Enclosed distribution program, including costs, for equipement and furniture, the official copy.
Comments
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
Comment only
 
 
Still loading...
ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Purposeמ"ר/יחי' MetersCosts - Shekels
2
Plaster walls
Double plasterboard partitions, including studs and tracks 7 cm every 30 cm, including mineral wool insulation, plaster and putty includes a connection between the seams with color
48073,000.00
3
PanelsMaterial, cutting and pasting matches for flooring10010,000.00
4
DoorsIncluding transport assembly and paint + transparent color patches1224,000.00
5
ElecticsElectrical work, including switches and wiring4531,000.00
6
Opening WallsTo open the door including plaster repairs and paint15,500.00
7
Moving air conditioners
Air conditioners dismantling existing assembly +22,300.00
8
Air CondtionersPurchase of air conditioners + assembly, according to plan1042,500.00
9
10
Total Cost188,300.00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Sheet1