.960 | 59100 | 51 | Penarikan AAAC 95 mm² | Gwg | 256.180 | 51 | Pembongkaran AAAC 70 mm² dgn Pemadaman | Gwg | 242.269 | 51 | NYY;4X70mm2;0,6/1kV;Opstig | meter | 51 | 51 | Dari Kuala Kapuas ke Barito Tuhup Raya (Kec) Makunjung | T/m3 | 5.421.586 | ||||||||
53 | 52 | Cross Arm Clevis | Buah | 40.839 | 60282 | 52 | Penarikan AAAC 120 mm² | Gwg | 302.358 | 52 | Pembongkaran AAAC 95 mm² dgn Pemadaman | Gwg | 266.363 | 52 | NA2XSEYBY;3X150MM2;20kV;UG | meter | 52 | 52 | Dari Kuala Kapuas ke Laung Tuhup (Kec) Muara Laung I | T/m3 | 5.131.886 | ||||||||
54 | 53 | Socket Clevis | Buah | 59.430 | 61464 | 53 | Penarikan AAAC 150 mm² | Gwg | 302.358 | 53 | Pembongkaran AAAC 120 mm² dgn Pemadaman | Gwg | 282.704 | 53 | NA2XSEYBY;3X240MM2;20kV;UG | meter | 53 | 53 | Dari Kuala Kapuas ke Murung (Kec) Beriwit | T/m3 | 4.858.282 | ||||||||
55 | 54 | Ball Clevis | Buah | 75.515 | 62646 | 54 | Penarikan AAAC 240 mm² | Gwg | 351.876 | 54 | Pembongkaran AAAC 150 mm² dgn Pemadaman | Gwg | 282.704 | 54 | NA2XSEYBY;3X300MM2;20kV;UG | meter | 54 | Dari Kuala Kapuas ke Tanah Siang (Kec) Saripoi | T/m3 | 5.083.604 | |||||||||
56 | 55 | Anchor Sackle | Buah | 73.112 | 63828 | 55 | Penarikan AAACS 70 mm² | Gwg | 277.344 | 55 | Pembongkaran AAAC 240 mm² dgn Pemadaman | Gwg | 404.753 | 55 | NFA2XSY-T;3X150+1X95;20kV;OH | meter | 55 | Dari Kuala Kapuas ke Tanah Siang Selatan (Kec) Dirung Lingkin | T/m3 | 4.983.014 | |||||||||
57 | 56 | Isolasi Stay / Tui Isolator MV | Buah | 65.488 | 65010 | 56 | Penarikan AAACS 150 mm² | Gwg | 386.844 | 56 | Pembongkaran AAACS 70 mm² dgn Pemadaman | Gwg | 242.269 | 56 | NFA2XSY-T;3X240+1X95;20kV;OH | meter | 56 | Dari Kuala Kapuas ke Permata Intan | T/m3 | 3.458.072 | |||||||||
58 | 57 | Plat Tanda Bahaya ( L 150 x P 200 x t 1,2 mm ) + Cat ( Pasang di Tiang ) | Buah | 40.213 | 66192 | 57 | Penarikan AAACS 240 mm² | Gwg | 429.582 | 57 | Pembongkaran AAACS 150 mm² dgn Pemadaman | Gwg | 282.704 | 57 | PT TM Indoor rasio 20.000V3:100V3 | unit | 5.474.660 | 57 | Dari Kuala Kapuas ke Sumber Barito | T/m3 | 5.373.302 | ||||||||
59 | 58 | Plat Besi Simpul ( L 150 mm x t 300 mm x T 8 mm ) | Buah | 245.175 | 67374 | 58 | Penarikan AAAC 35 mm² dgn Pemadaman | Gwg | 278.058 | 58 | Pembongkaran AAACS 240 mm² dgn Pemadaman | Gwg | 404.753 | 58 | PT Outdoor rasio 20.000V3:100V3 | unit | 7.364.735 | 58 | Dari Kuala Kapuas ke Sungai Babuat | T/m3 | 5.373.302 | ||||||||
60 | 59 | Alluminium Bending Wire 4 mm2 / Band Drat / Binding Wire | Meter | 12.157 | 68556 | 59 | Penarikan AAAC 50 mm² dgn Pemadaman | Gwg | 317.728 | 59 | Pembongkaran MVTIC 3 x 70 + G | Gwg | 509.303 | 59 | Tiang Baja 9m / 100 daN | batang | - | 59 | Dari Kuala Kapuas ke Uut Murung | T/m3 | 5.671.048 | ||||||||
61 | 60 | Alluminium PVC Bending Wire 5 mm2 / Band Drat/ Binding Wire | Meter | 12.544 | 69738 | 60 | Penarikan AAAC 70 mm² dgn Pemadaman | Gwg | 403.781 | 60 | Pembongkaran MVTIC 3 x 150 + G | Gwg | 611.164 | 60 | Tiang Baja 9m / 200 daN | batang | 3.621.343 | 60 | Dari Pulang Pisau ke Buntok | T/m3 | 2.669.449 | ||||||||
62 | 61 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 1 (combinated) | Set | 874.036 | 70920 | 61 | Penarikan AAAC 95 mm² dgn Pemadaman | Gwg | 443.939 | 61 | Pembongkaran MVTIC 3 x 240 + G | Gwg | 804.807 | 61 | Tiang Baja 9m / 350 daN | batang | - | 61 | Dari Pulang Pisau ke Tamiyang Layang | T/m3 | 3.417.837 | ||||||||
63 | 62 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 2 (combinated) | Set | 874.036 | 72102 | 62 | Penarikan AAAC 120 mm² dgn Pemadaman | Gwg | 471.174 | 62 | Pembongkaran MVTIC 3 x 70 + G dgn Pemadaman | Gwg | 725.551 | 62 | Tiang Baja 11m / 200 daN | batang | - | 62 | Dari Pulang Pisau ke Muara Teweh | T/m3 | 3.820.195 | ||||||||
64 | 63 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 350 daN Fedder 1 (combinated) | Set | 882.703 | 73284 | 63 | Penarikan AAAC 150 mm² dgn Pemadaman | Gwg | 471.174 | 63 | Pembongkaran MVTIC 3 x 150 + G dgn Pemadaman | Gwg | 906.939 | 63 | Tiang Baja 12m / 200 daN | batang | 5.149.152 | 63 | Dari Pulang Pisau ke Puruk Cahu | T/m3 | 4.504.206 | ||||||||
65 | 64 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 350 daN Fedder 2 (combinated) | Set | 882.703 | 74466 | 64 | Penarikan AAAC 240 mm² dgn Pemadaman | Gwg | 674.588 | 64 | Pembongkaran MVTIC 3 x 240 + G dgn Pemadaman | Gwg | 1.083.191 | 64 | Tiang Baja 12m / 350 daN | batang | 6.925.000 | 64 | Dari Buntok ke Tamiyang Layang | T/m3 | 1.156.577 | ||||||||
66 | 65 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 1 (combinated) | Set | 882.703 | 75648 | 65 | Penarikan AAACS 70 mm² dgn Pemadaman | Gwg | 403.781 | 65 | Bongkar Wire Clip | Gwg | 7.363 | 65 | Tiang Baja 13m / 350 daN | batang | 9.121.119 | 65 | Dari Buntok ke Muara Teweh | T/m3 | 1.558.937 | ||||||||
67 | 66 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 2 (combinated) | Set | 882.703 | 76830 | 66 | Penarikan AAACS 150 mm² dgn Pemadaman | Gwg | 471.174 | 66 | Bongkar Accessories MVTIC | Gwg | 66.841 | 66 | Tiang Baja 14m / 350 daN | batang | 9.300.000 | 66 | Dari Buntok ke Puruk Cahu | T/m3 | 2.242.947 | ||||||||
68 | 67 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 3 (combinated) | Set | 904.233 | 78012 | 67 | Penarikan AAACS 240 mm² dgn Pemadaman | Gwg | 674.588 | 67 | Pembongkaran GSW ( Ground Steel Wire ) | Gwg | 83.297 | 67 | Trafo 1 Phase 50 kVA, CSP, OD, li0 | Unit | 67 | Dari Tamiyang Layang ke Muara Teweh | T/m3 | 1.913.013 | |||||||||
69 | 68 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 1 (combinated) | Set | 904.233 | 31323 | 68 | Penarikan MVTIC 3x70 + G | Gwg | 848.839 | 68 | Bongkar Accesoris drugshoor | Set | 59.321 | 68 | Trafo 3 Phase 25 kVA, OD, Yzn5 | Unit | 68 | Dari Tamiyang Layang ke Puruk Cahu | T/m3 | 2.693.590 | |||||||||
70 | 69 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 2 (combinated) | Set | 904.233 | 34278 | 69 | Penarikan MVTIC 3x150 + G | Gwg | 1.018.606 | 69 | Bongkar Treckshoor Anchor Spiral | Set | 112.667 | 69 | Trafo 3 Phase 50 kVA, OD, Yzn5 | Unit | 69 | Dari Muara Teweh ke Puruk Cahu | T/m3 | 1.092.200 | |||||||||
71 | 70 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 3 (combinated) | Set | 913.098 | 37036 | 70 | Penarikan MVTIC 3x240 + G | Gwg | 1.341.345 | 70 | Bongkar Treckshoor Ulin 10x10x200 cm | Set | 156.346 | 70 | Trafo 3 Phase 50 kVA, OD, YnYn0 | Unit | 70 | Dari Kuala Kapuas ke Kandangan | T/m3 | 1.663.550 | |||||||||
72 | 71 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 12 M / 200 daN Fedder 1 (combinated) | Set | 899.800 | 39794 | 71 | Penarikan MVTIC 3x70 + G dgn Pemadaman | Gwg | 1.209.252 | 71 | Bongkar Treckshoor Beton Blok Bertulang | Set | 155.882 | 71 | Trafo 3 Phase 100 kVA, OD, Yzn5 | Unit | 71 | Dari Kuala Kapuas ke Barabai | T/m3 | 1.921.060 | |||||||||
73 | 72 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 12 M / 200 daN Fedder 2 (combinated) | Set | 905.711 | 42749 | 72 | Penarikan MVTIC 3x150 + G dgn Pemadaman | Gwg | 1.511.565 | 72 | Bongkar Semi Kontramast Anchor Spiral | Set | 112.667 | 72 | Trafo 3 Phase 100 kVA, OD, YnYn0 | Unit | 72 | Dari Kuala Kapuas ke Banjarmasin | T/m3 | 896.653 | |||||||||
74 | 73 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 1 (combinated) | Set | 899.800 | 45507 | 73 | Penarikan MVTIC 3x240 + G dgn Pemadaman | Gwg | 1.805.318 | 73 | Bongkar Semi Kontramast Ulin 10x10x200 cm | Set | 156.346 | 73 | Trafo 3 Phase 160 kVA, OD, Yzn5 | Unit | 73 | Dari Kuala Kapuas ke Jorong | T/m3 | 1.784.258 | |||||||||
75 | 74 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 2 (combinated) | Set | 905.711 | 48462 | 74 | Pasang Wire Clip | Gwg | 12.271 | 74 | Bongkar Semi Kontramast Beton Blok Bertulang | Set | 155.882 | 74 | Trafo 3 Phase 160 kVA, OD, YnYn0 | Unit | 74 | Dari Kuala Kapuas ke Pagatan | T/m3 | 2.822.345 | |||||||||
76 | 75 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 3 (combinated) | Set | 911.620 | 51220 | 75 | Pasang Accessories MVTIC | Gwg | 111.402 | 75 | Bongkar Aksesoris Kontramast Anchor Spiral | Set | 112.667 | 75 | Trafo 3 Phase 200 kVA, OD, Dyn5 | Unit | 75 | Dari Kuala Kapuas ke Palangkaraya | T/m3 | 1.502.607 | |||||||||
77 | 76 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 1 (combinated) | Set | 899.800 | 53978 | 76 | Penarikan GSW ( Ground Steel Wire ) | Gwg | 138.827 | 76 | Bongkar Aksesoris Kontramast Ulin 10x10x200 cm | Set | 178.681 | 76 | Trafo 3 Phase 200 kVA, OD, YnYn0 | Unit | 76 | Dari Banjarmasin ke Aluh Aluh | T/m3 | 617.416 | |||||||||
78 | 77 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 2 (combinated) | Set | 905.711 | 56933 | 77 | Pasang Accesoris drugshoor | Set | 98.868 | 77 | Bongkar Aksesoris Kontramast Beton Blok Bertulang | Set | 207.843 | 77 | Trafo 3 Phase 250 kVA, OD, Dyn5 | Unit | 77 | Dari Banjarmasin ke Aranio (darat) | T/m3 | 971.492 | |||||||||
79 | 78 | Material Konstruksi SUTM 1 ( Tiang Single ; Penyangga ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 3 (combinated) | Set | 911.620 | 59691 | 78 | Pasang Treckshoor Anchor Spiral | Set | 187.779 | 78 | Bongkar Pancang Ulin ( 2 kaki ) | Set | 130.818 | 78 | Trafo 3 Phase 400 kVA, OD, Dyn5 | Unit | 78 | Dari Banjarmasin ke Astambul | T/m3 | 878.950 | |||||||||
80 | 79 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 1 (combinated) | Set | 1.617.218 | 62646 | 79 | Pasang Treckshoor Ulin 10x10x200 cm | Set | 260.577 | 79 | Bongkar Sepatu Tiang | Set | - | 79 | Trafo 3 Phase 400 kVA, ID, Dyn5 | Unit | 79 | Dari Banjarmasin ke Beruntung Baru | T/m3 | 629.487 | |||||||||
81 | 80 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 1 (combinated) | Set | 1.617.218 | 65404 | 80 | Pasang Treckshoor Beton Blok Bertulang | Set | 259.804 | 80 | Bongkar Pancang Ulin (4 kaki) | Set | 195.384 | 80 | Trafo 3 Phase 630 kVA, ID, Dyn5 | Unit | 80 | Dari Banjarmasin ke Cintapuri Darussalam | T/m3 | 1.051.964 | |||||||||
82 | 81 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 350 daN Fedder 1 (combinated) | Set | 1.619.975 | 68162 | 81 | Pasang Semi Kontramast Anchor Spiral | Set | 187.779 | 81 | Bongkar Pancang Beton (2 bh) + Palang UNP (2 bh) | Set | 167.526 | 81 | Trafo 3 Phase 1000 kVA, ID, Dyn5 | Unit | 81 | Dari Banjarmasin ke Gambut | T/m3 | 553.843 | |||||||||
83 | 82 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 350 daN Fedder 2 (combinated) | Set | 1.619.975 | 71117 | 82 | Pasang Semi Kontramast Ulin 10x10x200 cm | Set | 260.577 | 82 | Bongkar Penghalang Panjat | Set | 19.703 | 82 | Tiang Beton 9m / 100 daN | Batang | - | 82 | Dari Banjarmasin ke Karang Intan | T/m3 | 844.347 | ||||||||
84 | 83 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 1 (combinated) | Set | 1.619.975 | 73875 | 83 | Pasang Semi Kontramast Beton Blok Bertulang | Set | 259.804 | 83 | Pembongkaran Plat Tanda Bahaya | Set | 19.703 | 83 | Tiang Beton 9m / 200 daN | Batang | 1.920.000 | 83 | Dari Banjarmasin ke Kertak Hanyar | T/m3 | 507.974 | ||||||||
85 | 84 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 2 (combinated) | Set | 1.619.975 | 76830 | 84 | Pasang Aksesoris Kontramast Anchor Spiral | Set | 187.779 | 84 | Pengepresan CCO / Connector 10-25 mm² | Bh | - | 84 | Tiang Beton 9m / 350 daN | Batang | 2.380.000 | 84 | Dari Banjarmasin ke Martapura | T/m3 | 754.218 | ||||||||
86 | 85 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 13 M / 350 daN Fedder 3 (combinated) | Set | 1.625.991 | 79588 | 85 | Pasang Aksesoris Kontramast Ulin 10x10x200 cm | Set | 297.802 | 85 | Pengepresan CCO / Connector 30-70 mm² | Bh | - | 85 | Tiang Beton 11m / 200 daN | Batang | 2.820.000 | 85 | Dari Banjarmasin ke Martapura Timur | T/m3 | 719.615 | ||||||||
87 | 86 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 1 (combinated) | Set | 1.652.586 | 82346 | 86 | Pasang Aksesoris Kontramast Beton Blok Bertulang | Set | 346.405 | 86 | Pengepresan CCO / Connector 95-150 mm² | Bh | - | 86 | Tiang Beton 12m / 200 daN | Batang | 3.610.000 | 86 | Dari Banjarmasin ke Martapura Barat | T/m3 | 764.679 | ||||||||
88 | 87 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 2 (combinated) | Set | 1.652.586 | 85301 | 87 | Pasang Pancang Ulin ( 2 kaki ) | Set | 218.030 | 87 | Pengepresan CCO / Connector 240 mm² | Bh | - | 87 | Tiang Beton 12m / 350 daN | Batang | 3.700.000 | 87 | Dari Banjarmasin ke Mataraman | T/m3 | 965.859 | ||||||||
89 | 88 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 14 M / 350 daN Fedder 3 (combinated) | Set | 1.661.451 | 88059 | 88 | Pasang Sepatu Tiang | Set | - | 88 | Pembongkaran LBS Motorized / Recloser / OMC Lkp | Set | 708.698 | 88 | Tiang Beton 13m / 350 daN | Batang | 4.600.000 | 88 | Dari Banjarmasin ke Pengaron | T/m3 | 1.124.388 | ||||||||
90 | 89 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 12 M / 200 daN Fedder 1 (combinated) | Set | 1.651.108 | 91014 | 89 | Pasang Pancang Ulin (4 kaki) | Set | 325.639 | 89 | Pembongkaran LBS Three Way Lkp | Set | 1.158.585 | 89 | Tiang Beton 13m / 500 daN | Batang | 4.980.000 | 89 | Dari Banjarmasin ke Sambung Makmur | T/m3 | 1.104.271 | ||||||||
91 | 90 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 12 M / 200 daN Fedder 2 (combinated) | Set | 1.655.541 | 93772 | 90 | Pasang Pancang Beton (2 bh) + Palang UNP (2 bh) | Set | 279.209 | 90 | Pembongkaran LBS Manual Lkp | Set | 472.465 | 90 | Tiang Beton 14m / 350 daN | Batang | 5.540.000 | 90 | Dari Banjarmasin ke Simpang Empat | T/m3 | 826.643 | ||||||||
92 | 91 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 1 (combinated) | Set | 1.651.108 | 50826 | 91 | Pasang Penghalang Panjat | Set | 32.839 | 91 | Pembongkaran DS Manual Lkp | Set | 472.465 | 91 | kWh meter prabayar Fasa Tunggal | buah | 91 | Dari Banjarmasin ke Sungai Pinang | T/m3 | 1.381.899 | |||||||||
93 | 92 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 2 (combinated) | Set | 1.655.541 | 52008 | 92 | Pemasangan Plat Tanda Bahaya | Set | 32.839 | 92 | Bongkar Arrester 1 Set (1) + Jumper | Bh | 31.957 | 92 | Joint;20kV;AL-AL;3x150mm2;1P;(Cold Shrink+ShearBolt) | set | 6.260.000 | 92 | Dari Banjarmasin ke Sungai Tabuk | T/m3 | 619.830 | ||||||||
94 | 93 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 13 M / 350 daN Fedder 3 (combinated) | Set | 1.657.018 | 53190 | 93 | Pengepresan CCO / Connector 10-25 mm² | Bh | 26.512 | 93 | Bongkar Cut Out 1 Set (1) + Jumper | Bh | 32.392 | 93 | Joint;20kV;AL-AL;3x240mm2;1P;(Cold Shrink+ShearBolt) | set | 6.260.000 | 93 | Dari Banjarmasin ke Tatah Makmur | T/m3 | 514.412 | ||||||||
95 | 94 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 1 (combinated) | Set | 1.651.108 | 54372 | 94 | Pengepresan CCO / Connector 30-70 mm² | Bh | 37.118 | 94 | Bongkar Pentanahan Arde TM 2,75 m | Set | - | 94 | Joint;20kV;AL-AL;3x300mm2;1P;(Cold Shrink+ShearBolt) | set | 6.260.000 | 94 | Dari Banjarmasin ke Alalak | T/m3 | 516.022 | ||||||||
96 | 95 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 2 (combinated) | Set | 1.655.541 | 55554 | 95 | Pengepresan CCO / Connector 95-150 mm² | Bh | 51.553 | 95 | Bongkar Pentanahan Arde TM 5,5 m | Set | - | 95 | Joint;20kV;AL-AL;3x150mm2;3P;(Cold Shrink+ShearBolt) | set | 6.790.000 | 95 | Dari Banjarmasin ke Anjir Muara | T/m3 | 582.008 | ||||||||
97 | 96 | Material Konstruksi SUTM 2 ( Tiang Single ; Penyangga Ganda ; P 2000 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Beton 14 M / 350 daN Fedder 3 (combinated) | Set | 1.657.018 | 56736 | 96 | Pengepresan CCO / Connector 240 mm² | Bh | 71.380 | 96 | Bongkar Pentanahan Arde Dengan Ground Rod 2.75-3 m | Set | 76.382 | 96 | Joint;20kV;AL-AL;3x240mm2;3P;(Cold Shrink+ShearBolt) | set | 6.790.000 | 96 | Dari Banjarmasin ke Anjir Pasar | T/m3 | 642.362 | ||||||||
98 | 97 | Material Konstruksi SUTM 4 / TM-4 ( Tiang Single ; Tiang Akhir ; P 2200 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 1 (combinated) | Set | 1.906.808 | 57918 | 97 | Pemasangan LBS Motorized / Recloser / OMC Lkp | Set | 1.181.163 | 97 | Bongkar Pentanahan Arde Dengan Ground Rod 5.5-6 m | Set | 122.211 | 97 | Joint;20kV;AL-AL;3x300mm2;3P;(Cold Shrink+ShearBolt) | set | 6.790.000 | 97 | Dari Banjarmasin ke Bakumpai | T/m3 | 1.229.002 | ||||||||
99 | 98 | Material Konstruksi SUTM 4 / TM-4 ( Tiang Single ; Tiang Akhir ; P 2200 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 200 daN Fedder 2 (combinated) | Set | 1.906.808 | 59100 | 98 | Pemasangan LBS Three Way Lkp | Set | 1.930.974 | 98 | Bongkar Kremona Tiang Besi / Beton Per-Cross | Cross | 275.786 | 98 | Joint;20kV;AL-AL;3x240-3x300mm2;3P;(Coldshrink+ShearBolt) | set | 6.790.000 | 98 | Dari Banjarmasin ke Barambai | T/m3 | 911.943 | ||||||||
100 | 99 | Material Konstruksi SUTM 4 / TM-4 ( Tiang Single ; Tiang Akhir ; P 2200 mm ) ; Hotdip Galvanis Min 70 Micron untuk Tiang Besi 12 M / 350 daN Fedder 1 (combinated) | Set | 1.909.565 | 60282 | 99 | Pemasangan LBS Manual Lkp | Set | 787.442 | 99 | Bongkar Plat Simpul / Kupingan Las di Tiang | Set | 89.795 | 99 | Term;20kV;AL;3P;3x150mm2;NON ISO;ID (Coldshrink+Shearbolt) | set | 5.170.000 | 99 | Dari Banjarmasin ke Belawang | T/m3 | 668.114 |