LISTA DE ACTIVIDADES
2
3
ItemDescripciónUnd.MetradoPrecio (S/.)Parcial (S/.)
4
01ESTRUCTURAS
5
01.01OBRAS PROVISIONALES
6
01.01.01CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80x2.40 Mund1,00506,82506,82
7
01.01.02OFICINA, ALMACEN Y CASETA DE GAURDIANIAm2100,0060,636.063,00
8
01.02OBRAS PRELIMINARES
9
01.02.01TRAZO NIVELES Y REPLANTEOm2270,885,551.503,38
10
01.02.02LIMPIEZA DEL TERRENO MANUALm2270,880,82222,12
11
01.03MOVIMIENTO DE TIERRAS
12
01.03.01CORTE DE ROCA SUELTA C/ MAQUINARIAm3748,1821,1415.816,53
13
01.03.02CARGUIO Y ELIMINACION CON VOLQUETE 10M3m3999,1810,6810.671,24
14
01.03.03EXCAVACIONE MASIVA MANUAL DE ZANJAS PARA CIMIENTOS CORRIDO , VIGAS Y ZAPATAZm351,6037,801.950,48
15
01.03.04RELLENO CON MATERIAL PROPIO SELECIONADOm370,7311,52814,81
16
01.03.05MATERIAL DE AFIRMADO PARA PISOS Y VEREDAS E=0.15 BASE DE CIMIENTOS Y ZAPATASm2285,8612,253.501,79
17
01.03.06NIVELACION Y APISONADO, PARA FALSO PISO Y VEREDASm2286,071,51431,97
18
01.03.07ELIMINACION DE MATERIAL EXCEDENTEm319,1422,43429,31
19
01.04OBRAS DE CONCRETO SIMPLE
20
01.04.01CIMIENTO CORRIDO C:H 1:10 + 30% PG MAX. 6"m339,9149,725.973,83
21
01.04.02SOBRECIMIENTO C:H 1:8+25% PM MAX 3"m37,42226,391.679,81
22
01.04.03ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS HASTA 0.30 Mm2105,2739,814.190,80
23
01.04.04CONCRETO EN FALSO PISO 4" C:H 1:8m2214,6329,766.387,39
24
01.05OBRAS DE CONCRETO ARMADO
25
01.05.01ZAPATAS Y VIGAS DE CIMENTACION
26
01.05.01.01CONCRETO PARA ZAPATAS F`c=210 KG/CM2m34,81352,641.696,20
27
01.05.01.02ACERO FY=4200 KG/CM2kg82,883,65302,51
28
01.05.02VIGAS DE CIMENTACION
29
01.05.02.01CONCRETO PARA VIGAS DE CIMENTACION f'c=210 kg/cm2m31,31346,71454,19
30
01.05.03ACERO EN VIGAS DE CIMENTACION FY=4200 KG/CM2
31
01.05.03.01ACERO EN VIGAS DE CIMENTACION FY=4200 KG/CM2 3/8"kg55,803,23180,23
32
01.05.03.02ACERO EN VIGAS DE CIMENTACION FY=4200 KG/CM2 5/8"kg160,323,23517,83
33
01.05.03.03ENCOFRADO Y DESENCOFRADO DE VIGA DE CIMENTACIONm28,7048,36420,73
34
01.05.04ESCALERAS
35
01.05.04.01CONCRETO EN ESCALERAS F`c=210 KG/CM2m33,83361,601.384,93
36
01.05.04.02ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAm218,2567,751.236,44
37
01.05.04.03ACERO FY=4200 KG/CM2 3/8"kg59,793,23193,12
38
01.05.04.04ACERO FY=4200 KG/CM2 1/2"kg207,793,23671,16
39
01.05.04.05TARRAJEO EN FONDO DE ESCALERAS C:A 1:5m25,7815,6490,40
40
01.05.04.06ENCHAPADO CON CERAMICO ESCALERA (PASO, COTRAPASO, DESCANZO)m220,5053,341.093,47
41
01.05.04.07BARANDA DE FIERRO NEGRO PASAMANO Y PARANTES DE 2" Y INTERMEDIOSm11,04321,133.545,28
42
01.05.05COLUMNAS
43
01.05.05.01CONCRETO PARA COLUMNAS - COLUMNETAS F'C= 210 kg/cm2m37,11390,302.775,03
44
01.05.05.02ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNASm2107,8042,884.622,46
45
01.05.05.03ACERO COLUMNAS FY=4200 KG/CM2 3/8"kg187,083,23604,27
46
01.05.05.04ACERO COLUMNAS FY=4200 KG/CM2 1/2"kg874,753,232.825,44
47
01.05.05.05ACERO COLUMNAS FY=4200 KG/CM2 5/8"kg1.188,003,233.837,24
48
01.05.05.06ACERO COLUMNAS FY=4200 KG/CM2 3/4"kg668,253,232.158,45
49
01.05.05.07ACERO COLUMNAS FY=4200 KG/CM2 1"kg3.152,163,2310.181,48
50
01.05.06VIGAS
51
01.05.06.01CONCRETO PARA VIGAS F`c=210 KG/CM2m310,89351,393.826,64
52
01.05.06.02ENCOFRADO Y DESENCOFRADO NORMAL EN VIGASm254,6049,372.695,60
53
01.05.06.03ACERO VIGAS FY=4200 KG/CM2 1/4"kg71,253,23230,14
54
01.05.06.04ACERO VIGAS FY=4200 KG/CM2 3/8"kg557,213,231.799,79
55
01.05.06.05ACERO VIGAS FY=4200 KG/CM2 1/2"kg394,713,231.274,91
56
01.05.06.06ACERO VIGAS FY=4200 KG/CM2 5/8"kg734,943,232.373,86
57
01.05.06.07ACERO VIGAS FY=4200 KG/CM2 3/4"kg291,773,23942,42
58
01.05.06.08ACERO VIGAS FY=4200 KG/CM2 1"kg218,103,23704,46
59
01.05.07LOSA ALIGERADA
60
01.05.07.01CONCRETO LOSA ALIGERADA fc= 210 kg/cm2m318,02359,916.485,58
61
01.05.07.02ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADAm2179,1239,087.000,01
62
01.05.07.03ACERO FY=4200 KG/CM2 1/4"kg253,353,23818,32
63
01.05.07.04ACERO FY=4200 KG/CM2 3/8"kg114,323,23369,25
64
01.05.07.05ACERO FY=4200 KG/CM2 1/2"kg758,473,232.449,86
65
01.05.07.06LADRILLO HUECO DE ARCILLA h=20 cm PARA TECHO ALIGERADOund1710,852,854.875,92
66
02ARQUITECTURA
67
02.01MUROS Y TABIQUES DE ALBAÑILERIA
68
02.01.01MURO DE LADRILLO DE ARCILLA DE SOGA CON MEZCLA 1:5 X 1.5 cmm2210,2441,938.815,36
69
02.02REVOQUES ENLUCIDOS Y MOLDURAS
70
02.02.01TARRAJEO MUROS INTERIORES C:A=1:5, E=1.5 CMm2222,1115,643.473,80
71
02.02.02TARRAJEO DE MUROS EXTERIORES C:A=1:5, E=1.5 CMm294,5931,612.989,99
72
02.02.03TARRAJEO EN COLUMNAS C:A=1:5, E=1.5 CMm2166,2018,253.033,15
73
02.02.04TARRAJEO EN VIGAS C:A=1:5, E=1.5 CMm229,5919,65581,44
74
02.02.05DERRAMES EN PUERTAS Y VENTANAS ESPESOR 1.5CM, MEZ 1:5m267,527,897.460,58
75
02.03CIELORRASOS
76
02.03.01TARARAJEO CIELORRASO CON MORTERO 1:5 X 1.5 cmm2166,6745,687.613,49
77
02.04PISOS Y PAVIMENTOS
78
02.04.01CONTRAPISO DE 40 MM PRIMER PISOm2191,6527,975.360,45
79
02.04.03PISO DE CERAMICO DE 30*30 DE BUENA CALIDADm2152,4853,218.113,46
80
02.04.04PISO DE CERAMICO DE 30*30 DE BUENA CALIDAD ANTI DESLIZANTEm268,8463,104.343,80
81
02.04.05TERRAZA DE CONCRETO PRIMER PSIO FC=140KG/CM2 E=9CM +1CM ACABADOm217,94215,493.865,89
82
02.05CONTRAZOCALOS Y ZOCALOS
83
02.05.01CONTRAZOCALO DE CERAMICA 20x30 cm, h=0.15 mm2152,4842,196.433,13
84
02.05.02ZOCALO DE CERAMICA 20x30 cm.m2129,0057,947.474,26
85
02.06CARPINTERIA DE MADERA
86
02.06.01PUERTA DE CEDRO ENTABLERADAm227,37328,008.977,36
87
02.07CARPINTERIA METALICA
88
02.07.01VENTANA DE FIERRO C/PERFIL 1"* 1/8" CON PROTECCIONm281,0972,255.858,75
89
02.07.02PROTECCION DE VENTANA DE FIERRO C/FIERRO LISO DE 3/8"m281,0969,795.659,27
90
02.08CERRAJERIA
91
02.08.01CERRADURA PARA PUERTA PRINCIAPLA PESADAund10,0059,71597,10
92
02.08.02CERROJO PARA PUERTA DE BAÑOund15,005,8087,00
93
02.08.03MANIJA DE BRONCE DE 4"pza15,0011,96179,40
94
02.08.04BISAGRA CAPUCHINA DE 4"X4"pza60,0027,321.639,20
95
02.08.05BISAGRA CAPUCHINA DE 3"X3"pza18,0014,60262,80
96
02.09VIDRIOS, CRISTALES Y SIMILARES
97
02.09.01VIDRIOS SEMIDOBLES INCOLORO CRUDOp2968,884,404.263,07
98
02.10PINTURA
99
02.10.01PINTURA BASE EN MUROS INTERIORES INCLUYE DERRAMESm2250,710,362.597,25
100
02.10.02PINTURA EN PAREDES EXTERIORESm294,5910,36979,95