Weekly work diary of Arya P R for the week 03/2/2025 to 09/2/2025
3
4
Date DayWork donePersons metLearningsFollow up needed
5
Part 1Part 2
6
2/3/2025Monday FNOn Leave
7
8
AN
9
10
2/4/2025TuesdayFNAttended the Session by IEX Team on Functioning of Power Exchange and Policy & Regulatory Developments.
Worked on crosschecking Technoparks ABB Bills
Dhruv Daman (IEX VP) and TeamVery brief idea on IEX and their role, bidding, Day Ahead Market, RTM
11
12
AN
13
14
2/5/2025WednesdayFNFollow-up meeting with Mohanakumar Sir, on details regarding the Anathapuram Industrial Development Association hearing and asked to go through the hearing note and to report if we are getting an idea on the concept and if there is any correction.Interacted with Sarma Sir and Mr Arakesh (JC) on the current works being carried out and the areas that need to be focussed.Mohanakumar Sir, Sarma Sir, Mr Arakesh (JC)Brief idea on power exchange, challenges faced in Anathapuram, idea on Engineering wing of KSERCTraiff comparison document need to be analysed.
Getting thorough with RE Discussion paper before meeting with stakeholders.
15
16
ANFollow up meeting with Mohahakumar sir and updated the corrections and cleared the ares we are having doubts.
Meeting with Pradeep Sir along along with Sarma Sir and Mr Arakesh (JC) redarding the presenation on RE Discussion Paper
Drafted sample mail for sharing soft copy of discussion paper on Regulatory Framework for Renewable Energy for Review.

Started working on contents for slide preparation
Mohanakumar Sir, Pradeep Sir, Sarma Sir, Mr Arakesh (JC)Preparation on article on Functioning of Power Exchange
17
18
2/6/2025ThursdayFNWorked on drafting contents for presentation on RE Disussion PaperAttended hearings on: OP 01/2025 – Petition seeking for drawing power from
the solar plant considering it as a wheeling permission
for intrastate Open Access.
Petitioner : M/s Lulu International Shopping Mall
Private Limited.
Respondent : KSEB Ltd.
19
20
ANDrafted contents for presentation on RE Disussion Paper and shared with Mr Arakesh (JC).
Worked on drafting contents for status report on Discussion paper on Regulatory framework for development of
Renewable Energy in Kerala
Attended herings on: OP 27/2024 - Petition seeking immediate installation of
substation at Seethangoli and speed up the stopped
Mailatty Vidhyanagar 110 kV feeder drawing work
Petitioner : Ananthapuram Industrial Development
Association
Respondent : KSEB Ltd
Mr Arakesh (JC)
21
22
2/7/2025FridayFNWorked on drafting intial presentation on RE Disussion Paper along with Mr.Arakesh (JC) and checked with Sarma sir on suggetsions and corrections. Attended meeting with Pradeep Sir on intial draft presentations and recieved suggestions and corrections.Pradeep Sir, Sarma Sir,Mr Arakesh (JC)
23
24
AN
25
26
02/08/2025SaturdayFNUpdated some slide corrections.
27
28
AN
29
30
02/09/2025SundayHoliday
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100