1 | Theatre Maintenance and Improvement Tasks | |||||
2 | 2/30 completed | |||||
3 | ||||||
4 | ✓ | Urgency (H/M/L) | Task | Project lead | Approx Cost | Comments/status |
5 | Big Projects | MIrrors and lights in dressing room | ||||
6 | Big Projects | Fire board under stage and trolleys | ||||
7 | Big Projects | Replace radiators in Green Room and new foyer with electric heaters | ||||
8 | Big Projects | Hive System for Gas boiler, WiFi switches for electric heaters | ||||
9 | Big Projects | Fire Alarm System (L2) | ||||
10 | Big Projects | New foyer doors | ||||
11 | H | Emergency Exit push bars for new foyer | New door needed | |||
12 | H | Label PIRs back to fuse boxes and colour code | Alan Richardson | In progress | ||
13 | H | Hand rail for stairs to stage | ||||
14 | H | Fix gutter drainage on East side of building | ||||
15 | H | Investigate mould in Green room | ||||
16 | H | Leak above foyer | ||||
17 | H | Check socket in wooden cabin. Locate water leak. | ||||
18 | M | Ventillation in Green room | Dave Morgan | |||
19 | M | Secure ladder in old foyer | ||||
20 | M | Power sequencer for sound kit in old lighting tower | Electrical | |||
21 | M | Reroute urinals in old gents toilets via WC | ||||
22 | M | DMX lights and controllers | Need to get advice | |||
23 | L | Install hearing loop | Woody | Clips need to be fitted first. Will it interfere with band amplifiers? Need to test before installing | ||
24 | L | Refit adult changing room - Mirrors | All | |||
25 | L | Raise front lighting bar - fit proper electrical bar? | £1,000 | |||
26 | L | Black valence for new staging blocks | ||||
27 | L | Remove Lighting tower dependency on auditorium light switch | Electrical | |||
28 | L | Vertical lighting/sound bar in front of stage? | ||||
29 | L | Shelf for CCTV system in the costume storage area | ||||
30 | L | Protection for air ducting above adult dressing room? | ||||
31 | L | Black curtains and track under lighting tower - move fire extinguisher | ||||
32 | L | Add curtain in front of paint shelves | ||||
33 | L | Additional shelf in tuck shop/bar cabinet in new foyer | ||||
34 | L | Redesign broom cupboard | ||||
35 | L | Stairs to Costume storage. | ||||
36 | L | Move half-tab rope pulley (winch?). Move front wings back 6 inches? | ||||
37 | L | Extend sewage fume pipe outside kitchen | ||||
38 | L | Move boiler condensation outlet to sink drainage (not outside building) | ||||
39 | L | Larger sweet cabinet in "old" tuck shop | ||||
40 | L | Hot "zip tap" for new foyer | ||||
42 | L | Paint stage corridor black - new ceiling? | ||||
43 | L | Short throw projector for stage? | ||||
44 | L | Speaker in new foyer | ||||
45 | ||||||
46 | ||||||
47 | ||||||
48 | ||||||
49 | ||||||
50 | ||||||
51 | ||||||
52 | ||||||
53 | ||||||
54 | ||||||
55 | ||||||
56 | ||||||
57 | ||||||
58 | ||||||
59 | ||||||
60 | ||||||
61 | ||||||
62 | ||||||
63 | ||||||
64 | ||||||
65 | ||||||
66 | ||||||
67 | ||||||
68 | ||||||
69 | ||||||
70 | ||||||
71 | ||||||
72 | ||||||
73 | ||||||
74 | ||||||
75 | ||||||
76 | ||||||
77 | ||||||
78 | ||||||
79 | ||||||
80 | ||||||
81 | ||||||
82 | ||||||
83 | ||||||
84 | ||||||
85 | ||||||
86 | ||||||
87 | ||||||
88 | ||||||
89 | ||||||
90 | ||||||
91 | ||||||
92 | ||||||
93 | ||||||
94 | ||||||
95 | ||||||
96 | ||||||
97 | ||||||
98 | ||||||
99 | ||||||
100 | ||||||
101 |