GILFORD SCHOOL DISTRICT
3
Capital Improvement Plan August 2017
4
5
2018-20192019-20202020-20212021-20222022-20232023-20242024/2025
6
RequestsRequestsRequestsRequestsRequestsRequestsRequests
7
8
GHS - Track Replacement (Rubber Surface) 2003 $ 120,000
9
Resurface all weather track, remove rubber to asphalt surface and replace (14 years old)
10
11
GHS - Auditorium & Stage LED Lighting 1974 $ 100,000
12
Replace 200 watt incandescent lighting in the HS auditorium ceiling, 1974' vintage with dimmable LEDS, also replace stage spot lights for performances.
13
14
GHS - Auditorium Stage Curtains
15
Replace stage traveler and side curtains high school auditorium, phase 2 of the project which was started 2 years ago (1980 vintage)
16
17
GHS - Classroom Projection Systems
18
Replace and upgrade 6 classroom presentation systems (Projector, smartboard and electricity connection)
19
20
GMS Re-Roofing 2003 15 yr $ 335,000
21
Replace PVC roof at MS, 15 yr roof, PVC is no longer made, replace with TPO roofing
22
23
GES - Gym Masonry Repoint Window Replacement $ 71,000
24
Repoint 1956 brickwork on gymnasuim that is above the flat roof sections, also replace the fixed lite window units. Gym walls 2024 sf. 10 10'x13' windows.
25
26
DW -Wireless Infrastucture Upgrade $ 132,000
27
Replace, upgrade and complete access points mapping district-wide
28
29
GHS and GMS - Fire Alarm System
30
Replace 2003 Fire Alarm Panel and addressable devices at the MS & HS ( Pull stations, detectors and horn strobes)
31
32
33
GHS and GMS - Lighting Upgrades to LED 2003 $ 120,000
34
Exterior wall packs and parking lot lights as well as MS gym ceiling lights from Metal Halide to LED (400w to 80w)
35
36
GHS - Locker Room Renovations 1974 $ 870,000
37
Remove all asbestos backed tile and concrete floors, replace plumbing, showers, toilet fixtures, ceilings (Boys and Girls locker rooms have shared walls and piping connections)
38
39
GES- Roof Replacement - 2008 $ 400,000
40
41
GHS- Roof Replacement - 2008 $ 400,000
42
43
Total $ 335,000 $ 220,000 $ 120,000 $ 203,000 $ 870,000 $ 400,000 $ 400,000
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Sheet1
Sheet2
Sheet3