ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Action NameAssign To:Typical PriorityWhen to assign High PriorityNotes:
2
-------- Deck --------Do not use
3
Apply Deck Overlay (Bare Deck)StructuresMediumLeaking through the deck causing CS3Overlays include Waterproofing membrane and Healer/Sealer
4
Replace/Repair Deck OverlayStructuresMediumLeaking through the deck causing CS3Overlays include Waterproofing membrane and Healer/Sealer
5
Remove Underside Spalls MaintenanceHigh (Safety)Only use High PriorityUse Remove Loose Concrete Item for Loose concrete over Traffic (Send Email to Inspection Manager and Emergency and Maintenance Coordinator)
6
Install False DeckingStructuresHighOnly use High PriorityCatch system for falling concrete. Send e-mail to Bridge Inspection Manager and Bridge Maintenance Cord.
7
Patch Structural PotholeStructuresMediumWhen deck has more than 20% potholes or a blow throughIf more than 30% use Rehab Deck Item
8
Deck Pothole PatchingStructuresMediumThe pothole is below the top mat of rebar
9
Repair Deck Overhang / EdgeStructuresLowExtensive section loss of reinforcement through out.Use Remove Loose Concrete Item for Loose concrete over Traffic
10
Remove Debris from Deck / ShoulderMaintenanceRoutineNA
11
Crack Seal Deck AsphaltMaintenanceRoutineNA
12
Rehab DeckStructuresHighOnly use High PriorityUse if deck has more than 30% potholes
13
-------- Approach --------Do not use
14
Approach Slab Pothole PatchingStructuresMediumThe pothole is below the top mat of rebar
15
Patch Approach Slab PotholesStructuresMediumWhen Approach Slab has > 20% potholes
16
Rehab Approach SlabStructuresMediumIf measured settlement is > 3"
17
Crack Seal Approach AsphaltMaintenanceRoutineIf settlement is actively occurring due to water penetrating the approach
18
-------- Parapets --------Do not use
19
Paint / Seal ParapetsStructuresMediumParapets have reinforcing exposed throughout.
20
Repair ParapetsStructuresMediumMaintaince crews repairing ParapetsRepairs as coordinated with Structures Group
21
Rehab ParapetsStructuresMediumIf damage to the Parapet causes it to no longer be crash worthy (High Safety)
22
Repair FencingMaintenanceMediumIf pedestrians have reasonable access affected area (High Safety)If repair includes parapet repair (pole base /pocket repair), assign to structures
23
Update Barrier to StandardsStructuresMedium (Safety)
24
-------- Joints --------Do not use
25
Repair Expansion JointStructuresMediumHeavy deterioration occurring to super or substructures due to water leaking
26
Seal Relief / Backwall JointsMaintenanceRoutineHeavy deterioration occurring to super or substructures due to water leaking
27
Rehab Expansion JointsStructuresMediumHeavy deterioration occurring to super or substructures due to water leaking or is a sliding plateIncludes extensive spalling along joint headers
28
Remove Debris from JointsMaintenanceRoutineIf joint or gland is full of debris
29
-------- Super --------Do not use
30
Clean & Paint Bearing UnitsStructuresMediumIf bearings are in CS3If bearings are in CS4, use Repair/Replace/Reset Bearings item
31
Repair/Replace/Reset BearingsStructuresHighOnly use High Priority
32
Repair Beam / Girder (Collision Damage)StructuresMediumIf damage is significantly reducing load capacity or showing severed prestressing strands If high priority, send e-mail to Bridge Inspection Manager and Bridge Maintenance Cord.
33
Repair Beam / Girder EndsStructuresMediumIf girder is at risk of loosing bearing capacity
34
Replace Pin and HangerStructuresHighOnly use High PriorityOnly use if defects are found in the Pin, or Hanger has lateral deformation due to pack rust. Send e-mail to Bridge Inspection Manager and Bridge Maintenance Cord.
35
Repair Beam / GirderStructuresMediumGirder or Beam deterioration is causing loss of load capacity or prestressing strands are severed. Steel has cracking or extreme section loss. Beams are showing new signs of loss of camber (sagging).
36
Repair Prestressing StrandStructuresHighOnly use High PriorityPrestressing strands are broken / frayed
37
Repair DiaphragmStructuresLowIf diaphragm is a primary load carrying member (curved girders) or at risk of falling.
38
Epoxy Inject Cracks in GirdersStructuresHighOnly use High Priority
39
Remove Debris from BearingsMaintenanceMediumDebris are causing accelerated deterioration of primary structure elements
40
Power Wash Structural ElementsMaintenanceMediumNAE-mail Bridge Inspection Manager to add to Desk Review Audit
41
Repaint Steel SuperstructureStructuresMediumMeasureable section loss occurring in > 5% of steel or more than 33% of coating in CS4Note amount of exposed steel in %
42
Repair Misc. Steel StructuresMediumIf affecting primary load path.For Cracking of steel Connectors or extreme section loss. Also use for broken, loose or missing connection plates.
43
-------- Substructure --------Do not use
44
Repair Bent / Pier CapStructuresMediumDeterioration is causing significant loss of load capacity
45
Repair Pier WallStructuresMediumDeterioration is causing significant loss of load capacity
46
Repair ColumnStructuresMediumDeterioration is causing significant loss of load capacity
47
Seal ColumnMaintenanceLowNAIf column has large spalls with exposed reinforcement or heavy delams, use repair column item.
48
Repair PedestalStructuresMediumThere is a loss of bearing area
49
Repair WingwallStructuresLowWingwall has significant tipping or has a loss of structural integrity
50
Repair AbutmentStructuresLowAbutment has significant tipping, settlement or has a loss of structural integrity
51
Maintain Slope Protection JointsMaintenanceRoutineNAIncludes removing vegetation and resealing joints around slope protection panels
52
Repair Concrete Slope ProtectionMaintenanceRoutineErosion causing settlement of the panels
53
-------- Channel --------Do not use
54
Repair & Restore ChannelStructuresMediumCausing scour of structure or significant alignment issues
55
Install Scour CountermeasuresStructuresMediumBridge is Scour Critical
56
Repair Scour Damage / Install Scour Countermeasures
StructuresMediumBridge is Scour Critical or significant undermining of substructureE-mail Bridge Inspection Manager and Program Manager for Hydraulics Review
57
Remove Debris or VegetationMaintenanceMediumAffecting channel alignment, or negatively affecting max channel flowCan also be used to remove vegetation impleading inspection
58
Remove SedimentMaintenanceMediumIf freeboard is less than 75% of intended
59
---- Drainage ----Do not use
60
Modify Drain(s)StructuresMediumNAUse if drains are causing wheel traps or ponding is occurring
61
Extend Drains Below SuperstructureMaintenanceMediumHeavy deterioration occurring to super or substructures due to waterIf it is hard to access drain area, assign to structures.
62
Removed Debris from DrainMaintenanceRoutineDrain completely plugged.
63
Repair Erosion (From Roadway Runoff)MaintenanceRoutineCausing settlement of abutment or wingwallsFor erosion caused by water from the roadway
64
---- Signs ----Do not use
65
Replace Missing Prpt DelineatorsMaintenanceMedium (Safety)NATypically used for curved bridges
66
Update / Install Clearance SignsMaintenanceMedium (Safety)If the structure has a clearance less than 16 FT and doesn't have a sign. If the current clearance sign shows a clearance greater than the structure will allow. High (Safety)Send e-mail to Bridge Inspection Manager and Bridge Maintenance Cord. for High priorities.
67
Update / Install Load Limit SignMaintenanceHigh (Safety)NASend e-mail to Bridge Management Engineer
68
Update / Repair Other SigningMaintenanceMedium (Safety)NA
69
Install / Replace Object MarkersMaintenanceMedium (Safety)NA
70
Install Advance Warning SignsMaintenanceMedium (Safety)NA
71
---- Safety ----Do not use
72
Repair Roadway Approach BarrierMaintenanceMediumIf damage causes the barrier to no longer function properly or be crash worthy. High (Safety)
73
Update Roadway Approach BarrierStructuresMedium (Safety)Barrier is grossly under designed for current traffic. High (Safety)
74
Repair End TreatmentMaintenanceMediumIf damage causes the barrier to no longer function properly or be crash worthy. High (Safety)
75
Update End TreatmentStructuresMedium (Safety)Barrier is grossly under designed for current traffic. High (Safety)
76
Update Prpt to Approach Rail ConnectStructuresMedium (Safety)NAUse if Transition Section needs to be updated.
77
Remove Loose ConcreteMaintenanceHigh (Safety)NASend e-mail to Bridge Inspection Manager and Bridge Maintenance Cord.
78
Repair SidewalkMaintenanceMedium (Safety)If there is a sever risk to pedestrians
79
Repair Lighting MaintenanceMedium (Safety)NA
80
-------- Other --------Do not use
81
Repair UtilityStructuresMediumIf leaking utility is causing damage to structure.Send e-mail to Bridge Inspection Manager and Bridge Maintenance Cord. if high priority.
82
Remove GraffitiMaintenanceMediumNA
83
Rehab TimberStructuresMediumIf there is extensive section lossFor use on all timber elements
84
Rehab CulvertStructuresMediumIf there is extensive section loss
85
LidarStructuresMediumNALidar clearances or another element to monitor movement
86
OtherStructuresAssign as determined by InspectorIf commonly using this item, e-mail Bridge Inspection Manager to add item to list
87
88
89
90
91
92
93
94
95
96
97
98
99
100