ABCDEFGHIJKLMNOPQRSTUVWXYZAA
1
TasksTarget DateStatusAdditional Info
2
Extractor algo upload GitLab20th NovOngoinghttps://its.cern.ch/jira/browse/ATLHI-504
3
Efficiency algo upload GitLab13th NovDonehttps://gitlab.cern.ch/atlas-physics/hi/corrfluc/cofffluceffextractor
4
Send tarball for VnpT studyDone
5
Finish HIJING+Trento model comparisons
6
Apply Closure systematics to pT FlucDone
7
Update Internal note with Closure systematics for pT flucDone
8
9
Start working on initial pT decorrelation plots
10
Write pref emission draftongoing
11
Hijing: effect of jets on pT fluc??ongoing
12
Write internal note for pT dep, eta dep, subevent dep, system size dep, Cent fluc
13
14
Try submitting IP glasma code with bmin=bmax=0 for AuAu first
15
Toy model verofocation of the formula, Try first, then Ask Ollitrualt for derivation
16
17
Upload all Vn plot slides to website
18
Upload all [pT] fluc plots to website
19
Upload all Vn-[pT] corr plots to website, include covariance ratio
20
21
To Do
22
Compare Eff calculations with Adam's Eff, compare results2nd OctoberDone
23
submit code with Ming Eff2nd OctoberDone
24
25
Add Prob>0.5,Prob>0.3, Prob>0.1 and MingEff for all plots (also eff individually)3rd OctoberDone
26
Trajecutum UU Closure check numerically3rd-4th OctoberDone/usatlas/groups/bnl_local/jiaj/data/traj/UU20parn0.5/merge/
27
Prepare Corr Fluc presentation4th OctoberDoneDisscusss with boss on how to proceed / what to say before meeting
28
run MingEff and OriEff Hijing RecEff 5th-6th OctoberDone
29
30
Check with (qual&2)==2 and (qual&2)!=0. Make 2D corr plot to see which one is correct.6th OctoberDone
31
Corr Fluc presentation4th OctoberDone
32
Discussion with Soumya reg. Efficiency calculations4th OctoberDoneAfternoon
33
34
Numerical Closure check with Trajecutm11-12 th OctoberDonepT dependent efficiency, suggestion to use actual pTdependent effieicncy frm data
35
cases for role of PID in Eff and fakes detrmination11-12 th OctoberDone
36
Differential Eff and Fake plots(pT and eta ranges)11-12 th OctoberDonepT: 0.5-1,1-3,3-5; |eta|<0.5, 1.0, 2.5
37
X axis as truth level particles to see if the spurious rise in eff in UCC still exists11-12 th OctoberDoneDoes it matter? It happens beyond the max nch reco limit of 4350
38
Run the whole PbPb code for Systematics and base plots (with closure systematics from PbPb)13th-14th OctoberDone
39
Run the whole XeXe code for Systematics and base plots (with closure systematics from PbPb)14th-15th OctoberDone
40
Send request for ccorr-fluc meeting 15th OctoberDone
41
Meeting with Chemistry GPD16th OctoberDone
42
Make slides to cmpare old and new results (Present in Next Corr-Fluc meeting on 18th)18th OctoberDoneCorr-Fluc meeting: Show final results
43
Buffer21st-22nd OctoberFinished
44
Make Final plots for paper1-2 NovDoneWith old systematics, add systematics from closure, prepare framework
45
Show reuslts in Group meetiing3rd NovDoneComparison between new and old plots
46
Make Final plots for paper3-4 NovDoneWith old systematics, add systematics from closure, prepare framework
47
Read multiple scattering and other processes that smear deltapT/pT or pt resolution from pdg13th Nov
48
Send request for slot in HI weekly13th NovDone
49
HI WEEKLY UPDATE15th NovDone
50
Upload Extractor codeDone
51
Submit Code with cut on zdc-Et and not Nch-Et13-14 NovDone
52
Add systematics for speed of sound determination19-20 NovDone
53
Do speed of sound determnation low to high pT, check evolution of K with pT20th NovDone
54
Speed of sound extraction for pT> 0.5 upto 10 GeV and whaatever range we have Own spectra20th NovDone
55
56
Remake all Internal Note plots with new Efficiency for Pb and Xe21-22 NovDone
57
Rebin plots if necesary after that23rd NovDone
58
Re-Run Pb, Xe Systematics if possibleDone
59
Show speed of sound almost final plots in Corr-Fluc to take suggestions22nd NovDone
60
Upload Efficiency Extractor code to GitLab22nd NovDone
61
Add section in Internal Note for speed of sound determination24-25 NovDone
62
Show updated plots in Group meeting25th NovDone
63
Produce Diff of Internal Note and Reviiew updates/changes26th NovDone
64
Send nternal Note update to EB27th NovDone
65
submit SBF forms to chariise22nd DecDone
66
Edits to Efficiency code on GitLab21-22 DecDone
67
Present in Corr-Fluc meeting on usabiliity, functionalities etcDone
68
Re-obtain Nch Et based plot from Conf note by re-running code, do checks21-25 DecDone
69
Write paper23-25 DecDone
70
Edit paper (Take comments from group, boss)25-27 DecDone
71
Submit paper to EB28/29 DecDone
72
73
74
Re write model part in paper30th JanDonesubmitted V0.2 to EB for comments
75
submit [pT] fluc letter version 0.2 to EB for review30th JanDonesubmitted V0.2 to EB for comments
76
statSigma/sqrt(k2) vs Nch and Et for Pb and Xe for 0.5-5 GeV and 0.5-2 GeV30th JanDoneN_figStatDyn_ieta0.pdf
77
check V2Xe/V2Pb with changing deltaEta gap9th FebDoneV22CmpSubEtaMoreBin.pdf: Why rise for deltaEta>3.7??
78
Fix sytematics for scaled fluctuations: FIne bins in Nch12th FebDonesubmitted V0.3 to EB for comments
79
<qnqn*> vs deltapT/[pT] for 0-0.5% PbPb and XeXe events16th FebDO IT ALL IN SAME CODE
80
Fill [pT] and K2 and K3 as a function of Nch and ZDC16th Feb
81
Fill <qnqn*> in 2D hist for Nch vs Zdc for 0-0.5%, 0-1%, 1-5%,5-10% events16th Feb
82
Compare normalized hists for 20 refmult definitions for Pb and Xe16th Feb
83
Remove ntrk raandomly frm PbPb acc to prob of NchPb/NchXe at 1% or mass No, compare16th Feb
84
85
Prepare slides for crr-fluc: V2, V3, nC4 ratios: Full systematics+BootStraap+AsymErrors20th Feb
86
Upload all Vn plot slides to website17th, 18th Feb
87
Upload all [pT] fluc plots to website17th, 18th Feb
88
Upload all Vn-[pT] corr plots to website, include covariance ratio17th, 18th Feb
89
90
91
92
93
94
95
96
97
98
99
100