PROJECT:
2
ADDRESS:
3
4
DATE
5
SR #CSI SECTDESCRIPTIONQUANTITYWASTAGE
(10%)
QTY WITH
WASTAGE
UNIT OF
MEASURMENT
UNIT COSTTOTAL ITEM
COST
TOTAL TRADE
COST
6
DIV.01GENERAL CONDITIONS $ -
7
1PERMITS DOCUMENTATION AND FEES0% - LS $ -
8
2HAZARDOUS WASTE OR DISPOSAL WORK0% - LS $ -
9
3OWNER PURCHASED, CONTRACTOR INSTALLED ITEMS0% - LS $ -
10
4CONTRACTORS USE OF NEW AND EXISTING FACILITIES0% - LS $ -
11
5CORRECTION OF UNSATISFACTORY CONDITIONS0% - LS $ -
12
6RESTORATION OF UNIT DAMAGED DURING INSTALLATION0% - LS $ -
13
7REPLACEMENT OF UNITS WHICH CANNOT BE RESTORED 0% - LS $ -
14
8MAINTAINING EXISTING CONSTRUCTION IN WEATHER HIGHT CONDITIONS0% - LS $ -
15
9LAND SCAPING0% - LS $ -
16
10DOOR HARDWARE0% - LS $ -
17
11SIGNAGE0% - LS $ -
18
12SUPERVISORY PERSONNEL0% - LS $ -
19
20
TEMPORARY SERVICES
21
13WATER0% - LS $ -
22
14LIGHTING AND POWER0% - LS $ -
23
15TOILET FACILITIES0% - LS $ -
24
16MATERIAL STORAGE0% - LS $ -
25
26
CONSTRUCTION FACILITIES
27
17DEWATERING0% - LS $ -
28
18ELEVATORS0% - LS $ -
29
19ACCESS WAYS AND REPAIR OF THEM0% - LS $ -
30
20FIRE EXTINGUISHERS0% - LS $ -
31
21SITE ENCLOSURE FENCE, SIGNS0% - LS $ -
32
22CONTRACTOR FIELD OFFICE0% - LS $ -
33
23CLEANING0% - LS $ -
34
35
CONSTRUCTION AIDS
36
24SCAFFOLDINGS AND PLATEFORMS0% - LS $ -
37
25CRANES0% - LS $ -
38
26SWING STAGING0% - LS $ -
39
27BUILDING KEYS0% - LS $ -
40
28COMMUNICATION/ EXCESS DEVICES0% - LS $ -
41
29CONTRACTOR'S SAFETY PROGRAM0% - LS $ -
42
43
DIV. 07THERMAL & MOISTURE PROTECTION $ 19,587
44
45
INSULATIONS & SEALANTS AT WALLS
46
303" Acoustic Batt Insulation 4,380 10% 4,818 SF $ -
47
31Sheetrock Acoustical Sealant 2,131 10% 2,344 LF $ -
48
321" Rigid Insulation 19,399 10% 21,339 SF $ -
49
33Sound & Waterproof Membrane On Top Of All Interior Slab Area-"NobleSEAL SIS" By Noble In 3/64" Thickness, Glued To Concrete W/ "NobleBond 21" Latex Based Adhesive 23,293 10% 25,622 SF $ -
50
34R-30 Spray Foam Insulation 16,534 10% 18,187 SF $ -
51
52
SIDINGS
53
35Building Logo From UV Resistant Acrylic Sheet (1/2" Thick) 126 10% 139 SF $ -
54
36Facid/Structurflex Mesh On Aluminum Structure Cladding 7,395 10% 8,135 SF $ -
55
37McNichols Eco-Mesh In Woven Steel Wire Painted On Flat Panels For Vertical Planting 78 10% 86 SF $ -
56
38Painted Cement Screed @ Exterior (Sherwin Williams-SW7078 Minute Mauve) 11,798 10% 12,978 SF $ -
57
39Painted Cement Screed @ Exterior (Sherwin Williams-SW7081 Sensuous Gray) 1,827 10% 2,010 SF $ -
58
40Painted Concrete Eyebrow (Color:SW6881 Cayenne) 3 10% 3 SF $ -
59
41Painted Concrete Stairs (Color:SW6881 Cayenne) 26 0% 26 RISER $ -
60
42White Painted Steel Handrailing 19 10% 21 LF $ -
61
62
ROOFING
63
43Mech Equipment Screen From McNichols Perforated Aluminum Panels 495 10% 545 SF $ -
64
44Roof Acess Hatch 1 0% 1 EA $ -
65
45Furring Channels 20Ga 1-1/2"x3" @ Roof Bottom Joist 8,094 10% 8,903 SF $ 2.2 $ 19,587
66
46Fiberglass Batt Insulation Blankets 8,094 10% 8,903 SF $ -
67
47Fire Barrier Membrane From 5/8" USG Firecode "C" Core Gypsum Board 8,094 10% 8,903 SF $ -
68
48Built Up Roof Membrane 8,094 10% 8,903 SF $ -
69
49Aluminum Gutter 407 10% 448 LF $ -
70
50Alum Downspouts 120 10% 132 LF $ -
71
512.5' Base Flashing 1,018 10% 1,120 SF $ -
72
73
74
SUB TOTAL
$ 19,587 $ 19,587
75
OVERHEAD & PROFIT (25%)
25% $ 4,897 $ 4,897
76
TOTAL BID
$ 24,484 $ 24,484
77
PREPARED BY :
78
Notes
79
1. This estimate is based on real market prices that are regularly updated by our team persons through market surveys and online resoures.
80
2. This sheet is your property and we encourage you to fine tune the wastage and pricing values to your preference.
81
3. Feel free to contact us for any queries or suggestions.